Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101F475 + (Forwards Revised Figure 5-6 of Physical Security Plan. Figure Reflects Changes to Vital Area Concept for Refueling Water Storage Tank.Figure Withheld (Ref 10CFR73.21))
- ML20094A267 + (Forwards Revised Figure 5.1-4 to Tech Specs Re Boundary for Liquid Effluents.Info Incorporated Into OL Application)
- ML20039E851 + (Forwards Revised Figure 5A to Security Plan.Drawing Withheld (Ref 10CFR2.790))
- ML20247F310 + (Forwards Revised Figure 6.1, Organization Chart for Ford Nuclear Reactor, Reflecting Reorganization of Health Physics Organization.Figure Should Be Included w/890508 Rev 1 to Tech Specs)
- ML20070S427 + (Forwards Revised Figure 6.2-2 to Tech Specs Re Health Physics Organization)
- 1CAN048805, Forwards Revised Figure 6.2-2,Sections 6.5.2.2 & 6.5.2.1 & Description of Amend Request to Suppl Previous Submittals, & 871204.Changes Are to Note Mgt Responsibility for Emergency Preparedness & Fire Protection Function + (Forwards Revised Figure 6.2-2,Sections 6.5.2.2 & 6.5.2.1 & Description of Amend Request to Suppl Previous Submittals, & 871204.Changes Are to Note Mgt Responsibility for Emergency Preparedness & Fire Protection Function)
- ML19341D686 + (Forwards Revised Figure 8 for Rj Holt (PSC of Nh) Testimony Re Seismology.Corrects Drafting Error Whereby Figures on Lefthand Side Were in Error by Order of Magnitude.Related Correspondence)
- ML20065B482 + (Forwards Revised Figure 8.4-1a of FSAR for Insertion. Existing Figure 8.4-1a Contains Safeguards Info & Should Be Destroyed)
- ML20245K236 + (Forwards Revised Figure 9.4-3 to Amend 76 to FSAR for Plant. Matls to Help Facilitate NRC Review of Changes Also Encl)
- ML20059E575 + (Forwards Revised Figure B-1 of 900820 Amend to Certificate of Compliance 5641,providing Expanded Bill of Matls)
- ML20211M642 + (Forwards Revised Figure NT-068-050 for Placement in App B of Recommendation for Application of Supplemental Stds, of Completion Rept for Naturita,Co,Vicinity Property NT-068S. Original Figure Contained Inconsistency)
- ML20040B245 + (Forwards Revised Figure Re Froth Impact Loads.Revision Illustrates Added NRC Conservatism of 3 Psi to Forth Impact Pressure as Defined by Figure of NRC Presentation Best Estimate Methodology for Froth Impact Loads)
- ML17277B187 + (Forwards Revised Figure Where Approx 18 Square Ft Area Around Pgcc Column Replaced W/Richlite Floor Plates in Fire Protection Sys to Eliminate Personnel Safety Hazard.Addl Matl Does Not Compromise GE Rept Recommendations)
- ML17298B271 + (Forwards Revised Figures & Pages to Chapter 13 of FSAR, Reflecting Changes Not Already Made in Amend 13.Figures 13.1-2A,13.1-3A,13.1-3B,13.1-3C & 13A-1 Should Be Deleted)
- ML20214N334 + (Forwards Revised Figures 1,2 & 3 for Inclusion in 860523 Peaking Factor Limit Rept for Cycle 4 Reload.Revs Reflect Appropriate W(Z) Functions for RAOC Operation)
- ML20040C965 + (Forwards Revised Figures 1-4 Which Define Affected Areas of Steam Generator Tube Bundle to Which Util Proposed to Limit Cycle 5 Refueling Outage Steam Generator eddy-current Exams. Revised Figures Part of Proposal to Limit Inservice Insp)
- ML20128Q419 + (Forwards Revised Figures 1-4,indicating Effect of Crediting High Main Coolant Sys Pressure Trip Previously Submitted in 850509 Response to NRC Request for Addl Info on Proposed Change 184 to License DPR-3)
- ML20235G936 + (Forwards Revised Figures 1.4-5 & 1.4-6 & Tables 7.1-3 & 7.1-4 to 870722 Rev 5 to Updated Fsar,Reflecting Addition of Steam Line Rupture Detection/Isolation Sys & Environ Qualification Program)
- ML19210C174 + (Forwards Revised Figures 10 & 12 for Des & Revised Source Terms Accounting for Changes in Treatment of Liquid & Gaseous Waste.Also Provides Revised First Paragraph for Liquid Waste Section on Page III-17 of Des)
- ML20209H499 + (Forwards Revised Figures 6.2-1, Offsite Organization & 6.2-2, Unit Organization for Incorporation Into Final Draft Tech Specs.Encls Replace Figures Currently Found in Section 6.0, Administrative Controls of Tech Specs)
- ML13322A548 + (Forwards Revised Figures 6.2.1.1 & 5.2-1 to Proposed Tech Specs Change 77 Incorporating Corporate Level Organizational Change)
- ML19332F349 + (Forwards Revised Figures A,B & G-K to Plant Security Plan. Figures Withheld (Ref 10CFR73.21))
- NRC-84-0060, Forwards Revised Figures Not Included in Rev 14 to FSAR Re Update to Main Steam Line Break Analyses.Revised Figures for Inadvertent Operation of ECCS Analysis Impact Also Encl. Revised Figures Will Be Incorporated in Rev 15 to FSAR + (Forwards Revised Figures Not Included in Rev 14 to FSAR Re Update to Main Steam Line Break Analyses.Revised Figures for Inadvertent Operation of ECCS Analysis Impact Also Encl. Revised Figures Will Be Incorporated in Rev 15 to FSAR)
- ML20065P614 + (Forwards Revised Figures for Incorporation Into App B, Peaking Factor Limit Rept,To Reload Safety Evaluation for Cycle 2 Reload Operations)
- ML17334B360 + (Forwards Revised Figures for Loss of Load Event Previously Submitted in Attachment 4,App B of Vantage 5 Reload Transition Safety Rept Supplied by Westinghouse in Jan 1990. Update Is Editorial in Nature)
- ML20247K627 + (Forwards Revised Filing Instructions for Rev 7 to Updated FSAR)
- ML20245J929 + (Forwards Revised Final Calculations for Tuba City Umtra Site Radon Barrier & Response to Concerns in . Calculations Streamlined & Revised to Incorporate Changes in long-term Moisture Content & Field Porosity Measurements)
- ML19322C202 + (Forwards Revised Final Const Rept Through 780528,in Response to Util Request.Listing of Quantities of Matls Installed for Wks Ending 771027,1130,1228 & 780125 Encl)
- ML19323F751 + (Forwards Revised Final Deficiency Rept (Significant Deficiency 79-03) Re Crane Wall & Cubicle Wall Reinforcing Bars)
- ML19323F752 + (Forwards Revised Final Deficiency Rept (Significant Deficiency 79-03) Re Crane Wall & Cubicle Wall Reinforcing Bars)
- ML19296A972 + (Forwards Revised Final Deficiency Rept Providing Supplemental Info Re Piping Embedded in Structural Concrete)
- ML19296A973 + (Forwards Revised Final Deficiency Rept Providing Supplemental Info Re Piping Embedded in Structural Concrete)
- ML19259D373 + (Forwards Revised Final Deficiency Rept Re Potential Excessive Water Hammer Forces in Main Feedwater Sys)
- ML19259D374 + (Forwards Revised Final Deficiency Rept Re Potential Excessive Water Hammer Forces in Main Feedwater Sys)
- ML19312B649 + (Forwards Revised Final Deficiency Rept Re Potential Excessive Water Hammer Forces in Main Feedwater Sys)
- ML19312B651 + (Forwards Revised Final Deficiency Rept Re Potential Excessive Water Hammer Forces in Main Feedwater Sys)
- ML19320C024 + (Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond)
- ML19320C025 + (Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond)
- ML19250A807 + (Forwards Revised Final Deficiency Rept Re Flexible Bellows Penetrations of Steel Containment Vessel Misaligned During Installation)
- ML19250A808 + (Forwards Revised Final Deficiency Rept Re Flexible Bellows Penetrations of Steel Containment Vessel Misaligned During Installation)
- ML19296D335 + (Forwards Revised Final Deficiency Rept Re Piping Embedded in Structural Concrete)
- ML19296D336 + (Forwards Revised Final Deficiency Rept Re Piping Embedded in Structural Concrete)
- ML19270F063 + (Forwards Revised Final Deficiency Rept Re High Pressure Fire Protection Pump Failures)
- ML19270F064 + (Forwards Revised Final Deficiency Rept Re High Pressure Fire Protection Pump Failures)
- ML19320B074 + (Forwards Revised Final Deficiency Rept Re Spent Fuel Pool Gates)
- ML19320B075 + (Forwards Revised Final Deficiency Rept Re Spent Fuel Pool Gates)
- ML20064K758 + (Forwards Revised Final Draft Responses to Procedures & Test Review Branch,Structural Engineering Branch,Radiation Assessment Branch & Power Sys Branch 820825 Requests for Addl Info Re GESSAR-II,per Util 821110 & 1217 Submittals)
- ML20069B842 + (Forwards Revised Final Draft Responses to Power Sys & Reactor Sys Branch Questions,Per 820825 & 1115 Requests.Only Mods (New or Revised) to Responses of Referenced Ltrs Provided)
- ML20071D674 + (Forwards Revised Final Draft Responses to NRC 820825 & 1115 Requests & Mechanical Engineering Branch SER Meetings.Draft Revs to Reg Guides 1.31 & 1.44 Encl)
- ML20069E653 + (Forwards Revised Final Draft Responses to Selected Commission 820825 & 1005 Questions Re Fire Protection,Leak Rate Testing & ESF Sys.Proposed Resolution Discussion Items Encl)
- ML20028G079 + (Forwards Revised Final Draft Responses to NRC 820825,1005 & 1115 Info Requests & Mechanical Engineering Branch Draft SER Meetings)