- ML17215A481 + (Forwards Request for Addl Info Re Creep Collapse in C-E Fuel Remaining in-core for Resolution of License Condition Imposed in Amend 63 to License DPR-67)
- ML20210T253 + (Forwards Request for Addl Info Re Criteria for Underground Cable Installations for Class 1E Sys.Info Needed to Complete Review of Application)
- ML17194A663 + (Forwards Request for Addl Info Re Criteria for Evaluating Exemption Request & Design Descriptions of Mod Required to Meet Section III.G.3 of App R to 10CFR50 & 10CFR50.48(C)(5), Alternative Safe Shutdown)
- ML17054A114 + (Forwards Request for Addl Info Re Criticality Analysis Supporting Requested Spent Fuel Pool Expansion.Request Formally Documents 830823 Telex Request.Response Must Be Submitted in Time to Complete NRC Review by 830930)
- ML20199J359 + (Forwards Request for Addl Info Re Crystal River 3 Nuclear Plant,Summary Rept on Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,)
- ML17278B047 + (Forwards Request for Addl Info Re Current Condition of Unit 2 Compared to Regulations,License & Commitments to Fire Protection Program.Requests Response within 30 Days of Ltr Receipt)
- ML19347E554 + (Forwards Request for Addl Info Re Cycle 2 Reload Rept)
- ML20041G301 + (Forwards Request for Addl Info Re Cycle 6 Phase Ii.Info Should Be Provided within 30 Days)
- ML19319A896 + (Forwards Request for Addl Info Re Cycle 3 Reload Application.W/O Encl)
- ML20133N775 + (Forwards Request for Addl Info Re Cycle 9 Reload Including Explanation of Addl Margin for Future Cycles in Changes to Tech Spec Figures 2.1-2,3.10-2,3.10-3,3.10-9 & 3.10-10)
- ML19343D154 + (Forwards Request for Addl Info Re Cycle 2 Reload Rept & Supporting Documents.Complete Description of Cetop Program Methodology,Algorithm & Usage for Reload Should Be Provided)
- ML15223A701 + (Forwards Request for Addl Info Re Cycle 6 Reload.Nrc Assumptions Discussed in Encl Should Be Verified as Correct & Applicable to Facility for Proposed Cycle of Operation)
- ML20024F027 + (Forwards Request for Addl Info Re Cycle 2 Reload.Response Requested by 830909)
- ML19352A344 + (Forwards Request for Addl Info Re Cycle 2 Reload Rept & Instrumentation & Controls Sys in Response to Util 810220 & 0305 Submittals.Questions Re Other Issues Addressed in 800829 Submittal Provided)
- ML17215A696 + (Forwards Request for Addl Info Re Cycle 2 Reload to Complete Review of Application to Amend License NPF-16)
- ML19210A714 + (Forwards Request for Addl Info Re Cycle 2 Reload.Requests Response within 10 Days of Receipt of This Ltr)
- ML20211C720 + (Forwards Request for Addl Info Re DOE 750926 Request for Review of Model AL-L8)
- ML19326A804 + (Forwards Request for Addl Info Re Decay Heat Pump 1A Shaft Failure Per 780707 Submittal)
- ML20198K878 + (Forwards Request for Addl Info Re Decommissioning Plan & License Termination Request for Facility License R-97 for Georgia Tech Research Reactor Submitted on 980701)
- ML20213A644 + (Forwards Request for Addl Info Re Decommissioning Plan Supporting Application for Authorization to Decommission Facility.Response Requested within 30 Days)
- ML20248J995 + (Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity)
- ML20236C938 + (Forwards Request for Addl Info Re Decommissioning Phase II Plan Submitted on 880610 & Suppls on 880621 & 1207.Response Requested within 15 Days of Ltr Date)
- ML20205E807 + (Forwards Request for Addl Info Re Decommissioning Plan. Response Requested by 851121)
- ML20055E044 + (Forwards Request for Addl Info Re Decommissioning Plan, Submitted by .Response Requested within 30 Days of Ltr Date)
- ML20059K104 + (Forwards Request for Addl Info Re Decommissioning Funding Plan)
- ML20028H408 + (Forwards Request for Addl Info Re Decommissioning Plan)
- ML13330A170 + (Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt)
- ML17298A886 + (Forwards Request for Addl Info Re Deficiency Rept DER 81-35 Concerning Leaks in Temporary Water Lines That Distributed Backfill Under Seismic Category I Structures.Responses Requested within 2 Wks of Ltr Receipt)
- ML20052B117 + (Forwards Request for Addl Info Re Deficiencies in Structural Steel Bolting Mfg by Morrison-Knudson)
- ML19350D518 + (Forwards Request for Addl Info Re Degraded Grid Protection for Class IE Power Sys within 45 Days)
- ML20049H558 + (Forwards Request for Addl Info Re Degraded Grid Voltage Protection.W/O Encl)
- ML14190A318 + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Review Util 790124 Submittal)
- ML19274G002 + (Forwards Request for Addl Info Re Degraded Grid Voltage to Be Sent to Licensee in Order to Complete Review of 780504 Submittal.Response Required within 45 Days)
- ML20002B170 + (Forwards Request for Addl Info Re Degraded Grid Voltage. Table 1 Does Not Show Set Point of Second Level Undervoltage Relays as Stated in Ref a)
- ML20040F660 + (Forwards Request for Addl Info Re Degraded Grid Voltage Protection.Response within 30 Days Requested.W/O Encl)
- ML20028A132 + (Forwards Request for Addl Info Re Degraded Grid Protection Based on Review of .Info Should Be Provided within 30 Days)
- ML19305E284 + (Forwards Request for Addl Info Re Degraded Grid Voltage. Also Requests Revised Schedule for Submission of Design of long-term Mods Re Adequacies of Station Electric Distribution Sys Voltages)
- ML19225D098 + (Forwards Request for Addl Info Re Degraded Grid Voltage for Review of Proposed Tech Spec Changes to Incorporate Addl Electric Power Sys Surveillance Requirements.Requests Submittal within 90 Days)
- ML19241B536 + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Complete Review of Util 770801 Submittal)
- ML20004G036 + (Forwards Request for Addl Info Re Degraded Grid Voltage & Station Electric Distribution Voltages.Info Requested within 30 Days of Receipt of Ltr)
- ML19274F979 + (Forwards Request for Addl Info Re Degraded Grid Voltage, to Be Sent to Licensee in Order to Complete Review of 771010 Submittal.Response Required within 45 Days)
- ML19241B538 + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Review Util 771222 Submittal)
- ML19253A666 + (Forwards Request for Addl Info Re Degraded Grid Voltage, Needed to Complete Review of Licensee 780512 Submittal on Second Level Undervoltage Protection)
- ML19242A209 + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Continue Review of 790625 Submittal)
- ML18043A836 + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Continue Review of 781002 Submittal)
- ML13317B156 + (Forwards Request for Addl Info Re Degradation of Intake Structure & Insp of Accessible Areas of Structure)
- ML19242B541 + (Forwards Request for Addl Info Re Degraded Grid Voltage. Response Requested within 45 Days)
- ML19329A881 + (Forwards Request for Addl Info Re Degraded Grid Voltage Condition & Offsite Power Sys.Response Required by 770204)
- ML17192A906 + (Forwards Request for Addl Info Re Degraded Grid Voltages. Requests Response within 45 Days)
- ML13317A839 + (Forwards Request for Addl Info Re Degraded Grid Voltage Protection,Including Design & Operation Info & Drawings That Show Relay Location & Logic.Response Requested within 30 Days)
- ML18081B347 + (Forwards Request for Addl Info Re Degraded Grid Voltage to Complete Review of Licensee 770727 Submittal)