ML20039E851

From kanterella
Jump to navigation Jump to search
Forwards Revised Figure 5A to Security Plan.Drawing Withheld (Ref 10CFR2.790)
ML20039E851
Person / Time
Site: Nine Mile Point 
Issue date: 01/04/1982
From: Sunser J
NIAGARA MOHAWK POWER CORP.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8201110546
Download: ML20039E851 (1)


Text

.

i N u mc.GARA Y NIA iAwx MAGARA McHAWK POWER CORPORA i M/300 E RIE DOULEVAND WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 4741511 January 4, 1982

  • / o) t-9 Director of Huclear Reactor Regulation

..cp ' F t g

gG o\\p Attention: Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #2

.. e U. S. Nuclear Regulatory Commission d,

pY g f' d $

Washington, D. C. 20555 g

jggg-6 51V.M(p v

Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Ippolito:

Our letter dated November 30, 1981 transmitted a 10 CFR 50.54(p) change to the approved Nine Mile Point Unit 1 Security Plan. The attached drawing was inadvertently omitted f rom that transmittal. Therefore, attached are five (5) copies of revised Figure SA to the Nine Mile Point Unit 1 Security Plan. This

]

figure replaces the existing Figure SA in its entirety.

Pursuant to Section 2.790 of the Commission's Rules of Practice and Part 9.5 of the Commission's Regulations, we hereby request that the material submitted with this letter be withheld from public disclosure.

Very truly yours, NIAGARA M0 HAWK P0hjR CORPORATION i

0 m.

(,'

Q^)3pedl Jdse/ph T.' Sunser Manager, System Security PEF:Ja xc: Of fice of Inspection and Enforcement foo/

Region I

.s/r i

I 8201110546 820104 i

PDR ADOCK 05000220 I

F PDR