Forwards Request for Addl Info Re Degraded Grid Voltage for Review of Proposed Tech Spec Changes to Incorporate Addl Electric Power Sys Surveillance Requirements.Requests Submittal within 90 Days
ML19225D098
Person / Time
Site: Pilgrim
Issue date: 06/19/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Andognini G
BOSTON EDISON CO.
References
NUDOCS 7908060544
Download: ML19225D098 (3)


Text

,

/

UNITED STATES

[v.

NUCLEAR REGULATORY COMMISSION

{

P y

WASHINGTON, D. C. 20555 5..

s%

_ /

E=

,/

JUNE i 9 E9 i..

=p :. u Docket No. 50-293

=0 t.~as ::

=

Mr. G. Carl Andognini

~

Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Andognini:

We are reviewing your submittal of August 24, 1977, regarding proposed changes to the Pilgrim Nuclear Power Station Technical Specifications

=

to incorporate additional electrical power system surveillance requirements.

We have determined that the additional information requested in the enclosure is necessary in order to complete our review.

5-..

=

To enable us to maintain a review schedule consistent with our

~*

objective of resolving this issue by the end of 1979, please submit

~~~

the requested information within 90 days of receipt.

"" ~

We appreciate your cooperation on this issue.

Sincer y,

NW i '(w uw bl...

~

o,as A. I polito, Chief Os rating eactors Branch #3 sL=

Division Operating Reactors Eff-

.2::.7;:.".

Enclosure:

Request for Additional Infomation i.E~

cc w/enelosure:

_. ;;=_

see next page

= = - -..

~*:.*-*-

7'.^.

=

5

=.

7 9,0-80 60s4Y 416 003

l' 3

Mr. G. Carl Andognini

F cc Mr. Paul J. McGuire

']('

Pilgrim Station Acting Manager Boston Ediso.n Company

=

RFD 71, Rocky Hill Road

1 Plymouth, Massachusetts 02360 E

Anthony Z. Roisman Natural Resources Defense Council 91715th Street, N. W.

Washington, D. C.

20005 Ii Henry HerrTnann, Esquire 5[;i -

Massachusetts Wildlife Federation 151 Tremont Street g

Boston, Massachusetts 02111 i.; --

Plymouth Public Library North Street

" ~ '

Plymouth, Massachusetts 02360

.=

~'

tii:

hh---

L t

i Es b.. _.

416 00?

m

REQUEST FOR ADDITIONAL INFORMATION PILGRIM UNIT N0. 1 DEGRADED GRID VOLTAGE (TAC 10041)

1. Table 3.2.B Instrumentation That Initiates or Controls the Core and Containment Cooling Systens, Boston Edison Company letter to NRC, dated August 24, 1977, gives a degraded voltage trip point of 3798 volts with 5.2 seconds time delay.

The time delay appears to be too short and could cause a oroblem with short duration power disturbances.

Provide the analysis and isis fcr your selection of the 5.2 second time delay,

2. State and describe total number of channels per bus in your system for the second level undervoltage protection.

State applicable operating i

modes and action.

Refer to Table 3.3-3, Engineered Safety Feature r

Actuation System Instrumentation, NRC letter dated June 2,1977 (Safety Evaluation and Statement of Staff Positions Relative to the Emergency Power Systems and Operating.)

3. The voltage monitors shall be designed to satisfy the requirements of IEEE Std. 279-1971, " Criteria for Protection Systems for Nuclear Power Generating Stations." State your compliance with this requirement, and include sufficient description for us to verify compliance of your design.

9 m

416 010

.