Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE J. H. DRAKE ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT May 11, 1979 213-572-2258 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Provisional Operating License No. DPR-13 Amendment No.
77 San Onofre Nuclear Generating Station Unit 1 By letter dated April 18, 1979, we submitted Amendment No. 77 in Docket No. 50-206.
Amendment No. 77 con sists of Proposed Change No. 77 to the Technical Specifications incorporated in the above-numbered license.
Proposed Change No. 77 reflects San Onofre Unit 1 and corporate reorganization changes.
The corporate reorganization changes are reflected in Figure 6.2.1.1 (Appendix A Technical Specifications) and Figure 5.2-1 (Appendix B Environmental Technical Specifications) of Proposed Change No. 77.
In order to incorporate a recently announced corporate level organization change, these figures have been revised to reflect a change in reporting relation ship between the Vice President (Power Supply) and Senior Vice President.
In addition, the figures reflect a change in the reporting relationship between the Nuclear Control Board and the Senior Vice President.
Enclosed are forty copies each of revised Figures 6.2.1.1 and 5.2-1 which supersede the corresponding figures of Proposed Change No. 77.
In accordance with Technical Specifi cation requirements, the enclosed figures have been reviewed and approved by the San Onofre Unit 1 review committees and are incorporated into and made a part of Proposed Change No. 77 herein by reference.
'~961'Z 2 7
-2 Since Proposed Change No. 77 was determined to be a Class II license amendment request, the corresponding fee of
$1,200.00 was remitted with our April 18, 1979 letter. Accordingly, no additional fees accompany this letter.
Very tr, ly yo rs, Enclosures
CHAIRMAN OF 'E BIARD PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDET VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDEN NUCE (UEL ICAPLY ).(POWER SUPPLY)
(SYSTEM (ENGINEERING &
(ADVANCED ONTO IDEVELOPMENT)
CONSTRUCTON)
ENGIN:ERING)
BOARD GENERAL NUCLEAR SUPERI DENT AUDIT AND REVIEW MANAGER OF MANAGER OF MANAGER OF OMMITTEE STEAM GENERATION ENVIRONMENTAL ENGINEERING DESIGN AFFAIRS MANAGER OF GENERATION ENGINEERIG3 SERVICES HEAD(UJART7ERS
- MANAGER, CHIEF OF CHIEF OF
- MANAGER, STAFF NUCLEAR GENERATION NUCLEAR DEVELOPMEN AND QUALITY I
ENGINEERING ENVIBOMaTAL ASSURANCE ENGINEERING
-m--mmm-mm m
mmmmmmm-m m mm m mm mmmmmmmmmm mm mmmmm m m
m m m STATION PLANT ON-kITE STAFF MANAGER REVIEW ooMMITrEE FIGURF 5.2-1 SOUTHRns CALIFORNIA EDISON COMPANY CORPORATE ORGANIZATION
FITURE 6.2.1.1 OFFSITE O1ANIZATION*
CHAIRMAN OF THE BOARD I
PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PR SIDENT VICE PRIDENTNCL (FJEL SUPPLY )
(POWER SUPPLY)
(SYSTEM (ENGINEERING &
(ADVANCED CONTROL DEVEIOPMENT)
CONSTRCTION)
ENGINEERING)
BOARD I
5
- GENERAL NUCLEAR SUPERITENDENT AUDIT AND REVIEW MANAGER OF MANAGER OF MANAGER OF COMMITTEE STEAM GENERATION ENVIRONMENTAL ENGINEERING DESIGN AFFAIRS MANAGER OF I
GENERATION ENGINEERING SERVICES HEADQUARITERS
- MANAGER, CHIEF OF CHIEF OF
- MANAGER, STAFF NUCLEAR GENERATION NUCLEAR DEVELOPMENT AND QUALITY ENGINEERING ENVIRONMENTAL ASSURANCE ENGINEERING mm m
~
m -mm m
mni STATIN PLANT N ITE STAFF MANAGER REVIEW coKMITrEE