Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19343B111 + (Forwards Startup Rept, Core 12 Physics Test)
- ML20033A530 + (Forwards Startup Rept, Initial Approach to Power Tests (B-Series), Interim Rept 20, for Period 810523-0822,per Requirements of Tech Spec Section 7.5.1a.Distribution List Encl)
- ML20214C379 + (Forwards Startup Rept, Per Tech Spec 6.9.1.1.Quarterly Updates Will Be Submitted as Required by Tech Spec 6.9.1.3)
- ML17264A601 + (Forwards Startup Rept,Describing Thermal/Hydraulic & Nuclear Testing During Cycle 26 Plant Startup & Power Escalation After Installation of Replacement SGs)
- ML19344D255 + (Forwards Startup Rept,Suppl 2 for Period Ending 800129. Suppls Will Continue Until Completion of Startup Test Program & Commencement of Commercial Power Operation)
- ML19344D256 + (Forwards Startup Rept,Suppl 2 for Period Ending 800129. Suppls Will Continue Until Completion of Startup Test Program & Commencement of Commercial Power Operation)
- ML19208A934 + (Forwards Startup Rept.)
- ML20043C597 + (Forwards Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup. Based on Assessment,Mgt Efforts Taken Through Performance Improvement Plan Appears Substantially on Track)
- ML17299B048 + (Forwards Startup Summary Rept Requested in)
- ML17299B049 + (Forwards Startup Summary Rept Requested in 860108 Ltr)
- ML20024B099 + (Forwards Startup Test Rept 2,consisting of Test Procedures Re Water Level Measurement,Average Power Range Monitor Calibr,Piping & Recirculation Sys)
- ML20024B100 + (Forwards Startup Test Rept 2,consisting of Test Procedures Re Water Level Measurement,Average Power Range Monitor Calibr,Piping & Recirculation Sys)
- B10519, Forwards Startup Test Rept Cycle 5 + (Forwards Startup Test Rept Cycle 5)
- B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria + (Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria)
- ML20148N383 + (Forwards Startup Test Rept Prior to Oper of Cycle 4.W/encl Cycle 4 Calculational Model Changes & CEA Drop Test Results & Analysis)
- ML20100K774 + (Forwards Startup Test Rept Re Test Condition Open Vessel, Heatups 1-6 & Warranty Run)
- FVY-84-132, Forwards Startup Test Rept Vermont Yankee Cycle 11, Per Tech Spec Section 6.7.A.1 Requirements + (Forwards Startup Test Rept Vermont Yankee Cycle 11, Per Tech Spec Section 6.7.A.1 Requirements)
- ML20101L092 + (Forwards Startup Test Rept Vermont Yankee Cycle 16)
- ML17331A129 + (Forwards Startup Test Rept for Cycle 3.Rept Available in Central Files)
- ML19210E072 + (Forwards Startup Test Rept for Cycle 4)
- PM-79-104, Forwards Startup Test Rept for Cycle 4 + (Forwards Startup Test Rept for Cycle 4)
- ML20032C655 + (Forwards Startup Test Rept for Facility)
- ML20197A472 + (Forwards Startup Test Rept for Subj Facil Lic DPR-74 on 780919)
- ML20037A420 + (Forwards Startup Test Rept for Unit 2.W/o Encl)
- ML18086A355 + (Forwards Startup Test Rept, Per Tech Spec 6.9.1.1 Requirements)
- ML18086A356 + (Forwards Startup Test Rept, Per Tech Spec 6.9.1.1 Requirements)
- ML19257C638 + (Forwards Startup Test Rept,Cycle 7)
- ML19257C639 + (Forwards Startup Test Rept,Cycle 7)
- ML20133N058 + (Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage)
- B11732, Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage + (Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage)
- ML20149M741 + (Forwards Startup Test Rept,Vermont Yankee Cycle 19)
- PY-CEI-NRR-0764, Forwards Startup Test Results Final Summary Rept, for Period from 860320-871118 Per Reg Guide 1.16 & Plant Tech Spec Section 6.9 + (Forwards Startup Test Results Final Summary Rept, for Period from 860320-871118 Per Reg Guide 1.16 & Plant Tech Spec Section 6.9)
- ML19254D596 + (Forwards Startup Test Results,Cycle 3)
- ML19254D597 + (Forwards Startup Test Results,Cycle 3.)
- ML20040F521 + (Forwards Startup Test Schedule,Per NRC 820122 Request. Includes Power Vs Time Plot Depicting Startup Program)
- L-79-116, Forwards Startup Testing Info as Suppl to Cycle 3 Reload Safety Evaluation + (Forwards Startup Testing Info as Suppl to Cycle 3 Reload Safety Evaluation)
- ML19340A162 + (Forwards Startup Testing Summary in Response to NRC)
- ML19340A163 + (Forwards Startup Testing Summary in Response to NRC 761012 Ltr)
- ML19291A598 + (Forwards State Agencies Comments on NUREG-0499,Preliminary Statement on General Policy for Rulemaking to Improve Nuclear Power Plant Licensing)
- ML19291A604 + (Forwards State Agencies Comments on NUREG-0499,Suppl 1, Preliminary Statement on General Policy for Rulemaking to Improve Nuclear Power Plant Licensing)
- ML20032A562 + (Forwards State Agencies Comments on Proposed Rules 10CFR2, 19,20,21,30,40,51,61,70,73 & 170 Re Licensing of Low Level Radwaste)
- ML20040G145 + (Forwards State Agency Comments on Proposed Rule 10CFR61 Re Licensing Requirements for Land Disposal of Radwastes. Requests VA Research Ctr for Archaeology Be Contacted If Any Sites Are Contemplated)
- ML20203A156 + (Forwards State Agreement Program Info (SP-97-080) Re Formerly Licensed Sites & Jurisdiction for Remaining Residual Matls)
- ML20029E423 + (Forwards State Agreement Program Info Re NRC Proposed Fee Schedule for FY94)
- ML20148Q499 + (Forwards State Agreements Program Info Re Technical Info on 99Mo/99mTC Generator Mfgs Strike on 970619.Temporary Waiver of Compliance Also Encl)
- ML20151W440 + (Forwards State Assessment of Licensee Response to Insp Repts 50-269/84-33,50-270/84-30 & 50-287/84-34 Concerning Notice of Violation Re Disposal of Oil Containing Low Levels of Radioactivity.Response Meets Requirements.Record Copy)
- ML16161A991 + (Forwards State Assessment of Licensee Response to Insp Repts 50-269/84-33,50-270/84-30 & 50-287/84-34 Concerning Notice of Violation Re Disposal of Oil Containing Low Levels of Radioactivity.Response Meets Requirements of 10CFR2.201)
- ML20206H872 + (Forwards State Comments on Proposed Rulemaking Re Changes to Requirements for Environ Review for Renewal of NPP Operating License, & Errata Ltr)
- ML20106D246 + (Forwards State Correctional Inst at Graterford Inmate Notice of Appeal of ASLB 850129 Decision Denying Inmates Request to Review Sanitized Version of Plant Emergency Plan)
- ML20138F683 + (Forwards State Dept & EPRI Responses Re Lloyd & Fuqua Subcommittee Questions on Highly Enriched U/Low Enriched U. NRC Responses Currently in Commissioner Ofcs for Collegial Action)
- ML19275A165 + (Forwards State Dept 780509 Draft Ltr to Congress Re Extension of 60-day Action Requirement to Export License Applications.List of Affected Applications Encl)
- ML20244C223 + (Forwards State Notification Fact Sheet Inadvertently Omitted from Applicant 890324 Voluntary Responses to Commonwealth of Ma Atty General Requests for Documents on Exercise.W/Certificate of Svc.Related Correspondence)