Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19302F580 + (Forwards Reviews of Procedures Proposed by Utils in Emergency Plans to Consider Meteorological Conditions at Facilities,In Response to Task Order 1 of Interagency Agreement)
- B10038, Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels + (Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels)
- ML19329D961 + (Forwards Revised & Approved Abstract Re NRC Needs in Field of Strong Motion Seismology Presented at Rancho Sante Fe Meeting.Requests Abstract Publishing Date & Location)
- ML20128N918 + (Forwards Revised & Augmented Responses Discussed During 960307 Performance Demonstration Initiative (PDI) Steering Committee Meeting Re NRC Assessment of PDI Program)
- L-95-130, Forwards Revised & EPA Approved NPDES Permit for Turkey Point + (Forwards Revised & EPA Approved NPDES Permit for Turkey Point)
- ML20011A829 + (Forwards Revised & More Detailed Schedules for Implementing NUREG-0737,Items II.B.3,II.F.1.1,II.F.1.2 & II.F.1.6,per NRC 810930 Request for Notification of Deviations from TMI Action Plan Schedule)
- ML20151L311 + (Forwards Revised & New Relief Requests & Program Corrections to Second 10 Yr Inservice Testing Program.Addl Review of Program Identified Need for Further Changes to Program Including Rev of Existing Relief Requests)
- ML20004C636 + (Forwards Revised & Supplemented Responses to Structural Engineering Branch Questions Per 810520 Request.Addl Info Re Condensation Oscillation Loads,Pool Swell Impact Loads & Fatigue Considerations Encl)
- ML20154Q375 + (Forwards Revised & Updated 10CFR50,App R Comparison.Rev to FSAR 9.5.1.1 Re Nepa/Ul Deviations Will Be Incorporated Into Future FSAR Amend.Requests Acceptability of Ref Comparison Be Reflected in Sser)
- ML19289D339 + (Forwards Revised & Updated Drawings as Suppl 3 to Wiring Schematic Package Drawings Initially Submitted 770225. Package Reflects Matl Contained in Index of Section 1.7 for Facility FSAR)
- ML19282C089 + (Forwards Revised & Updated Pages to Physical Protection Plan Reflecting Revised Operational Procedures & New Closed Circuit Tv Mods.Encl Being Withheld (Ref 10CFR2.790))
- AECM-81-462, Forwards Revised & Updated Response to Auxiliary Sys Branch Question 10.30 Re Failure of Drive/Cooling Water Pressure Control Valve F003.Info Supersedes 810904 Response & Will Be Incorporated Into FSAR Amend 51 + (Forwards Revised & Updated Response to Auxiliary Sys Branch Question 10.30 Re Failure of Drive/Cooling Water Pressure Control Valve F003.Info Supersedes 810904 Response & Will Be Incorporated Into FSAR Amend 51)
- ML19331B507 + (Forwards Revised & Upgraded Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20134D211 + (Forwards Revised & marked-up TS Bases Pp to Licenses DPR-29 & DPR-30 Which Deletes Noted Sentence from Bases)
- ML20134D214 + (Forwards Revised & marked-up TS Bases Pp to Licenses DPR-29 & DPR-30 Which Deletes Noted Sentence from Bases)
- L-97-262, Forwards Revised 0-EPIP-20127, Duties of Assembly Area Supervisor. Primary Reason for Change Was to Upgrade Format of Procedure + (Forwards Revised 0-EPIP-20127, Duties of Assembly Area Supervisor. Primary Reason for Change Was to Upgrade Format of Procedure)
- ML20215N385 + (Forwards Revised 1/4 Scale Production Test Matrix to Reflect Addl Two Tests in River Bend Configuration.Manner in Which Production Tests Run Revised After Completion of Perry Tests)
- ML20206E287 + (Forwards Revised 10CFR170 & Requests Payment of Application Fee for 860415 Application for Approval of QA Program)
- ST-HL-AE-1717, Forwards Revised 10CFR50,App K ECCS Analysis Incorporating Revs in Nominal Accumulator Water Vol & in Westinghouse Bart Computer Program.Mods to Bart Program Discussed in Detail in Westinghouse to NRC + (Forwards Revised 10CFR50,App K ECCS Analysis Incorporating Revs in Nominal Accumulator Water Vol & in Westinghouse Bart Computer Program.Mods to Bart Program Discussed in Detail in Westinghouse to NRC)
- ML20138F315 + (Forwards Revised 10CFR50,App R Fire Protection Exemption Requests as Result of NRC Audit During Wk of 850719 of Util 850313,0626 & 0719 Exemption Requests.Mods Will Be Completed No Later than Second Quarter 1986)
- ML19340D245 + (Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl)
- ML19340D244 + (Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl)
- ML19340D243 + (Forwards Revised 10CFR50.48 & App R to 10CFR50 Re Five Protection Features of Nuclear Power Plants.Rules Take Effect 810217.Summary Listing of Open Items Re Fire Protection Features of Facility Encl)
- LR-N990405, Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources + (Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources)
- ML20148B795 + (Forwards Revised 10CFR50.92 No Significant Hazards Analysis Which Addresses Each Proposed Change Individually & Provides Addl Details on Nature of Requested Changes)
- ML20129J502 + (Forwards Revised 10CFR71 QA Program Approval)
- ML20046B558 + (Forwards Revised 10CFR71 QA Program for Industrial Radiography Licensees)
- ML20213E076 + (Forwards Revised 10CFR72 QA Sys,Per 860619 Submittal,To Reflect QA Activities Used to Comply w/10CFR72,Subpart G & 10CFR50,App B)
- ML18152B333 + (Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves)
- ML20044G771 + (Forwards Revised 18F Introduction,For Discussion)
- ML18092A171 + (Forwards Revised 1983 Semiannual Radioactive Effluent Release Rept. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Util for Jul-Dec 1983)
- ML18092A172 + (Forwards Revised 1983 Semiannual Radioactive Effluent Release Rept. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Util for Jul-Dec 1983)
- ML20210B949 + (Forwards Revised 1985 Annual Landfill Operations Rept for Solid Waste Disposal Site 2. Revised Cubic Yd Values Compare More Closely W/Value for Available Storage Reported on Survey Drawing)
- ML20210C003 + (Forwards Revised 1985 Annual Landfill Operations Rept for Solid Waste Disposal Site 3. Conversion Factor Corrected to Compare More Closely W/Value for Available Storage Reported on Survey Drawing)
- 0CAN078711, Forwards Revised 1985 Semiannual Radioactive Effluent Release Rept,Per Commitment in Response to Insp Repts 50-313/87-01 & 50-368/87-01 + (Forwards Revised 1985 Semiannual Radioactive Effluent Release Rept,Per Commitment in Response to Insp Repts 50-313/87-01 & 50-368/87-01)
- ML20126C626 + (Forwards Revised 1985 Yankee Nuclear Power Station Emergency Exercise & Evaluation Plan. Rev Incorporates C Gordon (Region I) Comments.Withholding of Plan Requested Until Completion of Exercise (Ref 10CFR2.790))
- ML20073D067 + (Forwards Revised 1989 Annual Environ Operating Rept, Clarifying Section 4.1 of Environ Protection Plan Re Nonroutine Repts to NRC & Section 6 of Annual Rept to Delete Reporting of Two Environ Events at Plant Site in 1989)
- ML15217A105 + (Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations)
- ML15217A107 + (Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations)
- ML20058Q251 + (Forwards Revised 1992 Annual Radiological Environ Monitoring Rept. Table 5-3 Revised to Include Statement Re Preventing Recurrence of Lost Sample,Inadvertently Omitted from Rept)
- ML20058Q307 + (Forwards Revised 1992 Annual Radiological Environ Monitoring Rept. Table 5-3 Revised to Include Statements Re Plans for Preventing Recurrence of Lost Samples, Inadvertently Omitted from Rept)
- ML20249B431 + (Forwards Revised 30-day Event Rept 98-05,rev 1 Re Discovery That Some Autoclave Containment Isolation Valves Were Not Capable of Closing When Relying on safety-related Backup Air Supply Reserviors.Encl Replaces Previous Rept,Entirely)
- ML20154R892 + (Forwards Revised 30-day Written Event Rept 97-22,rev 3.Rept Is Being Revised to Change Completion Date of Corrective Action 4.Actual Completion Date Was 980227 Instead of 980204)
- ML20147H053 + (Forwards Revised 50.54f Ltr & Associated Commission Paper)
- LIC-90-0904, Forwards Revised 6-month fitness-for-duty Rept for Period Ending 900630,per NRC 901031-1102 Insp + (Forwards Revised 6-month fitness-for-duty Rept for Period Ending 900630,per NRC 901031-1102 Insp)
- ML20037B029 + (Forwards Revised 610711 Exhibit A,Listing High Radiation Areas in Existence Since 640412.Discusses Method Followed in Locked High Radiation Area Procedure)
- ML19270H546 + (Forwards Revised 680401 Page 1 of ACRS 680406 Rept Entitled Rept on TMI-1. W/O Encl)
- ML19319B162 + (Forwards Revised 700908 Final Evaluation of FSAR Reflecting Changes Submitted in All Amends Through Amend 34.Outstanding Items Remaining from Review of Topical Rept BAW-10008 Parts 1 & 2 Acceptable.Criteria for Seismic Program Encl)
- ML19326C971 + (Forwards Revised 740221 Facility Operator Requalification Program,Incorporating AEC 740321 Comments)
- ML19329E901 + (Forwards Revised 760329 QA Program,Per 760924 NRC Request. QA Program Modified,Identifying CPC-1A,Revision 4 as Appropriate Ref.Reg Guide 1.54 & 1.94 Positions Have Been Inserted Into QA Program)
- ML19329F191 + (Forwards Revised 761103 Proposed Facility QA Program Description Resolving NRC Questions for NRC Acceptability Evaluation.B&W Commitment Implementation Date Will Be Provided When Determined)