Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217C508 + (Forwards Rept on AP600 Matrix Test 12 Performed in Facility in Italy.Purpose of Test Program to Acquire Data for Development & Validation of W Accident Analysis Computer Codes)
- RBG-26365, Forwards Rept on ATWS Mods,Per Paragraph (c)(6) of 10CFR50.62,demonstrating Adequacy of Facility Sys Required to Meet ATWS Rule,Per Util .All Mods Planned to Be Completed During Refueling Outage Scheduled for 870915 + (Forwards Rept on ATWS Mods,Per Paragraph (c)(6) of 10CFR50.62,demonstrating Adequacy of Facility Sys Required to Meet ATWS Rule,Per Util .All Mods Planned to Be Completed During Refueling Outage Scheduled for 870915)
- ML20239A317 + (Forwards Rept on Adequacy of Testing & Analysis Programs Considering Station Blackout & ATWS Scenarios,Per NRC 870630 Request.Design & Procedural Mods Discussed Should Be Evaluated in Response to Pending Regulatory Requirements)
- ML20150D689 + (Forwards Rept on Administration of FOIA by NRC for CY87,per Public Law 93-502)
- ML20126F464 + (Forwards Rept on Administration of FOIA by NRC for CY80, Per Public Law 93-502)
- ML19250D559 + (Forwards Rept on Administration of FOIA by NRC for CY80, Per Public Law 93-502)
- ML19250D560 + (Forwards Rept on Administration of FOIA by NRC for CY80, Per Public Law 93-502)
- ML19250D556 + (Forwards Rept on Administration of FOIA by NRC for CY80, Per Public Law 93-502)
- ML19250D558 + (Forwards Rept on Administration of FOIA by NRC for CY80, Per Public Law 93-502)
- ML20033E080 + (Forwards Rept on Administration of FOIA by NRC for CY89)
- ML20207T258 + (Forwards Rept on Administration of FOIA by NRC for CY86,per Public Law 93-502)
- ML19250D551 + (Forwards Rept on Administration of FOIA by NRC for CY80,per Public Law 93-502)
- ML20202C422 + (Forwards Rept on Administration of Freedom of Info Act for FY98.Rept Submitted IAW 5 U.S.C. 552(e) as Amended by Electronic Freedom of Info Act Amends of 1996 & IAW Doj,Ofc of Info & Privacy,Guidelines in FOIA - Update,Summer 1997)
- ML19270G809 + (Forwards Rept on Alterations to Reactor Facility.Physical Security Plan Being Revised to Reflect Rept.Rept Withheld (Ref 10CFR2.790))
- ML20028D903 + (Forwards Rept on Ambient Noise Survey, in Response to Question E 290.34)
- ML20028D904 + (Forwards Rept on Ambient Noise Survey, in Response to Question E 290.34)
- ML19291A646 + (Forwards Rept on Analysis Methods for RCS Natural Circulation)
- ML20084E285 + (Forwards Rept on Analysis,Investigation & Current Status of Steam Generator Work Re 740219 Rept Concerning AO 50-244/74-02)
- DCL-86-027, Forwards Rept on Anchor Darling A/D 5500 Snubbers Installed on Piping Sys,Per 860109 Request Re Part 21 Reportability. Facility Operability Unaffected by Excessive Drag Characteristic Exhibited by Snubbers + (Forwards Rept on Anchor Darling A/D 5500 Snubbers Installed on Piping Sys,Per 860109 Request Re Part 21 Reportability. Facility Operability Unaffected by Excessive Drag Characteristic Exhibited by Snubbers)
- ML20129B423 + (Forwards Rept on App R Reanalysis to Assure Continued Compliance W/Clarifications/Interpretations of Document,Per 840504 Regional App R Workshop.Generic Ltrs 81-12,83-33 & Draft 85-01 Used as Guidance for App R Reanalysis Effort)
- ML19224B958 + (Forwards Rept on Applicant Request for Exemption to Allow Installation of Tendon Access Gallery Prior to Issuance of Cp.W/O Encl)
- ML20083L111 + (Forwards Rept on Archaeological Investigation of 220-60 & 220-61 Transmission Lines.W/O Encls.Related Correspondence)
- ML20214A298 + (Forwards Rept on Assessment & Collection of Annual Charges, Per Section 7601 of Consolidated Omnibus Budget Reconciliation Act of 1985)
- ML20214A292 + (Forwards Rept on Assessment & Collection of Annual Charges, Prepared Per Section 7601 of Consolidated Omnibus Budget Reconciliation Act of 1985.W/o Encl)
- ML20236Q056 + (Forwards Rept on Bounding Conditions for C-E Design Plants to Show Core Protection Based on Given Type of Reactor Coolant Pump Maint & Preliminary Dose Assessment Assumptions for Loss of Rhr,In Response to Generic Ltr 87-12)
- ML19242C730 + (Forwards Rept on Breakwater Damage)
- ML20027A622 + (Forwards Rept on Browns Ferry 3 Partial Failure to Scram on 800628. Executive Summary Encl)
- ML18025B029 + (Forwards Rept on Browns Ferry 3 Partial Failure to Scram Event on 800628)
- ET-NRC-92-3778, Forwards Rept on Buckling of Cylindrical Shells W/ Reinforced Circular Openings Under Axial Compression, in Ref to Westinghouse Response to NRC Request for Addl Info on AP600 + (Forwards Rept on Buckling of Cylindrical Shells W/ Reinforced Circular Openings Under Axial Compression, in Ref to Westinghouse Response to NRC Request for Addl Info on AP600)
- ML20080U143 + (Forwards Rept on Byron QC Inspector Reinspection Program)
- ML20209G464 + (Forwards Rept on CRGR Activities Since Creation in Oct 1981, Per 860620 Request.Functions & Scope of CRGR Remain Appropriate & Reflect Present Needs of Commission)
- ML20063L192 + (Forwards Rept on Cable Installation, in Response to Item 2 of IE Insp Repts 50-329/82-06 & 50-330/82-06 Per 820514 Meeting & 820528 Commitment.Cable Reel Numbers Corrected. Plant Is in Full Compliance)
- ML20062J235 + (Forwards Rept on Calculations Performed in Support of Review of Louisiana Enrichment Svcs Application.Rept Gives Brief Descriptions of Calculations Performed for Cases Specified Along W/Calculational Results)
- GO2-82-493, Forwards Rept on Capability of Southeast Anticline NRC Request at 820518-19 Meetings.Rept Should Close Out Open Item in Ser.W/O Encl + (Forwards Rept on Capability of Southeast Anticline NRC Request at 820518-19 Meetings.Rept Should Close Out Open Item in Ser.W/O Encl)
- ML20196K788 + (Forwards Rept on Certification of Financial Assurance for Decommissioning for Big Rock Plant,Per 10CFR50.75(f)(1).Copy of Trust Agreement Between Consumers Energy & State Bank & Trust Co,Included in Rept)
- ML20029A776 + (Forwards Rept on Changes to Operating Nuclear Plants Imposed by Commission or Staff for CY90.Rept Covers Changes to Sys, Components,Structures,Procedures,Organization & Design of Operating Plants)
- ML20063A041 + (Forwards Rept on Cleanup Following Introduction of 40 Gallons of Texaco Type 46 Hydraulic Fluid Into Spent Fuel Pool Due to Failure of Fuel Insp Stand Hydraulic Line)
- ML20127H603 + (Forwards Rept on Closure of Water Intake Valves at Minneapolis,St Paul as Result of Release of Water from Plant)
- ML20071P234 + (Forwards Rept on Confirmatory Geotechnical Investigations, Essential Svc Water Pipeline Corridor,Byron Station Units 1 & 2, Per NRC 820601 Request.Rept Reconfirms Previous Conclusion.Ser Outstanding Item 1 Closed.Addl Response Encl)
- ML20098H009 + (Forwards Rept on Confirmatory Lab Testing Program for Category 1 Backfill. All Licensing Commitments Met)
- ML19261A714 + (Forwards Rept on Consideration of Core Meltdown as a Design Basis Requirement & Alternate Courses of Action to Conclude Review of Floating Nuclear Power Plant (FNP) Application. Requests Comments by 750407)
- ML20136D642 + (Forwards Rept on Const Assessment Program,Per ALAB-143.Util Re Revised Fuel Load Dates Also Encl.W/O Const Assessment Program.Related Correspondence)
- ML19273B569 + (Forwards Rept on Const Settlement Monitoring Program for All Seismic Category I Structures to Be Conducted During Const Phase)
- ML19273B570 + (Forwards Rept on Const Settlement Monitoring Program for All Seismic Category I Structures to Be Conducted During Const Phase)
- RBG-26880, Forwards Rept on Containment Access Mgt & Containment Purge Activities During Cycle 1 Operation at Plant.Rept Satisfies SER Section 6.4.2.3 Re Containment Purge Data Collection + (Forwards Rept on Containment Access Mgt & Containment Purge Activities During Cycle 1 Operation at Plant.Rept Satisfies SER Section 6.4.2.3 Re Containment Purge Data Collection)
- AECM-87-0250, Forwards Rept on Containment Air Quality & Use of Containment Purge During Cycle 2 Operation,Per 870302 Commitment.Util Proposes That Per Cycle Monitoring Program Repts Be Discontinued Based on Data in Encl Rept.Fee Paid + (Forwards Rept on Containment Air Quality & Use of Containment Purge During Cycle 2 Operation,Per 870302 Commitment.Util Proposes That Per Cycle Monitoring Program Repts Be Discontinued Based on Data in Encl Rept.Fee Paid)
- ML19210B353 + (Forwards Rept on Containment Bldg Ring Girder Const & Repair Per 711103 Meeting W/Aec.Describes Unsatisfactory Conditions & Corrective Actions.Pouring of Replacement Concrete Not to Begin Before 711215.W/o Encl)
- ML19210B381 + (Forwards Rept on Containment Bldg Upper Vertical Tendon Displacement During Prestress.,Prepared Subsequent to 730829 Meeting W/Aec at TMI-1 Site.Concrete Under Bearing Plates Sound.No Intention to Remove Plates.W/O Encl)
- ML20154K330 + (Forwards Rept on Containment Safety at Vermont Yankee, Describing Current Status of All Containment Improvement/ Severe Accident Initiative Items for State of Vt.Util Will Await NRC Formal Guidance Prior to Settling Accident Issues)
- ML20085K952 + (Forwards Rept on Containment Structural Integrity Test for WPPSS Unit 1. Containment Responded Satisfactorily to Test Pressure Loads & Acceptance Criteria of ASME Iii,Div 2)
- ML19275B252 + (Forwards Rept on Containment Vessel Proposed for TMI-1 Per Nh Davison Review of Submitted PSARs & Amends 1 Through 4, Telcons W/D Croneburger of Gilbert Associates & Attendance at Portions of Applicant Presentation to AEC)