Text
Pon
~/
UNITED STATES 8
1 NUCLEAR REGULATORY COMMISSION 5
.8 WASHINGTON, D. C. 20555
%,,,,,+
SEP 8 1986 i
MEMORANDUM FOR:
Chairman Zech Comissioner Roberts Commissioner Asselstine Comissioner Bernthal Comissioner Carr FROM:
Victor Stello, Jr.
Executive Director for Operations I
SUBJECT:
RESPONSE TO COMSECY-86-5 A memorandum from the Secretary dated June 20, 1986, with the subject: Staff l
Requirements - COMSECY-86-5, " Charter, Committee to Review Generic Requirements (CRGR)," informed the EDO that the Commission approved a new version of the CRGR Charter. The EDO was requested to provide a report on CRGR activities and recommendations as to whether its functions and scope remain appropriate and continue to reflect the present needs of the Comission.
i Enclosed is a report on CRGR activities since its creation in October 1981.
Concerning CRGR's functions and secne, I strongly support the need for the CRGR i
and believe that its functions and scope remain appropriate and continue to reflect the present needs c/ the Comission. At this time, I recomend that no changes be made to CRGR's functions and scope as delineated in the CRGR Charter recently approved by the Comission.
Several Comissioners raised the question of whether or not CRGR activities (specifically briefings for CRGR concerning the status of work that is not before the CRGR for consideration as a generic requirement) are consistent with the CRGR Charter. Briefings for the CRGR are provided for in the CRGR Charter.
All previous versions of the CRGR Charter, and the current September 1986 version recently approved by the Comission, contain a provision (III.E) for early briefing of the CRGR by sponsoring offices before the staff has developed /
submitted proposals for CRGR consideration.
Briefings have been given to the CRGR for one or more the following reasons:
1.
The EDO or an Office Director has requested that the CRGR be briefed to obtain Comittee views concerning a matter.
2.
An Office Director sponsoring a series of proposed regulatory actions that are to be submitted for CRGR review at various times in the future, seeks to brief the CRGR to provide a big picture understanding of the proposed actions.
3.
An Office Director sponsoring a voluminous proposal, which calls for extensive regulatory action, seeks to brief the CRGR to facilitate under-standing prior to CRGR review of the proposal.
3609120481 860908 PDR REVGP NRQCRGR CORRESPONDENCE PDR
S' a
. 4.
An Office Director or Committee member seeks to inform the CRGR concerning the latest scientific and technical developments in a particular topic area.
5.
Committee members have asked for a CRGR briefing to surface a matter viewed as requiring CRGR attention.
Or iE;1ri' CiEnod D7 yicicE t411Q(
E Victor Stello, Jr.
Executive Director for Operations
Enclosure:
Summary of CRGR Activities cc:
SECY OGC Distribution:
VStello JHSniezek JRoe HRDenton JGDavis JMTaylor DFRoss ROGR Staff PDR EDO rf Central File b
bC :ROGR/S
- ROGR D
06m DQ Af
.fB.- :: 47/::- - ---------:------------:------------:-----------
NAME:W$c
- JZe
- J iiere t
- VS 'ello
- - - -- : - \\ - - - - - - - - - : - - -/ -. ------:------------:------------:------------:------------:-----------
DATE :9/4/86
- 9/4/E6
- 9/(/86
- 9/(/86 0FFICIAL RECORD COPY
StM4ARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Me2 ting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO 4
91 Review, Proposed Final Pending No CRGR recommendation necessary
//23/86 Revision of ECCS Rule at this time. Review of this Contained in Appendix K and item will centinue at a future 4
Section 50.46 of 10 CFR 50 meeting.
t J
-Sponsoring Office - RES
-Category 2 Item
-Issue # 141 92 Review, Proposed IE Complete CRGR recommended issuance of 7/11/86 Bulletin, Unreliable the Bulletin after modification Behavior of Static "0" to reflect CRGR concerns.
Ring Differential Pressure Switches
-Sponsoring Office - IE
-Category 1 Item
-Issue #140 Tha CRGR was notified on June 30, 1986, by IE, that IE Compliance Bulletin 86-01, Minimum Flow Logic Problems that Could Disable RHR Pumps was issued. This issuance was in accordance with Section III.C of the CRGR Charter, Revision 1.
l e
L
SUMMARY
OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO 90 Briefing, Proposed Generic Complete CRGR suggested that the staff 5/28/86 Letters 86-05 and 86-06 carefully review the language in Reactor Coolant Pump Trip Generic Letters 86-05 and 86-06 to BWR Piping, Draft NUREG-0313 assure that the staff intent for Revision 2 no new requirements was clearly conveyed.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #39 Review, Proposed Final Pending CRGR recommended that the RG Version of Regulatory Guide be modified to address the (OP-713-4) Criteria for a Committee's connents and re-Establishing a Tritium Bioassay submitted to CRGR for further Program review.
I
-Sponsoring Office - RES
-Category 2 Item
-Issue #139 Review, Final Version of Pending CRGR recommended that the rule Rev to Property Insurance be modified to reflect CRGR Rule recommendations and resubmitted for CRGR further review.
-Sponsoring Office - SP
-Category 2 Item t
-Issue #33 e
9
SUfMARY OF CRGR ACTIVITIES j
NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
}
89 Review, Staff Long-Range Complete CRGR recommended that the 4/16/86 Approach for Dealing with proposed package be modified Stress Corrosion Cracking in and reviewed by the CRGR BWR Piping, Draft NUREG-0313 Chairman prior to issuance i
i Revision 2 for comment.
i
-Sponsoring Office - NRR
_ Category 2 Item
-Issue #56 (40) 88 Briefing, Current Status of Complete No CRGR recommendation necessary.
i 4/10/86 Source Term Work
-Sponsoring Office - RES
-Category 2 Item l
-Issue #137 l
Briefing, Implementation Pending No CRGR recommendation necessary Plan for the Severe Accident at this time. CRGR review of l
Policy Statement and Reg.
this item should be scheduled for Use of New Source Term Info.
later this year.
-Sponsoring Office - NRR 1
i
_ Category 2 Item
-Issue #11 Review, Proposed Resolution Pending CRGR recommended that the staff of USI A-17, Systems Inter-revise the package to eliminate actions in Nuclear Power Plants ambiguities and focus on concerns that staff believes need additional work. CRGR should then rereview
-Sponsoring Office - NRR the revised package.
-Category 2 Item
-Issue #138
1 4
o SUMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date i
(Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO l
87 Review Final Rulemaking Complete CRGR recommended that the j
3/19/86 Package to Revise the proposal, as modified, be Regulations for Operator approved by the EDO.
Licensing, 10 CFR 55, l
Conforming Amendments and Three Associated RGs
-Sponsoring Office - NRR l
-Category 2 Item
-Issue #125 i
86 Review Final Rulemaking Pending No CRGR recosunendation at this 2/26/86 Package to Revise the time. This review was continued Regulations for Operator at Meeting No. 87 on March 19.
l Licensing, 10 CFR Part 55, Confonning Amendments and 4
Three Associated RGs t
-Sponsoring Office - NRR
-Category 2 Item
-Issue #125 85 Review, Proposed Broad Complete The CRGR recomunended that the i
2/5/86 Scope Rule to Modify General proposed broad-scope rule package Design Criterion 4 of 10 be sent forward for consideration j
CFR Part 50 by the Commission, subject to the j
modifications recommended by CRGR
-Sponsoring Office - RES
-Category 2 Item
-Issue #135 m.,
SUpmARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 i
I e
l Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
84 Briefing Impacts of Nuclear Complete No CRGR recommendations necessary.
1/22/86 Waste Disposal Legislation
-Sponsoring Office - NMSS
-Category 2 Item
-Issue #133 Review, Proposed IE Infor_
Complete CRGR reconsnended that IE revise mation Notice, NRC On-Scene the Information Notice consistent Response during an Emergency with the comments and concerns of the CRGR and coordinate there changes with the CRGR Chairman
-Sponsoring Office. IE prior to publication.
-Category 2 Item
-Issue #134 Review, Proposed Broad Pending No CRGR recommendations at this Scope Rule to Modify General time. Continuation of this Design Criterion 4 of 10 review is scheduled for CFR Part 50 February 5,1986.
-Sponsoring Office - RES
-Category 2 Item
-Issue #135 Review of Revision to None required CRGR Charter
-Sponsoring Office - DEDROGR
-Category 2 Item
-Issue #1 i
SUlttARY OF CRGR ACTIVITIES NOVEMBER 1981 ~HROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO I
83 Review, Proposed Rulemaking Complete CRGR reconmended that the pro-11/27/85 (10 CFR 30, 40 & 70) Emergency posed rule be approved for Preparedness for Fuel Cycle consideration by the Commission.
and Other Radioactive Material
)
Licenses 1
-Sponsoring Office - RES
-Category 2 Item
-Issue #130 Review, Proposed Rev. 3 to Complete CRGR recommended that the RG 1.63. Electric Penetration proposed RG be issued for Assemblies in Containment public comment after modifi-Structures for Nuclear Power cation to reflect comments by Plants CRGR.
i i
-Sponsoring Office - RES
-Category 2 Item
-Issue #131 l
Review, Proposed Closeout Complete CRGR recommended that the Actions for Resolving Generic staff move forward with i
Issue B-19, Thernal Hydraulic issuance of generic letters j
Stability for BWRs addressing the closeout of 1
B-19 and B-59.
_ Sponsoring Office - NRR I
-Category 2 Item
-Issue #132 j
i l
e O
mE
SUPMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 i
Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation i
Date)
Agenda Status to EDO I
82 Review, Proposed Final Complete CRGR recommended that the 10/23/85 Version of the Insider proposed final rule be Rules issued after modification
}
to reflect CRGR comments.
i
-Sponsoring Office - NMSS 1
_ Category 2 Item
-Issue #35 Review, Proposed IE Complete CRGR recommended issuance of Bulletin, Motor-Operated the proposed bulletin after Valve (MOV) Common Mode modifications are made to i
Failures During Plant reflect CRGR recommendations.
Transients Due to Improper These modifications should be Switch Settings coordinated with the ROGR staff prior to issuance of
_ Sponsoring Office - IE the bulletin.
i
-Category 2 Item
_ Issue.#129 Rhvew,Prbposed bbhpkeke CRGRrecombendedkhakkhe E
j Commission Paper on Commission Paper be approved Alternatives for Offsite subject to modifications.
i Emergency Medical Services These modifications should be coordinated with the ROGR staff.
-Sponsoring Office - IE
-Category 2 Item
_ Issue #124 l
t t
SlM1ARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO 81 Briefing, Existing and Complete CRGR offered comments concerning 9/25/85 Forthcoming Guidance decommissioning guidance and i
Associated with Decom-requested that all decommissioning missioning guidance be forwarded to the CRGR Chainnan to determine if CRGR
-Sponsoring Office - RES review is necessary.
i
-Category 2 Item
{
-Issue #126 Review, Proposed Rev. 2 Pending CRGR recmunended prompt issuance to Regulatory Guide 1.99, of the proposed Rev. 2 to RG 1.99 Radiation Damage to Reactor for public consent.
i Vessel Materials
-Sponsoring Office - RES i
-Category 2 Item
-Issue #121 Review, Proposed RG, " Guide Pending CRGR recommended issuance of the for Licensee Preparation and proposed RG 1.XXX for public NRC Staff Review of Plant.
comment after satisfactory Specific Analysis Required by resolution of CRGR concerns. The the Pressurized Thermal Shock "RGR Chairman asked that he be Rule,10 CFR 50.61 arovided with a copy of the revised RG before it is issued.
-Sponsoring Office - NRR
-Category 2 Item
_ Issue #127 i
SupMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 e
Meeting i'o.
Meeting Date 4
(Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
l 81 Review, Proposed IE Complete CRGR recomunended issuance of the l
(Continued)
Bulletin " Steam Binding of Bulletin after modification to j
Auxiliary Feedwater Pumps reflect CRGR comments and recom-mendations.
-Sponsoring Office - IE l
-Category 2 Item
-Issue #128 80 Briefing. Proposed Commission Pending No CRGR recomunendation necessary i
9/9/85 Paper Ccncerning Offsite at this time.,CRGR will review l
Medical Services this item at a future meeting.
-Sponsoring Office - IE
-Category 2 Item 1
-Issue #124 Review, Proposed Resolution Complete CRGR recommended approval after of USI A-43, " Containment modification to reflect specific j
Emergency Sump Performance CRGR concerns and reconenendations.
l l
-Sponsoring Office - NRR Also discussed at Mtg 26, 28 & 66 l
-Category 2 Item
)
-Issue #47 l
Briefing, Resolution of Public Pending No CRGR recommendation necessary i
Conenents on Proposed Final at this time. The CRGR will l
Rulemaking on 10 CFR 55, review this item at a future
" Operators' Licenses" and meeting.
]
Three Related RGs I
-Sponsoring Office - NRR Als discussed at Mtgs 86 8 87
-Category 2 Item
-Issue #125 i
4
SUMMARY
OF CRGR ACTIVITIES l
NOVEMBER 1981 THROUGH AUGUST 1966 1
i Meeting No, i
Meeting Date L
(f.nnouncement CRGR CRGR Recommendation Date)
Agenda Status to EDO 79 Review, Proposed Revision 2 Pending Additional work needed by both 7/24/85 of RG 1.99, " Radiation Damage RES and NRR to address new to Reactor Vessel" information. CRGR recommended to the EDO that this be given 1
j priority effort. Subsequent to
-Sponsoring Office - RES the meeting, RES requested that
-Category 2 Item this guide be dropped from
-Issue #121 further CRGR consideration pending coordinated review by NRR and RES.
Briefing, Request to DMB Complete CRGR strongly encourages staff
~
for Approval to Continue to to assure that only necessary Impose the Reporting & and reporting and recordkeeping Recordkeeping Requirements requirements are imposed by of 10 CFR 50 NRC.
.-Sponsoring Office - NRR
-Category 2 Item
-Item #122 Briefing, Pressure Isolation Complete CRGR suggested staff consider-Valve Test Requirements ation be given to the develop-ment of better focused PIV
_ Sponsoring Office - NRR guidance for the IST reviewers
-Category 2 Item and to assure plant-specific PIV-
-Item #123 requirements for operating reactors were carried out con-sistent with NRC backfit procedures (MC-0514).
i i
t I
i
SUMMARY
OF CRGR ACTIVITIES 1
s NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
l Meeting Date (Announcement CRGR CRGR Recommendation i
Date)
Agenda Status to EDO 79(Continued)
Review, Proposal for Complete CRGR recommended that this i
Improving Fire Protection issue be forwarded for con-sideration by the Commission j
-Sponsoring Office - NRR after resolution of the con-
-Category 2 Item cerns raised by the CRGR.
]
-Issue #117 78 Review, Proposed Requirements Pending CRGR recommended issuance subject 7/8/85 Resulting from Resolution to review by ELD.
of USI A-46, " Seismic Qualification of Equipment l
in Operating Plants" 2
l
-Sponsoring Office - NRR j
_ Category 2 Item j
-Issue #103 l
Briefing, Recommendations Pending Discussion at this briefing on Fire Protection Policy was inconclusive. CRGR and Program Actions will review this issue at j
Meeting #79 (7/24/85).
l
-Sponsoring Office - NRR i
-Category 2 Item i
-Issue #117 Briefing, Proposed New SRP Complete CRGR offered several recom-Sections to Address Expansion mendations relative to the SRP of Spent Fuel Storage section, but concluded that its issuance (for public comment),
as proposed by NRR, is appropriate.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #118
St# MARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 i
e Meeting No.
i Meeting Date i
(Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO l
I l
78 (Continued)
Briefing, NRC Activities Complete The CRGR noted that there in the Development of NDE appears to be an extensive Qualification and Performance menu of meaningful technical Demonstration Criteria development work ongoing.
l Resources should be combined i
and focused on one path for early and adequate improvement
-Sponsoring Office - RES in regulatory requirements.
-Category 2 Item
-Issue #120 Review, Proposed Revision Complete Subject to satisfactory staff to 10 CFR Part 50 of resolution of CRGR concerns, the I
Appendix J (Primary Reactor CRGR recommends that the EDO l
Containment 1.eakage Testing forward the proposed Appendix J l
for Water-Cooled Power rule and accompanying RG MS 021-5 j
Reactors) to the Commission for approval, f
-Sponsoring Office - RES l
-Category 2 Item
-Issue #111 l
l Review, Proposed Amandments Complete CRGR recommends that the proposed to 10 CFR 21, Reporting of amendments be issued for public Defects and Noncompliance and cousnent after modifications are 10 CFR 50.55(e), Reporting of made. These modifications should Defects in Design and be coordinated with the ROGR staff, Construction e
-Sponsoring Office - IE
-Category 2 Item
-Issue #119 i
I i
1 SIMtARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Age..da Status to EDO i
77 Review, Proposed Revision Pending No recommendation at this time.
4 6/3/85 to 10 CFR Part 50, of This issue will be continued 4
Appendix J (Primary Reactor at the next CRGR Meeting.
Containment Leakage Testing (No. 78, scheduled for i
for Water Cooled Power Reactors July 8, 1985) i and Related RG (Task No.
i MS 021-5) 1
-Sponsoring Office - RES
-Category 2 Item j
-Issue fill 76 Review, Proposed Regulatory Pending CRGR recomunended issuance of I
5/29/85 Guide (IC 609-5) " Criteria the RG after modification and for Power, Instrumentation, after the CRGR Chairman has and Control Portions of Safety reviewed the revised version Systems to determine if further CRGR review is needed.
j
-Sponsoring Office - RES
-Category 2 Item i
-Issue #116 I
Briefing, Proposed Revision Pending No CRGR recommendation necessary
{
to 10 CFR Part 50 ci-at this time. The CRGR will Appendix J (Primary Reactor review this item at CRGR Meeting I
Containment Leakage Testing No. 77.
for Water-Cooled Power l
Reactors) i
-Sponsoring Office - RES
-Category 2 Item
-Issue #111 i
SUPMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 l
Meeting No.
Meeting Date (Announcement CRGR CRGR Reconenendation Date)
Agenda Status to EDO l
75 Briefing, Proposed Revision Complete RES should send 1.NPR to CRGR i
5/14/85 to 10 CFR Part 60, Disposal of to detemine if it should j
(5/23/85)
High Level Radioactive Waste receive CRGR review. After i
in Geologic Repositories.
receiving the ANPR, the CRGR l
members were polled and they indicated that CRGR review is not necessary.
-Sponsoring Office - NMSS
-Category 2 Item
-Issue #114 Briefing, Proposed Revision Pending CRGR would like to have technical of Appendix K (ECCS Evaluation reporting findings prior to Models) of 10 CFR 50, Domestic reviewing the rule package. CRGR l
Licensing of Production and indicated that ELD should develop Utilization Facilities
. views about SECY 83-72 and legal advisability of differing remedies /
options that might be taken in this matter.
-Sponsoring Office - RES
-Category 2 Item
]
-Issue #115 i
74 Briefing, Proposed Revision Pending RES agreed to provide another CRGR 4/17/85 to 10 CFR Part 50, Appendix J, briefing in May.
1 (5/16/85)
Primary Reactor Containment Leakage Testing for Water-Cooled Power Plants
-Sponsoring Office - RES l
-Category 2 Item
-Issue #111
SUMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 i
Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO 74 (Continued)
Review, Proposed Amendments Pending CRGR reconnended that proposal i
to 10 CFR Part 70, Domestic be modified to incorporate Licensing of Special Nuclear clarifications suggested by the Material; Part 73, Physical CRGR, and reviewed by staff to i
Protection of Plants and assure that reporting of safe-l Materials; Part 74 Material guards events is necessary and i
Control and Accounting of timely. CRGR will then decide i
Special Nuclear Material and if further review is necessary.
Rev. I to RG 5.62. Reporting of l
Physical Security Events.
\\
l
-Sponsoring Office - NMSS l
-Category 2 Item
-Issue #112 1
Review, Proposed Rulemaking Pending CRGR recommended that the to Establish Retention Periods prcposed revisions be modified, i
for Recordkeeping Requirements reviewed by program staff of I
of 10 CFR cognizant offices, and re-l submitted to CRGR for review.
j
-Sponsoring Office - ADM j
-Category 2 Item i
-Issue #113 73 Proposed Regulatory Guide Complete CRGR recommended that the Reg.
3/12/85 IC 127-5 Criteria for Program-Guide be issued after modifi-l (3/26/85) mable Digital Computer Systems cation to reflect CRGR comments in Safety Related Systems of and recommendations. RES should Nuclear Power Plants coordinate with ROGR staff I
in completing these modifications.
l
-Sponsoring Office - RES j
-Category 2 Item
-Issue #107 j
I l
i
I
SUMMARY
OF CRGR ACTIVITIES J
NOVEMBER 1981 THROUGH AUGUST 1986 i
l I
Meeting No.
J Meeting Date l
(Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO 73 (Continued)
Proposed Amendment to Complete CRGR recommended that the rule 10 CFR 50, Appendix E, be issued after (1) modification
" Unusual Event" to reflect CRGR recommendations and (2) formal concurrence by FEMA.
]
'l
-Sponsoring Office - RES
-Category 2 Item
-Issue #108 Views and Recommendations Complete CRGR reaffirmed its recom-i l
on RG 1.105, Instrument mendations.from Meetings 48 Setpoints for Safety-Related and 53.
Systems
-Sponsoring Office - RES I
-Category 2 Item j
-Issue #82 l
Generic Resolution of Complete No recommendation necessary.
NUREG_0803 Generic Safety As provided by the CRGR Charter Evaluation Report Regarding and approved by the CRGR i
Integrity of BWR SCRAM members, the CRGR Chairman l
System Piping exempted this item from review.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #109 Standard Review Plan Section Complete No recommendation necessary.
13.5.2 Operating and As provided by the CRGR Charter l
Maintenance Procedures and approved by the CRGR Revision members, the CRGR Chairman exempted this item from review.
-Sponsoring Offige - NRR
-Category 2 Item
-Issue #110
1
SUMMARY
OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 e
l Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
i 72 Jan. 9, 1985 Review of NRR Proposed Complete No recommendation necessary.
(Dec. 26, 1984)
Resolution of Generic Issue As provided by the CRGR Charter III.D.2.3, Liquid Pathway and approved by the CRGR 1
Radiological Control members, the CRGR Chairman l
exempted this item from J
review.
\\
I
-Sponsoring Office - NRR
-Category 2 Item
-Issue #104 Review of NRR Proposed Complete No recommendation necessary.
Draft Regulatory Guide 1.114 As provided by the CRGR Charter i
Rev. 2 Guidance to Operators and approved by the CRGR at the Controls and to Senior members, the CRGR Chairman Operators in the Control Room exempted this item from review.
of a Nuclear Power Unit l
-Sponsoring Office - NRR
-Category 2 Item
-Issue #105 l
Discussion of December 20, Complete CRGR recommended that the EDO 1984 Memorandum from Comm.
reemphasize to staff that they 4
Asselstine to Comm. Roberts should freely discuss any j
Concerning the Efficacy of the safety concerns with CRGR Process.
management.
-Issue #106 l
1 l'
l
t 1
SUMARY 0F CRGR ACTIVITIES j
NOVEMBER 1981 THROUGH AUGUST 1986 i
Meeting No.
Meeting Date j
(Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
i l
71 i
Dec. 3, 1984 Review of Proposed Pending CRGR recomunended that the package j
(Nov. 16, 1984)
Requirements Resulting be revised to reflect / address fro:n Resolution of CRGR comments and resubmitted USI A-46, Seismic Qual-for review.
ification of Equipment j
in Operating Plants 1
2
-Sponsoring Office - NRR
-Category 2 Item
-Issue #103 i
70 Oct. 17, 1984 Briefing on Proposed NRC Complete CRGR suggested that the staff (Sept. 26, 1984) Policy Regarding Minimum resolve CRGR concerns, modify Dosimetry for Offsite the proposal as appropriate and Emergency Workers forward modified proposal to the CRGR Chairman for review and i
disposition.
)
-Sponsoring Office - IE
-Category 2 Item j
-Issue #102 Review of Proposed Final Complete CRGR recommended that the proposed Version of Generic Letter letter be issued for public Concerning Quality Assurance comunent after certain actions Related to the ATWS Rule are taken, j
(Also discussed at Mtg. No. 67)
-Sponsoring Office - IE l
_ Category 2 Item
{
-Issue #99 i
1
t SUMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 I
Meeting No.
Meeting Date l
(Announcement CRGR CRGR Recomunendation j
Date)
Agenda Status to EDO L
70(Continued)
Review of Proposed Final Complete CRGR recomunended that the EDO
]
Rule Concerning Pressurized forward the proposed rule to Thermal Shock (PTS) the Comunission for their approval.
(Also discussed at Meeting Nos. 21, 23 and 38
-Sponsoring Office - NRR 4
j
-Category 2 Item j
-Issue #41 l
69 i
Sept. 5, 1984 Proposed Final Rule Complete No recomunendation necessary.
1 (Aug.24,1984) 10 CFR Part 53, Criteria and As provided by the CRGR Charter Procedures for Determining and approved by the CRGR j
the Adequacy of Spent Nuclear members, the CRGR Chairman l
Fuel Storage Capacity. (Also exempted this item from Discussed at Mtg. No. 33)
- review, i
i
-Sponsoring Office - RES 1
-Category 2 Item
_ Issue #59 Review of Proposed IE Bulletin Complete CRGR recomunended that NRR contact 84- " Cracking in Boiling the utilities to determine the j
Water Reactor Mark I and Mark II necessity of issuing the bulletin Containments Caused by Inerting and if bulletin is required, 1
System Failure certain modification should be made before it is issued.
_ Sponsoring Office - IE j
_ Category 2 Item 2
-Issue #100 1
1 St#9tARY OF CRGR ACTIVITIES NOVEMER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date 1
(Announcement CRGR CRGR Recommendation i
Date)
Agenda Status to EDO i
l j
69 (Continued)
Briefing on Staff Rulemaking Pending CRGR reconuendation was not Activities Regarding Emergency required.
q Response for Earthquakes 2
-Sponsoring Office - IE
-Category 2 Item
-Issue #101 l
i i
a j
August 8, 1984 Review of revised version of Complete Recommended issuance for public i
(July 26, 1984)
RES Proposed Amendments to consent after modification to 10 CFR Parts 30, 40, 50, 51, incorporate the one remaining l
70 and 72 to incorporate CRGR recommendation.
Decommissioning Criteria for Nuclear Facilities. (Also Discussed at Mtg. No. 62)
)
i
-Sponsoring Office - RES 1
-Category 2 Item l
-Issue #95 67 l
July 25, 1984 Review of Proposed IE Bulletin Complete CRGR recomunended proposed (July 10, 1984)
"Undervoltage Trip Attachments bulletin not be issued.
of Reactor Trip Breakers" l
(Also Discussed at Mtg. Nos.
l 25,61) i l
-Sponsoring Office - IE I
-Category 2 Item l
-Issue #94 I
i l
I
SUMMARY
OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
\\
67 Briefing on Staff Plans to Complete CRGR suggested that the QA (Continued)
Develop & Issue Generic Ltr.
program be structured consistent to Include Quality Assurance with industry practices for i
Requirements for Important-similar nonsafety-related equip.
to-Safety ATWS Equipment ment.
-Sponsoring Office - IE
-Category 2 Item
-Issue #99 66 j
July 11, 1984 Briefing on Staff's Long Complete Recommendation was not required.
l (June 27, 1984)
Range Plans to Address Pipe Cracking (Also Discussed at Mtg.
Nos. 20, 22, 31, 45, 49)
-Sponsoring Office - NRR
_ Category 2 Item
-Issue #56 (40)
Review of Proposed Resolution Pending CRGR recommended that this pro-of USI A-43, " Containment posal not be accepted at this time.
Emergency Sump Performance CRGR agreed to reconsider this (Also Discussed at Mtg. Nos.
proposal or a modified version 4
26,28) after receipt of responses to t
issues raised at this meeting.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #47 I
i
4 SLMtARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
4 Meeting Date (Announcement CRGR CRGR Recommendation Date)
Agenda Status to EDO i
t 1
i i
65 June 27, 1984 Review of Proposed Revision Complete Recomunended issuance of the j
(June 18, 1984) 3 to Reg. Guide 1.28, Quality Reg. Guide after modification Assurance Program Requirements to reflect CRGR comments and (Design & Construction) (Also recommendations.
discussed at Mtg. #51)
-Sponsoring Office - IE
-Category 2 Item l
-Issue #97 Proposed Amendments to Complete No recomunendation necessary.
10 CFR 50, Domestic As provided by the CRGR Charter Licensing of Production and approved by the CRGR i
and Utilization Facilities members, the CRGR Chairman exempted this item from i
review.
-Sponsoring Office. ADM j
-Category 2 Ites l
-Issue #98 a
64 May 30, 1984 Review of Proposed Major Complete Recomunended publication for (May 2, 1984)
Revision of 10 CFR Part 20, public comments after modifi.
i Standards for Protection cations are made to reflect
)
Against Radiation (Also CRGR comments and recom-discussed at Mtg. #25, #62, mendations.
i and #63).
I i
-Sponsoring Office - RES l
-Category 2 Item l
-Issue #45 l
4
4 SLBMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
Meeting Dete
- l' (Announcement CRGR CRGR Reconuendation Date)
Agenda Status to EDO 63 May 9, 1984 Briefing concerning the Complete CRGR recomunendation was not re-(April 16, 1984) Status of Proposed Major quired.
Revision of 10 CFR Part 20, Standards for Protection Against Radiation (Also discussed at Mtg. #25 & #62)
-Sponsoring Office - RES 4
-Category 2 Item
{
-Issue #45 i
i Review of Proposed Pending CRGR review not completed pending l
Resolution of Generic Issue additional staff work. This l
A-30, " Adequacy of Safety issue will be rescheduled when i
Related DC Power Supply staff work is complete.
i l
-Sponsoring Office - NRR j
-Category 2 Item J
-Issues #96 i
62 l
April 25, 1984 Briefing concerning the Complete CRGR recommendation was not re-l (April 16, 1984) Status of Proposed Major quired. Another briefing is i
Revision of 10 CFR Part 20, scheduled for CRGR Meeting #63 i
Standards for Protection (5/9/84).
Against Radiation (Also discussed at Mtg. #25).
-Sponsoring Office - RES j
-Category 2 Item
-Issue #45
SUMARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 9
Meeting No.
Meeting Date (Announcement CRGR CRGR Recomunendation Date)
Agenda Status to EDO 62 (Continued)
Review of proposed Amend-Complete The amendments should not ments to 10 CFR Parts 30, 40, be approved until additional 50, 51 70 and 72, to incorpor-staff work is completed ate Deconur.issioning Criteria and the issue is again for Nuclear Facilities, considered by CRGR.
-Sponsoring Office - RES
-Category 2 Item
-Issue #95 61 April 4, 1984 Review of proposed IE Complete The bulletin should be issued (March 21, 1984) Bulletin, "Undervoltage after modification. Subsequent Trip Attachments of Reactor to this meeting, the CRGR Trip Breakers." (Also recomunended to the EDO that l
discussed at Mtg. #25) the bulletin not be issued.
l (Refer to Meeting No. 60) j
-Sponsoring Office - IE
-Category 2 Item
-Issue #94 Continued review of the Complete No recomunendation - Issue continued proposed resolution of USI at Mtg. No. 60 A_44 Station Blackout (Also discussed at Mtg. Nos. 59, 60).
-Sponsoring Office - NRR
-Category 2 Item
-Issue #75 i
l 0
St# MARY OF CRGR ACTIVITIES 1
NOVEMBER 1981 THROUGH AUGUST 1986 9
Meeting No.
l Meeting Date (Announcement CRGR CRGR Reconnendation Date)
Agenda Status to EDO i
I 60 April 11, 1984 Continued review of the Complete Recomunended issuance for public (March 14, 1984) proposed resolution of USI comunent after taking into account A-44 Station Blackout (Also CRGR concerns.
i I
discussed at Mtg. Nos.59, 61)
-Sponsoring Office - NRR 1
-Category 2 Item
-Issue #75 Review of the proposed Complete The CRGR recomunended addition-resolution of Generic Issue al work and issuance of a B-56, Diesel Generator 50.54(f) letter.
Reliability.
(Also discussed l
at Mtg. No. 43) i
-Sponsoring Office - NRR
{
-Category 2 Item j
-Issue #75 Reconsideration of proposed Complete At Meeting #61, the CRGR recom-IE Bulletin, "Undervoltage mended that the bulletin be issued Trip Attachments of Reactor after modification. CRGR recon-Trip Breakers." (Also sidered the bulletin and recom-i discussed Mtg. Nos. 25, 61) mended that it not be issued until l
additional work is done and it is
]
-Sponsoring Office - IE 1
_ Category 2 Item j
-Issue #94 4
I I
e
Ei St# MARY OF CRGR ACTIVITIES NOVEMBER 1981 THP00GH AUGUST 1986 I
Meeting No.
Meeting Date (Announcement CRGR CRGR Recommendation Cata)
Agenda Status to EDO 59 March 28, 1984 keview of the proposed Complete The CRGR has not completed its (March 14, 1984) resolut. ion of USI A-44 review of tl:e proposal and
";tatinn Blackord and therefore has not yet made Generic Is;ue B-56, Diesel recommendations.
Generator b liability (Also disciassed at Mtg. No. 43)
-Sponsoring Office - NRR i
-Category 2 Item i
-Issue #75 l
58 March 13, 1984 Briefing concerning a Complete Assuming ELD concurrence with (March 2, 1984)
Proposal for an Integrated the proposal, it was acceptable Safety Assessent Program to the CRGR. The CRGR suggested (ISAP) (Also niscussed that the proposal be forwarded at Mtg. No. 44}
to the Commission.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #77 Review of Propised Complete The CRGR recommended approval i
NUREG-0801, Evaluation after modification.
Criteria for Deteiled Control Room Desin t
-Sponsoring Of fice - NRR
-Category 2 Item
-Issue 893
O SU MARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.
l Meeting Date CRGR CRGR Recommendation 1
(Announcement Date)
Agenda Status to EDO 57 Review, Proposed NUREG-0801, Complete CRGR recomunended that NUREG-0835 2/15/84 Evaluation Criteria for not be published. CRGR, with NRR Detailed Control Room agreement, decided to postpone Design Review, and MUREG-review of NUREG-0801 0835. Human Factors Review Guidlines for the Safety Parameter Display System
-Sponsoring Office - NRR
-Category 2 Item
-Issue #92 i
I a
I e
Summary of CRGR Activities Date 08-20-34 8
Page 44 et 45--
INovember 1981 through February 1984) l I
SPONSORING CRGR CRGR ALSO CRGR CRGR RECO M NDATIOlt i
MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO 1
NUMBER NUMBER AT CRGR I
I MEETING is 1 DATE AGENDA NUpWER l
1 l__I_1NOTICEI I
I i
1551 02/06/84 l Review of the IE 2
90 Completed Proposed bulletin should l
l(01/D9/84)lproposed 'E be issued after I i IBulletin -ititled modifications.
I I
l Failures s' l
l l General Electr.':
l l
IType HFA Relay in l
l lUse in Class 17 l
1 ISafety Systems."
i I
i I
I i
1561 02/C3/84 l Review of the NRR 2
91 Completed CRGR agreed with the l
Il01/23/84)lstatus of the l
NRR proposal.
I istaff's evaluation l
land conclusions I
tregarding the need i
Ifor power operated I
I trelief valves I
i l l PORVI f o r powe r I
i Iplants designed by i
I Combustion i
I i
Engineering. Inc.
j l
ICL).
l I
4 i
i l
i 1
1i Ii i
i i
i l
e
8 Sussnary of CRGR Activities Date 08-20-84 Page 43 of 45-(November 1981 through February 1984) l l
SPONSORING CRGR CRGR ALSO CRG4 CRGR REC 000EISATION I
MEETING OFFICE CATEGORY ISSUE I TOPIC STATUS TO EDO NUMBER NUDGER 1AT CRGR I
INEETING I
I NUMBER is i DATE ACENDA I
l 1
I I iMOTICEI i
1 I
I Completed Proposed revision (2)
-l 1541 01/19/84 Proposed revision RES 2
SS should be issued after I
l(12/27/83)
(1) to Reg. Guide modification.
I i
11.89. Envaronmental I I Qualification of i
I i
Electric Equipment l'
I I
Important to safety l
Ifor Nuclear Power i
l i
IPlants.
I t
I I
I I
1 I
I I
I 1
1 1
I l
1 I
I I I I
I I
1 I
l i
I l
t I
I I
6 1 1
I 1
I I
I i
1 I l 1
1.
I I
i i.
1 I
e
e
-~
Summary of CRGR Activities Date 08-20-84 8
Page 42 of 45--
(November 1981 through February 1984) i I
SPONSORING l CRGR CRGR ALSO CRGR CRGR RECOD00EIR)ATION MEETING OFF.CE (CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUMBER AT CRGR 1
l l
MEETING l # I DATE l
AGENDA NUMBER I
i l__l (NOTICEI l
531 01/11/34 a) Proposed final NMSS 2
87 Completed Staff proposal should be l(12/19/83) version of a app roved however t he i
revision to 10 paper should be modified I
l CFR Part 51, to highlight certain e
i Licensing and issues. Thereafter, ELD l
Regulatory should review the paper.
I Policy and l
l l
Procedures for l
l Environmental l
l Protection (Adds l
narrative i
explanation for i
Table S-3, l
Uranium Fuel i
L Cycle Environ-l l
l mental Data)
I I
...___.l.......
l b) Proposed NMSS 2
38 Completed Agreed with the staff revision to the proposal, however existing rule on certain policy-related protection of considerations where Spent Fuel e
raised for EDO/
shapments Commission consideration (1DCFR Part 73).
c) Proposed RES 2
82 48 Completed Staff proposal should l
l revision (2) to not be approved as I
Regulatory Guide submi,tted 1.105, Instrument Setpoints for i
Safety Related l
Systems.
I l
l i
i 4
I
_e_
_L._
Summary of Cd3R Activities Date 08-20-84 Page 41 of 45--
(November 1981 through February 1984) l l
SPONSORING CRGR CRGR ALSO CRGR CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER INUMBER AT CRGR l
l MEETING 8 i DATF l
AGENDA NUMBER l
l l__l l NOTICE) 152l12/08/83 al Review of a IE 2
85 Completed The Bulletin should L:
reposed IE issued after l
l(11/18/83) l l
- hulletin, l
modification.
I I
" Electrical l
l Circuit Breakers l l
with an Under-l l
voltage Trip l
l l
Feature in Use l l
l in Safety-1 I
Related l
l Applications r
l l
Other Than the l
l Reactor Trip l
l System."
I 1
g l
l b) Review of a NRR 2
86 Completed The proposed rulemaking proposed should be approved after rulemaking for modification.
i i
" Training and l
l Qualifications I
of Personnel i
I Performing I
l Functions 1
Important to l
Safety."
lSection 306 of l NWP Act of 1982)
I l
l l
l l
I l
l I
i i
I I
i l
l l
l
Page 40 of 45 Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l I
l SPONSORING CRGR CRGR ALSO CRGR CRGR RECOMMENDATION I
I MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO I
I NUMBER NUMBER AT CRGR u
I l
MEETING
, 8 1 DATE I
AGENDA NUMBER I
__l INOTICEI 150 10/26/83 Review of a policy NRR 2
34 Completed The staff position I
(10/21/831 issue - proposed should not be approved I
staff position on as proposed I
the definition of I
i
- "important to safety" and i
" safety-related".
51 11/23/83 l Review of a major NRR 2
60 33 Completed The proposal should be (11/10/83)lpolicy issue - the approved pending i
Iproposed resolution resolution of CRGR i
i i
of USI A-1 Water comments.
I Hammer.
I I
I I
I I
i 1
1 I
I II I I
I I
I I
l i
l
Page 39 of 45--
(November 1981 through February 1984)
-~
Summary of CRGR Activities Date 08-20-34 l
I SPONSORING CRGR CRGR ALSO CRGR CRGR REC 0K42NDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO l
NUMBER NUMBER AT CRGR l
l l
MEETING 15 l DATE l
AGENDA NUMBER l
l l__l
[ NOTICE) l 149 10/24/83 a) Review of a NRR 1
56 (20 22, Completed The proposed require-l l10/19/83) major policy l (40) 31d45) ments should be I
issue -
approved, however the l
requirements for Commissi.n paper should l
l reinspection of be modified l
l BWR piping and I
I repair of l
l l
l cracked piping.
l l
I I
l l
b) Continuation of NRR 2
80 46&47 Completed The proposal should be l
l the review of a approved after I
l l
major policy modification.
l l
issue - proposed l
l resolution of l
USIs A-3. A-4 l
and A-5 I
regarding steam I
generator tube antegrity.
l l
l 1
I I
l l
l l
l i
l l
l i
l l
l l
Page 38 of 45--
(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 l
I SPONSORING CRGR CRGR ALSO CRGR CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUMBER AT CRGR l
l MEETING 8 1 DATE I
AGENDA NUM8ER I
l I
l__l lMOTICEI I i
l I
l l
1481 10/20/83 la) Review of a RES 2
82 Completed As proposed, the guide I
ll10/14/83) proposed revision should not be
{
l l
Revision (2) to approved. The staff t
i Regulatory Guide should reconsider and I
i 1.105. Instro-coordinate with other l
.I I
ment Setpoints offices, the proposed I
I for Safety revision. Thereafter.
l l
Related Systems.
the revision should be l
l submitted for CRGR l
1 l
review.
1 I
l l
l l
b) Review of a NRR 2
83 Pending As proposed, the rule i
I proposed rule should not be approved l
concerning a until additional staff I
l degree work is completed and l
l requirement for the issue is again l
l 1
operating staff considered by CRGR.
I l
st nuclear i
i i
power plants.
l l
l l
l l
l 1
l 1
I l
l 1
l l
1 1
I I
i 1
e
i 1
Summary of CRGR Activities Date 08-20-84 Page 37 of 45-~
INovember 1981 through February 1984) i l
SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION 1
1 l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I
MEETING I
l NUMBER 18 I DATE AGENDA l
i I-INOTICE) 146l 9/14/83 Review of proposed NRR 2
80 49 Cogle t ed Reevested additional lMTG 849) information from staff.
l l l18/25/83) generic require-I I
ments relating to i I Steam Generator l
ITube Degradation I
land Rupture Events I
land concerning l
Iresolution of USIs i IA-3 A-4 and A-5.
I i
Completed Recommended approval.
1471 9/28/83 IReview of proposed NRR 2
31 l19/15/83) exemptions to the l
regulations in the I
implementation of I i multiplant action l l lD-10 (USI A-21 for I i IPWRs evaluated by i l l Westinghouse l
l l Topical Reports i
i IWCAP-9558 (Rev. 2)
I l land WCAP 9787.
1 I
i 1
l t
l.
e l
1 i
i I
l l
l i
i I
Page 36 of 45--
(November 1981 through February 1984) j Summary of CRGR Activities Date 08 20-84 l
l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR l
l l
MEETING l
18 l DATE AGENDA NUMBER.
t I l l__l_[NOTICEI l
l 1
l 1451 3/17/83 a) Briefing NRR 2
78 Pending Recommended additional l
l (3/4/83) concerntng the staff work and then j~
l l
human factors l
CRGR review.
l l
review of remote l
l shutdown l
l l
capability in l
I l
the detailed I
l control room l
l design reviews l
l for operating l
l l
reactors.
l l
l..
l l
1 l
l lb) Briefing NRR 2
79 Completed Recommended approval l
l l
concernang the of the NRR l l l
results of the recommendation.
I l
l Study of I
l l
Electromagnetic l
l l
Pulse (EMPl l
l l
Effects and NRR l
l l
recommendations l
l l regarding EMP.
l l
l l
l l_.__....____...
I I
I I
c) Review of the NRR 1
40 20,22 Completed Recommended approval l
l l
proposed orders (56) 449 of the orders after I
i for operating (31) modifications.
{
l l
l BWR Plants (5) l l
that have not i
I l been inspected l
l for inter-I gramular stress l
l corrosion l
l cracking of l
1 plant paping.
I I
i 4
l i,
T
I 1
-~
Summary of CRGR Activities Date 08-20-84 Page 35 of 45~~
(November 1981 through February 1984)
J l
I CRGR CRGR ALSO STATUS CRGR REC 000EWATION l
l SPONSORING l CATEGORYISSUE TOPIC TO EDO l
MEETING OFFICE l
NUPSER NUMER AT CRGR I
I MEETING 18 DATE I
AGENDA NUMBER l
l l--.
IMOTICE) l g
g 1441 3/10/83 a) Review of a NRR 2
76 Completed Returned to NRR for i
17/22/83) major policy additional work and I
issue - the then CRGR review.
I proposed l
l resolution of l
l l
l Generic Issue i
l l
l B-10 Behavior a
l l
l of BWR Mark III 1
l l
Containment.
l l
g g
1 I
b) Review of a NRR 2
77 58 Completed Returned to NRR for l
l major policy IMTG 858) additional work and 1
issue - a then CRGR review.
]
proposal for an J
Integrated i
Safety t
1 l
Asses sment
)
l l
Program IISAP).
l l
i i
I l
i 1
e I
I i
I i
I I
l l
i I
i i
Page 34 of 45 Summary of CRGR Activities Date 08-20-s4 j
(November 1981 through February 1984) t I
i l
SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I
I I
MEETING 18 l DATE I
AGEWA l
1 NUPRIER l__ll_(NOTICE 1 l1431 7/27/83 la) Review of a NRR 2
74 l
l 17/18/83) maior policy Completed Recommended that the I
l 1ssue - the proposed resolution of 3
l l
proposed USI A-12 be approved l
I resolution of after modifications.
l I
USI A-12 l
l l
Potential for i
i I
Low Fracture l
l l
Toughness and l
l l
Lamellar Tearing I
l l
an PWR Steam l
l l
Generator and l
l l
l l
Pump Supports.
l l 1
g ;
g.___.__..... ___.__g__....__...___.
I I
I 4
l l
lb) Review of a NRR 2
75 59 80 Completed Returned to NRR for Il l
major policy d61 additional work and l
l 1ssue - the 1 I proposed interin then CRGR review.
4 j
l l
requirements for l l enhancing the 3
j i
l reliabitaty of I l diesel I
i generators at 1
l l
operating I
l reactors i
i l IGeneric Issue l
l 8-56).
i l
i I
l 2
i i
l i
Page 33 of 45-(November 1981 through February 1984)
Susumary of CRGR Activities Date 08-20-84 1
I SPONSORING CRGR CRGR ALSO STATUS CRGR RECopeEISATION I
DEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUpWER AT CRGR I
I MEETING 18 i DATE AGEISA NUMBER I
l l
l_t IMOTICEI I I 142l 7/12/83 al Review of IE IE 1
73 30 Completed Recomunended t hat t he I i 17/4/83)
Bulletin Bulletin be issued i I concerning after modifications.
l l
fraudulent l
l products sold I
i l l
by Ray Miller l
l Inc.
I I I I 1
I I
l b) Review of the RES 2
44 24 30 Completed Recomunended t hat the l
l final rule, 10 3d39 rule be approved after l l CFR 50.60, modifications.
l l
Reduction of l
l l
Risk from I I l
Anticipated i I I
I without Scram l
l lATWSI Events i
i i
for Light Water l
l Cooled Nuclear I
I l
Power Plants.
I I l
4 l
I i
1 I
1 1
1 I
I i
1 l
\\
l 8
l l
l 1
I i
l 4
I i
l e
i e
Page 32 of 45--
Summary of CRGR Activities Date 08-20-84 IMovember 1981 through February 1984)
I I
l SPONSORING CRGR CRGR ALSO 1 STATUS CRGR RECOMMENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC l TO EDO I
NUMBER NUMBER AT CRGRI l-T I
IMEETINGl l3 l DATE l
AGEICA 1
l NUMBER l l
I i
l I
l__
(NOTICE) '
l_
1411 7/6/83
.al aeview of the l
EES I
2 70 I
aleted Recommend; that the i I 16/24/83ll fanal rulemakingt 1
i rulemaking Je approved i
I I
to amend 10 CFR I l
after modifications.
1 I
I Part 50.54 l
I i
i concerning i
i I
I fatness for i
I l
l duty.
l l
l l
l g
l g...................l...............
1 I
I l
1 i lb) Review of 12 2
71 Completed Recommended t hat the I l l
NUREG-0549 NUREG be issued after l l Standard Review I
I I Plan for the modifications.
l i I Review and I
l Evaluation of I l Emergency Plans l
l for Research and i I Test Reactors.
I I I
(
l 1
1 I
i I
l c) Review of IE IE 2
72 Completed Recommended that the 1
l Belletin Bulletin be issued after I
I concerning modifications.
l l Nonconforming i 1 Materials i I l
Supplied by l
l Tube-Line l
l I Corporation.
1 i i I
1 1
~
page 31 of 45~~
Summary of CRGR Activilles Date 08-20-84 (November 1981 through February 1984) l I
I I SPONSORING CRGR CRGR ALSO STATUS CRGR RECODGENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I I I
MEETING Is l DATE I
AGENDA NUMBER I I i
I_ I IMOTICE) l I _I i
1408 6/1/83 la) Review of RES 2
88 Completed Recomm.aded approval l
l (5/13/831 prsposed with modifications.
l I
amendment to l
l 10CFR50 t
l concerning i
I hydrogen control l
l l
requirements.
I I l
g g g.........__..____._
I I I
I I
l l
l lbt Review of the NMSS 2
l 35 18 Completed Recommended that the i I l
proposed i I l
Instder Rule-package be approved i
after CRGR comments are l
I I
making package addressed. Also l
l l
concerning recommended that the l
l l
I l nuclear power package be accompanied reactors.
I i
l i
by a recommendation that the Commissier l
l i I I
reconsider a Government l
l l
clearance program to address the " Insider 1
I I I
I I I
Threat" and reduce plant i
l i
protection burden.
g i i
I I l l lc) Briefing NRR 2
89 Completed Recommendation was not i
I I
concerning the l required. CRGR I
l l
Operator i
l l I
Requalification I concluded that program is appropriate and i I l
program.
of f e red c omment s.
I l
l 1
I I
I l
1 1
1 I
i 1
m a
Page 30 of 45--
Summar ef CRGR Activilles Date 08-20-84 (November {981throughFebruary1984) 1 I
I SPONSORING CRGR CRGR ALSO STATUS CRGR REC 000ENDATION
-l i
IEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I I l
l MEETING 15 1 DATE I
AGENDA l
NUMBER l
1 I
I l__l IMOTICE) l l
l l
8 8
1398 5/25/33 lal Review of I
NRR 2
87 Completed Recommended approval l
l (5/10/83)l overall revisioni with econfications.
I I l
of 10 CFR 71, 1
I l l
Packagang of l
l I I l
Radioactave l
l l l l
Material for l
l l
l Transport and I
i I I I
Transportation l l
4 l
l of Radioactswe l I
I I Material Under i
l l
Certain l
l Conditions.
1 l
l l
IU.S./IAEA l
i I
l l
Compatah111ty)
I I I
J l I I
I I I
i l
l lh] Review of the RES 2
44 24 30 Completed Recommended role l
l 1
fanal rule
$4 IMtg 8421 modifications and 1
i I i
10CFR50.50 d42 resebsittal for further 1 I titled CRGR constderation after i
l i
Reduction of staff work is completed.
1 l
l Risk From i
l l
Anticipated l
l l
Transients i I I
Without Scram l l l
IATWSI Events l
I I
for Light-Water I
I I
l Cooled Nuclear l
l Power Plants.
I I I
I I
I i
I i I
l 1 1
I I
I i
1 1
I I
I I
I i
1 1
1 I i 1
1 I
I l
1
e Summary of C#GR Activities Date 08 20-84 Page 2g of 45-INovember Ig81 threegh February 1g84)
I I
I l
l SPONSORING l CRGR C#GR ALSO STATUS CRGR REC 0004ENDATION l
MEETING OFFICE
' CATEGORY ISSUE TGPIC TO EDO I
NUMBER NUDGER AT CRGR I
I l
MEETING 18 i DATE I
AGEISA In#SER I I l
l [ NOTICE) l l_I i
11381 5/18/83 la) Review of the NRR 2
41 21&23 Completed Receaunended rule l
l (5/10/8311 proposed rule modifications and l
l 1
titled. Analysis resubmittal for further I I I
of Potential CRGR consideration after l l l
Pressurized staff work is completed.
I l
Thermal Shock l
i Events.
I I I
I I I Completed Receaunendation was not I I ib) Briefing NRR 2
86 I
I concerning a required. The Committee a
I i mager polacy endorsed the use of 1
I issue - NRR prioritization in 1
I methodelegy used managing generic issues l
I to prioritare and generally agreed i I generic safety with NRR's approach and I
I l
l Assues.
methodelegy.
I i
l I g g.....____..........
l I i
I I I
I i 1
I i 1
l I l
l I
I I
I i
{
l i
I I
I I I I 1
I i
i l i I I I l
l Page 28 et 45--
Summary of C#GR Activities Date 08-20-84 (November 1981 through February 1984) l l
.I l
SPONSORING CRGR CRGR ALSO STATUS CRGR RECODGEISATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO II NUMBER NUMBER AT CRGR I
MEETING i
is l DATE I
AGENDA NUMBER I
I I
l IMOTICE) 1 l__I I
I 1358 4/25/83 (Briefing concerningt NRR 1
85 38437 Completed Recommendation was not i
4 I l (4/21/83)lthe findings required. Comments were I i
' of the Sales offered.
I I Generic i i Implications Task i
I i IForce.
I I I
d i
I i
1361 4/29/83 IBriefing concerning NR2 1
85 35437 Completed Recommendation was not l l (4/27/83)lthe recommendations required. Comments were i I lof the Salen effered.
l l
l Generic 1
1 Implications Task 1
l Force.
I I I
i 1378 5/11/83 Review of staff MRR 1
85 35438 Completed Recommended approval l l (4/27/831 proposed actions with modifications.
I I an response to the I
l findings and l
l recommendations of I
the Salen Generic I
Implications Task i
Force.
I I
i i
1 I
I I
1 I I
I I
I I
I i
1 1 I l
l l
l l
1 1
'l l
i I
f
.M 4
Page 25 of 45-(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-34
~
3 I
I SPONSORING CRGR CRGR ALSO STATUS CRGR RECODGENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO i
l NUMBER NUMER AT CRGR I I I
MEETING 15 1 DATE l
AGESCA 1
NUMER l
1 l
l l_ I IMOTICEI l l
1 I
I I
l l
I341 4/22/83 laj Briefing NMSS 2
52 Completed Recoaumendatien was not l
l 14/4/83) I conceratag Low required. Ceannents were i
l l
l Level Waste Form offered.
I I
I and Classifi-1.
Forward for ACRS j
l l
l cation Branch
& public comuments.
j l l I
Technical 1
2.
Closely coordinate l
l l
Posations current and future j
l l l
lSTPst.
I activities with 1
l I I
l other agencies.
l l l
1 state and local
,l l l l
l governments, and I
l l l
I ll l.................--l.............--
1 andustry.
I I
l 1
1 l
I l
lb) Briefing NMSS I
2 53 Completed Recomunended that l
l l
concordang the l
- 1) Committee's report 1
l l
l findtags and I
be forwarded to l
l l l
recommendations andestry and NRC l I I
of the Committee l I l
to Review managers and license I l i
Safeguards
- 2) Rulemaking activities reviewers l I Requarements at should address t
l Powe r Re ac t e r s.
Coannit tee's findings l
I l
and recomunenda t io n s.
I I I
I l
l I
l l
I 1
1 I I
I I i
l 1
i i !
I i
i i
l i
i i
l l
l I
i l
l 1 I
l 1 l l
1 1 I I
i
( I I
I I I
l 1 l 1
I i 1
1 I l
J, 1 I I
l a
4
O Page 27 et 45--
Summary of CRGR Activities Date 08-20-34 INevember 1981 threegh February 1984) l I
I I
I SPONSORING l CRGR C#GR ALSO STATUS CRGR RECOWE80ATION I
MEETING OFFICE l CATEGORY ISSUE TOPIC TO EDO I
l NUMBER NUMBER AT CRGR I
1 3 Is i DATE AGEl@A MEETING l
I I
NUMBER I_
IMOTICEl_
1343 4/20/83 tc) Briefing RES 2
44 24,30 Completed Recommendation was not l l (4/4/83) I conceratag ATWS 39 (mig B42) required. Comments were i I l
rulemaking
$42 offered. Staff should l
l 1
activities.
i I i
reconsider I l 1
- 1) Reliability assurance l
l l
- 2) program requirements l
l l
Plant unique I I I
implementation of I I I
the rule.
g g g.._____.......
l l
1 I l ld) Review of IE IE 2
54 I
l l
Bulletin titled Completed Recommended that the l 3 l
ASME Nuclear staff assure that i
I l l
Code Pomes and
- 1) Product liabilities l
l l
Spare Parts and quality assurance I
I l l
Manufactured by i responsibilities are l
l l
l the Napard l
not degraded.
Tyler Pum
- 2) The information I l l
I I I
Company. p requested is needed.
l l
l
- 3) The focus is en I
i i
safety-related J
! I i
systems.
j i l l
- 4) Affected pumps and l l l
parts are tracked.
l 3 g.__
I I l
l 1
I l
l l
1 1 I
1 I I
I I l l j
i I
I i
i I
1 I
i i
i i
I i
\\
l l
e
i o
Page 25 et 45 Senumerv et CRGE Activities Date 08-20-84 (Nevember 1981 through February 1984) i I
I SPONSORING I CRGR CRGR Al.SO STATUS CRGR REC (DGEISATION I
MEETING OFFICE ICATEGORY ISSUE TOPIC TG EDO I
NUMER NUMER AT CRGR I I i
is i DATE AGENDA NEETING 1
I l NUMER
~l l_I IMOTICE) i I
l l i
i 1331 3/9/83 la RES 2
SS (2/25/83)l ) Review of 10CTR i
i l
Completed Receannended approvst Part 53 3
I I I
criterna and with modifictaiens.
j i i l
Precedures for t
i I l
Determaatas the i l i
Adequacy of I I l
Spent Meclear i I I
Feel Storage I I l
Cap ac a t y.
I I i
I
\\
l I l-----~~~~~~---~~---
i
~~~~--~~
~~~~~~-~
~~
---~~--
--~-~----
8 I I
j l
I
!b) Review of a NRR 2
40 51 Ceepleted Receaunended that the i i 1
major policy I i assue - MRR SRP revistems and I
l I findtags MUREG-0927 be released I I concerning for public comment after I I resoluties of CRGR comments concerning j
i i US1 A-1 implementaties are l i I
Hamme r., Wa t e r addressed.
1 I I l
I t l--------------~~~-
i I
-~~~~~~-~~-----l-~~~~~~~
-~-~~~~l--------- ------------------------
a i i I
i
~~-----
t i l ic) Briefing en ao RES i
2 51 Completed CRGR review was not I I I
amendment to I
! I i
- 10CFR50, needed. Seggestions I I l
Appendis E.
were effered.
8 I I
Frequency of I I I
Emergency i
I I
l Preparedness i
I I I
Euercises_
l i i 1
(Amendment i
l i I
conforms to FEMA I I l
action.)
\\
l 8 I
I I I
I I I
i l I I
l i I
I I I i
i i'
I i
I l
I l
H I I
ii Il l
v Page 24 of 45 Samuna ry of CRGR Activities Date 08-20-84 (November 1981 threegh February 1984)
~
I I
SPOstSORIIIG CRGR CRGR ALSO STATUS CRGR RECOpeEleATION I
BEETIteG OFFICE CATEGORY ISSUE TOPIC TO EDO I
I IIUseER NUISER AT CRGR I I I
l OEETIIIG te i DATE I
AGEleA i
IsupeER I I I
I I
I_I Ise0TICEI I 1
1 I
I I
I l
132I 2/17/83 laj Review of the i
AEOD 1
57
{l8&521 (2&28 ; icc.aple t ed Recessne-ded approval I
e 82/3/831 8 proposed fanal l l
I after modifications.
I I
I Rate 10CFR50.73.1 i
i I I
Lacessee Event i I
I I
Reporting l
l 8 I I
I I I l-------------------l---------------
1 I I
i 1
1 I
I I lb) Review of the 1
IE 2
58 28 lCeapleted Receamended approvat I I l
proposed I
(521 1 I
lafter modifications.
I I I
rewasses to 1
1 i
i I i
10CF R50. 72 I
1 1
8 I I
Immmedaate l
1 1
8 8 I I
metafication 1
1 l
l I I l
Requirements l
l l
l l
l l
for Operating i
I I
I I I
seeclea r I
I I
s I I
Re ac t e r s.
1 I I I
I I I I
1 I I I I
I I
I I I
l 1
I I I
s 1
I I I
I I
I I I
I I
I I i
1 l.
I I I
I I
I I I
I I I I
I
'I I I I
I I i
1 I I I
I I I
l I
I I
I I I
I I I I
I I I I
I i
l i I
I I I I
I I I
I I I
I I I I
I I I
s
a 6
Page 23 of 4S Seamary of C9GR Activities Date 08-20-84 lltoweeber 1981 threegh February 1984) l STATUS SPomSORIIeG C#GR CRGR ALSO C#GR REcopeeENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC 1 TO EDO I
impeER hiseER AT CRGR I I IEETIIeG i
18 I DA E AGENDA feUMBER I
I j
l_l_Ise0TICE1 l l
1311 2/9/83 lal Review of a IE 1
58 820,22, Completed Receannended approval 8 I I2/3/83) proposed IE 140) 449) after modifications.
(
I I se11etta tatted I
I I Stress Correstem I
I l l
Cracting in I i 1
Large - Diameterl l
8 3 I
Stataless Steel 1 I I I
Recarcelatten i
I I
I System Paping atl l
l l
8 BWR Plaats.
l-------------------l---------------
l l
I I I
l------------------------I l
I i
I i lb) Review of a IE 2
51 28 CeepletedlReceami. ended approvat i I I
proposed IE I
I I
Bellette titled lafter modifications.
l I I l
I I I
Fastures na Raw I
I I I
water Coeling i
I I I
Systems of I
i l
l 1
I I I
Diesel l
l l
I I I
Generators.
I I I i
l 1
8 8 I
i 1
I i
1
! I I
I I
I I
I I
I I I
I I I I
i i
i I I
I I I I
I 8 8 1
l l
1 I I
l i I I
i i
I l
I I
i 1
1 I
I l
8 I I
I I I
i i I I
l 8 I i
1 1
1 I I
I I
I I I
i J
l i I
l i I I
I e
e Page 22 of 45-(18evember 1981 threegh February 1984)
Seamary of CRGR Activities Date 08-20-84 II SPONSORISIG CRGR CRGR ALSO STATUS CRGR RECOBOEISATION I
MEETIIIG OFFICE CATEGORY ISSUE TOPIC TO EDO i
i IsupeER InseER AT CRGR i
i I I
IMEETIIIG 18 I DATE I
AGEISA lIOUBSER B I i
i i
I i
l _ I._flooTICEI 1 I
l I I I
I I
1308 1/28/83 la) Briefing i
RES 2
44 24 Completed Receaunendation was not I I (1/13/83]I concernang I
34 39 IMTG 842) required. Ceaneents were l
8 l
l guesticas that t
&4k effered.
1 I resulted free 1
i I the ATWS I
i
)
l I
briefing given i I
I I at seeetang s24. I I I i
1 I I
......__...........I g i g
l.......__.____.
8 I I
i I I lb) Briefing i
IE I
2 55 42 Ceapleted Receanmendation was met I I I
concernang IE I
I l
i actions to required. Ceaunent s were I i 1
address a effered.
I I I I
potentially I I I
signitscant I I l
prehlem j
I I I
pertaining to I I I
fraudulent i
I I
products sold by I
I I
Ray Miller Inc.
I I l
I I
I.
I I I I
I I I
I I I
I I I
I l
l I I I
I I I
I I I
I i i
I I I
I I
i 1 1 1
I I i
i I I I
i 1
1 I
i I i i
I 1 I I
,i I
I i
l I
Page 21 of 45-(IIoveeher 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 l
Ii SPostSORIDIG CRGR CRGR ALSO STATUS CRGR REcopeEISATICII i
l DEETIIIG OFFICE CATEGORY ISSUE TOPIC TO EDO l
l IOUMBER IIt#SER AT CRGR i
I i
i HEETIIeG 18 1 DATE I
AGEISA IRNSER l I i
l_._l _ tas0TICE 1_ l 1 I I
1291 1/04/83 la) Review of the ELD 2
53 Ceepleted Receamended approvat I
i 1/12/83 I proposed after modifications.
I 1(12/23/82]l rewasion to l
l l
10CFR Part 51 to i I I
implement the 1 4 I
precedural i I I
previstans of I
I I I
sectmen 102 21 1
I i
1 et leEPA.
J l i I
I____...____...I........
4 g g g
g I I I
I l th! Review of the IIRR 2
54 Completed Receaunended approval.
l I l
final rule and 1
I l I
accompanying I l pe11cy statementi I 4 concerning l
i operater i
I I
i staffing at i
i I
i maclear pow r i I I
plaats.
I I I
I I I
I I I I i l
i l I
I I I I I
I I I
I I I
I I I
I I I
I I I
i I
I i
i I
I l
I I
I I
4 I
I I
I i
1 I
I J
l I
I I
Li l
i
i Summary of CRGR Activities Date 08-20-84 i
Page RO of 45--
l November 1981 through February 1984)
I l
SPCNSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION i
l MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I
l NUMBER NUpeER AT CRGR j
l I
I l
MEETING la l DATE l
AGENDA l
NUMBER I 1 l
I l t IM3TICEl_4 l
1__1 I
i 1281 12/21/82 lal Briefing IE 2
51 31 Completed The Committee concluded l ll12/3/82) I concernano IE IMTG 8311 that actions planned by 1
1 I
activities on IE are appropriate.
1 I I
check valve I I I
failures.
I I
l-------------------
I I
I 4
I I
lb) Briefing AEOD/IE 2
52 12&32)
Completed Recommendation was not I
l l
conceratag 18&57)
IMTG 8321 required. Comments were i
i l l l
rulemaking offered. The Committee i I I
activities l
suggested that the rule-l l
I regardsng 10 CFR makang activities should i
I l
50.72, 10 CFR address coordination of I
l l
50.73, 10 CFR all reporting i i 1
50.55e and 10 requirement s for powe r I I l
CFR 21.
reactors and should l
l l
lLER & Immediate require no more than 3 l ;
I Notification reporting intervals.
j l
l 3
Rulemaking i
i 1
Activitiesi i I l-------------------
I I
I j
l l
tcl Continued review NRR 2
47 2S&66 Pending Retsrned to sponsor for I I I
of the proposed additional work and I
I l
resolution of subsequent CRGR review.
I I
l USI A-43, l
l Containment Sump l
i
)
l l
Performance.
l I
e i
Previously I
i !
I dtscussed at 4
i l
l Meeting 326.
l I
l i
l 1
l l
l 1 I l
l l
1 I
I 1 I I
i 1
I l
l I I I
I I
I I
I l
l 8
I I
I I I
I I
I i
4 Page 19 of 45 Sunnsary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l 1
SPONSORIIIG CRGR CRGR ALSO STATUS CRGR RECOpe4EISATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TG EDO i
i NUMBER NUhSER lAT CRGR l
l l
i 18 1 DATE I
AGENDA IMEETING I
I I
INUMBER i
l I_[ NOTICE) l l
l __1 I
i t
1271 12/3/82 lal Briefing RES 2
49 I Il11/24/82)I concerning the Pending Returned to sponsor for l
1 1
proposed additional work and I I Regulatory Guide subsequent CRGR review.
I I titled
- 1) The applicability of 1
1 Instrument the RG needed confir-I 1 1
Sensing Lines.
mation with NRR.
i I
I
- 2) The RG shostd be held I i 1
1 pending an EDO i
i I i
decision concerning t
1 I
policy on RGS for CP I
1
.... applicants.
I I
l l b) Review of a IIRR 2
50 Completed Recomumended approval I
I major policy I
l issue - the with modifications.
1 1 I proposed NRR i
l i
Staff I I Plan for eval-
}
I l
unting the I
l Commission's i
I Safety Goal.
I l i I I
i 1
1 1 I
I I I
I l
l t
i I I
i i i 1
1 1 i
2 I
i i
i l
I I i 1
1 I
I I I I
1 i
I l
8 8 1
i i
1 I
i I
i i
1 1
I I
1 i
1 I
I l
l 1
1 I I I
I I I
-~
Summary of CRGR Activities Date 08-20-84 Page It of 45--
(November 1981 through February 1984)
I I
SPONSORING CRGR CRGR ALSO STATUS CRGR RECOpe9EISATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO i
NUMBER NUMBER AT CRGR 1
l l
MEETING is l DATE I
AGENDA 1
NUMBER I
I i
1
__l (NOTICE) I 1
1261 11/24/82 a) Review of a NRR 2
47 2B466 Pending The Committee decided to I ll11/12/32]l major policy discuss USI A-43 at a i
1 i
issue - the lsubsequent meeting after 1
I i
proposed I
information on the 1 I I
resolution of I
potential effects of I I I
USI A-43 I
paint debris has been i
l l
Containment received from NRR.
I 1
1 Emergency Semp i
l l
Performance.
1 I l-------------------
1 1
1 I I lb] Review of the NRR 2
48 Completed Recommended approval i
1 1
proposed after modifications.
I 1
l revasion 13) to i
I I
Regulatory Guide l
l l
1.97 I
1 l
Instrumentation l
l l
1 for Light-Water-1 I
I Cooled Nuclear l
l l
1 Power Plants to I
l l
Assess Plant and 1
I l
Environs 1
I I
Conditions 1
I During and 1
I Following an i I Accident.
l l
l l
1 1
1 1
1 1
1 1
I i
1 1 I I
i l
I I
I I
I I I
j i
I i
i 1
i i
l i
I I I
I I I
I I
I I
i i
l I 1
I I
I I
I I
Page 17 of 45-(November 1981 through February 1984)
Samuna ry o f CRGR Ac t ivit ie s Date 08-20-84 I
i 1
1 SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION 1
NETING 1
OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I I i
MEETING 18 1 DATE I
AGEIR)A NUMBER I
I I
l i_LNOTICE )
I_i 1251 11/18/82 a) Briefing RES 2
45 25,62 Completed Not required. Comunit t ee i
1110/22/82) conceratag the 463 o f f e red comument s.
I 1
proposed major I
i rewasion of 10 l
l CFR 20, I
l Standards for I
1 1
Protection j
1 1
1 Against i
i 1
Radiation.
l l
l l
______.________l.___...l__.___.
l 1
l....______..____.__
l l
I I
I i
Ib) Briefing RES 2
48 86463 Completed Return to RES with I l I
conceratag the suggestion that the rule l
l l
proposed not be pursued.
1 I
i amendment to 10 l
l l
CFR 50 1
l l
concerning i
i i
radiation ALARA.
1 I
I I I i
l I
i 1
1 I
I I
i i
i 1
I I
i 1
1 1
1 I I I
I l
1 i i
I j
i I
1 I
i i
i i
I i 1
I I
i I
l l
l 1
l I
I I
I I
I I
I I
I I I
l 1
I I
i 1
1 I
Page 16 of 45-Susumary of CRGR Activities Date 08-20-34 (Nevember 1981 through February 1984) i I
l SPONSORING CRGR CRGR ALSO STAT S CRGR RECObeEISATION I
DEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I
NUMBER NUMBER AT CRGR t
i I MEETING ls 1 DATE AGENDA NUMBER I
I I
I_l_1 NOTICE)_1 i
124l 11/3/82 a) Review of a IE 2
42 Completed Recomumended approval of I
(110/20/821 proposed IE l
j 1
l l
Bulletin titled general approach after modifications.
1 1
1 Overeuposures in I
l l
pWR Reactor 11 Bulletin not needed.
- 2) IE should inform i l l
Cavities.
i I l
licensees of NRC's intent to vigorously 1 I I
enforce regulations l
l 1
concerning l
l l
l overeuposures.
1 I !
l I
1 1 __________________1._____________ il._______
_______1.________
l i
1 l
I I lb) Review of a i
IE 2
43 (18)
Completed Recomumended approval l
l 1
proposed IE I
(37) after modifications.
I I
I Bulletin titled l l l 1
Deficiencies in {
1 l
l l
Primary l
I I
I i
l Containment 1
I l
I I
Electrical l
I Penetration l
s 6
l Assemblies.
1 I
l l
- i 1
1 3.__________________
1 1
1 I
i lc) Briefing l
RES I
2 44 30 Completed comunit tee requested a I
i i
concerning the 1 34.39 (MTG 842) subsequent briefing to i
I I
RES proposal to l 442 l
address questions raised I.
I address ATWS.
l l
l by t he Comunit t ee.
l I
I i
1 I
l l
I I
I l
1 I
i i
1 l
l l
1 I
I I
I i
1 1
I l
)
l 8
l I
I I
l l
I 1
I I
l 1
f i
1 l
I I
I I
)
i I
e I
i 1
1 I
l_1 i
i
e
~~
Summary of CRGR Activities Date 08-20-84 Page 15 of 45--
INovember 1981 through February 1984)
CRGR RECODGEleATION SPONSORING C2GR CRGR ALSO STATUS i
i MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I
NUMBER NUMBER AT CRGR MEETING I
l 1
18 1 DATE I
AGENDA NUMBER l
I 1
l l__l
[ NOTICE) 1 1
1 I
i 1
l 1221 10/8/82 lal IE requested IE 1
40 20&45 Completed Recommended approval i
ll10/7/82) I review of a 156) 131) after modalications.
a I I I
proposed IE I
1 l
Bulletin titled i
i l
l Stress Corrosion I
l l
Cracking in j
i i Thick-Wall Large l
I Diameter
)
l l
l Stainless Steel
'l l
l l
Recirculation I
I I
l System Piping at l
I l
BWR Plants.
I l
l I
l i
I 1 I I
I I i
1 l
l__...__
1 I
I I
39 20 Completed Recommended approval i
i I
i review of the after modifications.
I I
issue of reacter 1
I coolant pump i
i trip criteria l
l I
for PWRs.
I l
l discussed at i
l 1
Meeting 820.
l I
[
~
l i
1231 10/28/82 Review of NRR 2
41 21&38 Completed Recommended approval after modifications.
i Il10/14/82)lalternatives for i
l i
Iresolving l
l l Pressurized Thermal l
I ishock IPTS).
l l
lPreviously l
l Idiscussed at l
l l
IMeeting 821.
I i
1 I
I i
1 1
I I I
i 1
l 1 i i
I
Page 14 of 45--
(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 SPONSORING CRGR CRGR ALSO STATUS CRGR RECOPO4ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING 8
DATE AGENDA MUMBER
__l INOTICE) l=
1 191 9/15/82 Review of the NRR 2
26 11 Completed Recommended approval l
l(8/30/82) IInadequate Core after modifications.
1 I
(Cooling The Committee reaffirmed l
IInstrumentation its previous conclusions Design Study (Meeting 811) and made results.
recommendations.
201 9/21/82 a) NRR requested NRR 1
39 22 Completed Committee deferred l(9/20/82) review of a (MTG 822) making recommendation i
major policy until additional I
issue - the information concerning i
proposed pump run/ trip scenarios i
resolution of had been developed by
[
the reactor the staff coolant pump trip issue.
40 22445 Completed Not required. Comments review of the (56)
(31)
(mfg 822) were offered.
proposed actions and rough cost estimates associated with l
l resolution of I
the BWR pipe I
cracking issue.
21 10/6/82 Review of a major NRR 2
41 23 BC w leted The Committee decided to I
(9/22/82) policy issue -
! MTG 823) continue review of this recommendations issue af ter cost / benefit concerning information was provided Pressurized Thermal and near term fluu Shock (PTS).
reduction measures were considered by NRR.
l
Page 13 of 45--
Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) i I
l l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l
MEETING l
OFFICE CATEGORY ISSUE TOPIC TO EDO l
l NUMBER NUMBER AT CRGR l
MEETING 18 DATE AGENDA NUMBER I
__I INOTICEI 17l 9/01/82 EDO requested ELD 2
36 Completed Recommended approval I
f(8/18/82) review of the after modifications. An 1
I proposed rule and alternate proposed rule i
policy statement should be forwarded to concerning the Commission.
backfitting.
118d 9/9/82 a) Review of a IE 2
37 (24)
Completed Recommended approval.
l l(8/24/82) proposed IE (431 l
circular titled l
Deficiencies l
in Primary l
Containment Electrical Penetration Assemblies.
I i
l bl Briefing RES 2
38 Completed Recommended approvat I
concernang after modifications. The I
proposed Committee offered I
revision to 10 CFR 140, comments concerning the l
Criteria for an proposed criteria and suggested that RES work l
Extraordinary with NRR and ELD in l
Nuclear i
Occurrence.
preparing the final rule chance.
i Summary of CRGR Activities Date 08-20-34 Page ~~12 of 43--
(November 1981 through February 1984)
I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOPO4ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING I
,e 1 DATE AGENDA NUMBER I
1__
(NOTICE)
Completed Recommended approval.
L16 8/11/82 a) Review of a NRR 2
32 17/23/82]
majc t policy issue - the proposed technical I
resolution of USI A-39. Safety Relief Valve i
Dynamic Loads I
Completed Recommended approval l
b) Review of the ELD 2
33 after modifications.
i proposed The EDO forward both the 1
iRegulatory Guide RG in final form and the I
concerning the related proposed rule i
form of Nuclear modification to the l
Energy Liability Commission in a paper i
Policy for that calls attention to Facilities.
the potential for I
protracted licensing hearings.
Comp 1;'ed Recommended approval Ic) Review of the RES 2
34 after modifications.
I proposec final I
rule concerning I
reporting of l
1 changes to l
l 1
l Qualsty i
I Assurance Programs.
l d) Review of the NMSS 2
35 40 Completed Recommendation was not I
proposed insider IMTG S40) required. Comments were offered.
i Rule.
1 I
I I
I i
1 1
1 1
e Page --11 of 45--
(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 i
SPONSORING CRGR CRGR ALSO STATUS CRGR RECODMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR l
l MEETING 8 i DATE I
AGENDA NUMBER INOTICE)
[14 5/20/82 c) Briefing ADM 2
30 Completed Recommendation was not I
(5/14/82) I concerning the reautred. Comments were reporting and offered.
record keeping requirements
- 2) DEDROGR and ADM staff 1 EDO be briefed.
1 imposed by NRC.
investigate further the burden and i
explore possible improvements.
15 7/7/82 Review of a major NRR 2
31 S&7 Completed Recommended approval l(6/24/821 policy issue -
(14) after modifications.
proposed guidance for Implementing the Revised Rule f o r Documenting Deviations from the Stacadard Review Plan.
I I
I i
I i
i i
l 1
I I
I I
I I
I i
e Page 10 of 45-~
(November 1981 through February 1984)
~~
Summary of CRGR Activities Date 08-20-84 l
l SPONSORING CRGR CRGR ALSO STATUS CRG2 RECOMMENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR l
MEETING S
DATE l
AGENDA NUMBER l
B__
INOTICEI l f
h13 5/12/82 EDO requested RES 1
28
--- l Completed Recommended approvat I
(5/7/82) review of the after modifications.
l l proposed final rule l
lconcerning environ-l Imental qualifica-I liion of electrical I
equipmental.
14 5/20/82 a) Review of the RES 2
29 Completed Recommended approval.
- (5/14/82) proposed l
l revision to l
l Regulatory Guide i
1.145, l
Atmospheric l
Dispersion l
Models for l
Potential l
Accident i
1 Consequence Assessments at Nuclear Power i
Plants.
l l___________________
_________g________________________
lb) Reconsideration RES 2
25 10&11 Pending l Returned to sponsor for l
l of the proposed l additional work.
The Regulatory Guide Committee decided to titled postpone reconsideration Qualification of the guide until after and Acceptance interoffice coordination 1
Tests for has been completed.
I Snubbers Used in Systems l
Important to Safety.
I
e Page --9 of 45--
(November 1881 through February 1984)
Summary of CRGR Activities Date 08-20-84 I
f l
SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I
NUMBER NUMBER.
AT CRGR I
l MEETING 18 l DATE AGENDA NUMBER I I l__l l NOTICE) 111 4/2/82 al Review of the RES 2
25 1D&14 Pending The Committee requested l
(3/19/821 proposed that f urther inf ormation l
Regulatory Guide be provided to I
i titled reconsider the Guide at Qualification a future meeting.
and Acceptance Tests for Snubbers Used in i
Systems Important to l
I Safety.
I b) Briefing NRR 2
26 19 Completed The Committee requested I
concerning a (MTG 819]
that this topic be i
major policy reviewed again after I
l issue - the receipt of further I
I status of TMI information from NRR.
I i
l Action Plan.
l l
Task II.F.2 i
I InstrumentaIion J
for Detection of I
I I
Inadequate Core l
Cooline.
I 121 4/29/82 IIE requested review IE 1
27 Completed Recommended approval l(4/26/82) lof a proposed IE after modifications.
I l
Bulletin titled I
I Degradation of l
I Threaded Fasteners I
l i
in the Reactor
.i l
Coolant Pressure i
boundary of PWR Plants i
I I
I I
l l
t Page --8 of 45--
(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 l
l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOpeEISATION I
I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I
I MEETING el DATE l
AGEleA NUMBER I
I I
I__l INOTICEI I 1
I l
t 19 l 3/11/82 lIE requested review IE 1
21 Completed Recommended approval.
I l13/10/82) lof a proposed IE l
l l Bulletin concerning The proposed Bulletin will be issued subject I
l Alteration of to IE verifying the list 1
l l
Radiographs of of affected plants.
Welds in Piping l
l Subassemblies.
101 3/17/82 al Review of a IE 2
22 11414 Completed Recommended approval l13/11/82) proposed IE after modifications.
circular Committee suggested that concerning Pipe
- 1) An Information Notice l l
containing no requir-l j
l ements would be more I
appropriate and l
- 2) The systems having i
I the haghest rate of I
l snubber failures I
should be explicitly identified in the
...E!IA**1.......___...
I b) Briefin ADM 2
23 Completed Recommendation was not concern ng a required. Committee major polacy suggested certain I
issue - the modafications to the
[
l l
draft Regulatory procedures.
~
l l
Analysis l
l Procedures.
g____.._____......__
l l
l lc) Briefing RES 2
24 Completed Recommendation was not l
l concerning j
required. Comment s we re I
research program offered. The committee I
to develop noted that it may from I
methodology for time-to-time request RES l
l value-impact assistance in this area.
l assessments.
I I
(
1 Page 7 of 45 Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)
SPONSORING CRGR CRGR ALSO STATUS CRGR REC 044EISATION MEETING OFFICE CATEGORY ISSUE TDpIC TO EDO NUMBER NUMBER AT CRGR l
MEETING 8 1 DATE AGENDA NUMBER I
l__
IMOTICEI 1
17 2/3/82 cl EDO requested NRR 2
14 S&15 Completed Recommend that rule not i
2/10/82 review of the (31) go forward.
1 (1/29/82) proposed final I
rule concerning Documentation of Differences from the Standard Review PlantSRP)
I g__________.______._
I I
I ld) Discussion with IE 2
9 3,445 Completed Recommended approval I
l NRR and IE after modifications.
Office Directors I
concerning
)
I proposed I
requirements for i
1 Emergency l
l
Response
l I
Facilities.
l I
8 1 2/24/82 la) Bricfine RES 2
20 Pending Returned to sponsor for l(2/17/82) concernIng the additional work and i
1 proposed Post CP resubmittal for CRGR 1
l Change Rule.
consideration after I
i staff work is lI completed.
l l
l l
b) Review of the RES 2
7 2
Completed Recommended that Reg i
proposed Guide revision not be Revision (1) of issued.
Regulatory Guide 1.23, Meteorological Mk as u reme n t Program for l
Nuclear Power l
Plants.
1 l
l
l O-1 f
Page Summary of CRGR Activities Date 08-20-84 l
--6 of 45--
(November 1981 through February 1984)
SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I
NUMBER NUMBER AT CRGR l
l MEETING 18 1 DATE AGENDA NUMBER l
1 l
l l__l_1gDTICEI I
1 Completed Recommended approval 6
1/27/82 c) Review of the RES 2
16 L
11/26/82) proposed Rule on after modifications.
I Accreditation of l
Testing i
Laboratories for i
Equipment l
Qualification.
Completed CRGR recommendation was d) R. Bernero (RES)
EES 2
17 I
briefed the not required. Comments f
I Committee were offered, i
concerning a l
l standard table l
for Regulatory 4
l l
Guide isolementation.
Completed CRGR recommendat ion was 7
2/3/82 a) Briefing NRR 2
18 2/10/s2 concernang NRR not required. Committee (1/29/82)
Prioritization requested that NRR keep I
of Safety CRGR informed concerning i
Issues.
NRR's actions to incorp-I orate prioritization I
into MR plans for U
l l
dealing with the Generic j
i l
i Safety Issues.
g l....._____......___
I Completed Committee recommendation NRR 2
19 lb) Briefing was not required.
concerning a I
I major policy Committee suggested that issue - the NRR j
NRR implement the procedures for procedures to control I
changes to the the retrofit of current l
Standard Tech-STS on operating i
l i
nical Specific-reactors licensed to I
ations (STS).
earlier STS.
l l
t I
e t
Summary of CRGR Activities Date 08-20-84 Page --5 of 45--
(November 1981 through February 1984) i I
l SPONSORING CRGR CRGR
- ALSO STATUS CRGR RECOMMENDATION I
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I
I I
MEETING 18 l DATE l
AGENDA NUMBER I
I I
- I INOTICEI 5 l 1/13/82 b) Continued IE 2
9 3,4&7 Completed 1) Based on CRGR I
i 1/21/82 discussion of IMTG 87) guidance, the Staff meeting numbers is to revise the I
l(1/22/82f 12/21/81) 3 and 4 Topic -
proposed requirements l
l Facilities, and i
I Equipment and
- 2) the revised require-I Procedures to ments were to be l
Cope with finalized by the i
Emergencies at CRGR, NRR and IE I
Nuclear Power Office Directors.
l l
Plants.
___.___3.______
g g
g_..._______..______
l Completed CRGR recommendation was l
c) Briefing NRR 2
13 4
I concernang the not required. Comments i
I Equipment were offered - Plan I
l Qualification needed better focus and l
l l
Program.
definition. Commit.ce l
l l
requested a copy of the l
l Draft Program Plan I
concerning Equipment Qwalification.
6 1/27/82 a) Review of the NRR 2
14 7&15 Completed Based on NRR request.
I l(1/26/82) proposed (31)
(MTG 871 the subject review was I
I revision to the postponed to a later t
)
l l
rule concerning date (MTG 87).
l l
documentation of l
l differences from l
l the standard I
review plan.
11 i
15 Completed Recommended approval l
l review of a after modifications.
major policy
I l
Electrical and report back l
Terminal Blocks within 2 weeks.
l l
l l
Exposed to a
- 2) EDO holdup the NRC l
LOCA or Steam eply to Congressman Environment.
Udall on thas matter until the staff has resolved the matter.
i
l l
Summary of CRGR Activities Date 08-20-84 Page --4 of 45-(November 1981 through February 1984)
J l
l l
SPONSORING CRGR CRGR Al.SO STATUS CRGR RECOMEIDATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR I
il MEETING he DATE AGENDA INUMBER
_I (NOTICE) l 4 l 12/10/81 b) E. Jordan (IE)
IE 2
10 Completed CRGR recommendation was I
(12/7/81) briefed the not required. Comments l
Committee were offered. Committee 1
I concerning IE requested that this plans to prepare matter be brought to the a Commission Committee when the paper on proposed quality l
1mproving assurance requirements quality have been defined.
i i
assurance I
procedures at i
nuclear power i
l l
ll _ _ _ P_ _l a n t s.
l l
1 Completed Recommended approval l
l tc) Briefing RES 2
11 l
l l
concernang after modifications.
l l
l major polacy Committee requested that l
l s
issue - proposed RES inform the Committee 4
l l
t severe Accident of activities in this t
i e
Rulemaking and area.
I l
Associated i
l l
Matters.
l l
15 l1/13/82 la) Briefing RES 2
12 Completed Recommended approval l
l 1/21/82 l concerning a after modifications.
i 1/22/82 l proposed l(12/21/81)
Revision (3) of i
Regulatory Guide l
1.68, i
i l
Preoperational l
]
l Test of Instru-i ment and Control i
Air Systems.
I I
3 l
l l
t t
i I
1 i
i i
d i
1 Summary of CRGR Activities Date 08-20-84 Page
~~3 of 45-(November 1981 through February 1984) l l
SPONSORING CRGR CRGR ALSO STATUS CRGR RECce#EEISATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMRER NUMBER AT CRGR I
MEETING l
l NUMBER 18 l DATE AGENDA 1
1 l__l IMOTICE) 1 12 11/19/81 el Briefing AEOD 2
8 (2B&32) C w leted CRGR recommendation was I
(11/13/81) concerning the (52&57)
(MTG 832) not required. Comments were offered.
I proposed 10 CFR 1
l Part 50.73, i
1 Licensee Event l
l Report System.
I I
3l 12/3/81 IBriefing of major IE 2
9 4,5&7 Cogle t ed 1) Immediate action is f(11/25/81)lpolicy assue IMTG 87) needed to clarify and coorc.nate I
lconcerning -
l l
Iracilities. Equip-requirements.
I 1
ment and Procedures
- 2) Subsequent CRGR l
to Cope with Emerg-review pending additional staff i
encies at Nuclear work.
I Power Plants.
i 14 12/10/81 a) Continued IE 2
9 3,5&7 Completed Program Offices should 1
(12/7/81] I discussion of IMTG 87) c omme n t on requirements I
l Mketing Number 3 modi *ications proposed I
topic of by the staff.
l Facilities, i
1 Equipment and 1
Procedures to l
Cope with l
Emergencies at i
Nuclear Power I
Plants.
1 I
I II l I i
1 1
1 l
l
}
i I
i
J 1
Page
~~2 of 45--
(November 1981 through February 1984)
Summary of CRGR Activities Date 08-20-84 l
I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOpeEICATION l
MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l
NUMBER NUMBER AT CRGR l
l MEETING 18 l DATE AGENDA NUMBER I
I l__l INOTICEl_
l l
l2 1 11/19/81 a) Review of major EDO 2
1 1
Completed Recommended approval of I
l(11/13/81) policy issue -
(DEDROGR/CRGR) the charter and l
l nedifications to procedures as modified.
l CRGR Charter and l
Procedures as I
discussed at l
Pketing 51 l
l l__......__.._______
I l
l l l bl Review of the IE 2
5 Po ding Returned to sponsoring l
l l
proposed IE (A IM:
office for additional I
i Bulletin titled IE work.
Subsequent CRGR l
l Generic froblems A
y review wt. additional WAPfv(J l
l Associated with TE.information is received l
l Elastomers used from IE.
l l
in ASCO NP-1 l
l Valves.
I i l
l l
l l
l l
lc) Discussion of RES 2
6 Completed Recommendation was not l
l l
major policy required. CRGR comments l
l l
issue concerningt were offered - CRGR l
l 8
requirements I
review of this type of i
I l
l l
placed on OL l
RES activity was not I
I and cps by RES.
appropriate where cps l
l l
and OLs voluntarily l
l participate.
l l
i i
I l
l d) Review of the RES 2
7 8
lC g leted Returned to sponsoring i
i proposed (MTG 88) office for additional l
l revision (1) to j
work. Subsequent CRGR l
l RG 1.23
\\
review after additional l
l l Meteorological information was received
'i l
l Measurement from RES.
I I
Programs For I
i Nuclear Power 4
i l
Plants.
I l
l l
i I
1 i
a I
1 Page --1 of 45~~
(November 1981 through February 1984)
Summary of CROR Activities Date 08-20-84 l
l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO 3
NUMBER NUMBED AT CRGR
)
l l
MEETING 18 l DATE AGENDA NUM8ER l
8
__ (NOTICEI 1.1 11/12/81 a) Review of major EDO 2
1 2
C g leted Charter and Procedures r
l l(11/10/81)l policy issue -
(DEDROGR/CRGR)
(MTG 82) should be modified.
l l
CRGR Charter and j
l Procedures.
l l
I I I b) Briefing EDO 2
2 2
Completed CRGR recommendation was l
l l
conceratag the (DEDROGR/CRGR) not required. Comments l
l l
Survey of were offered.
ll Mechanisms used l
to Communicate l
l with Licensees &
l l
Proposed Methods l
l for Controlling l l Communications l
with Licensees.
l l
I I
l l
c) Briefing NRR 2
3 Ceeplet ed CRGR recommendation was l
l concerning the not required. Comments l
l status of were esfered.
l l l
Implementation l
l l
of Action Plan l
l Items, NUREG l
l 0737.
l l
l 1 I dl Briefing ADM 2
4 Comp 1;ted CRGR recommendation was l
l concerning OMB not required. Comments l
l clearances for were offered. Proposed l
l reporting and new generic requirements l
l record keeping should include for CRGR l
l requirements review the information l
l under Paper Work needed for OMB I
l Reduction Act.
clearance.
l g I
i l
l l
l l