Forwards Rept on Cable Installation, in Response to Item 2 of IE Insp Repts 50-329/82-06 & 50-330/82-06 Per 820514 Meeting & 820528 Commitment.Cable Reel Numbers Corrected. Plant Is in Full Compliance
ML20063L192
Person / Time
Site: Midland
Issue date: 06/11/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20063L149 List:
References
17513, NUDOCS 8209080665
Download: ML20063L192 (2)


Text

., - -

n 7

c e

@ CORSum8f5 Power James W Ceek Company w, m.m., - ~g<,

r.,. -..,

and Construction General Offices: 1945 West Parnait Road, Jackson. MI 49201 e_(517) 788 0453 June 11,1982 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Cornission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -

INSPECTION REPORT No 50-329/82-06 & 50-330/82-06, ITEM 2 FILE:

0.h.2 SERIAL:

17513

References:

(1) NRC Letter, C E Norelius to J W Cook, dated April 26, 1982, transmitting Inspection Report 82-06 (2) CPCo Letter, J W Cook to J G Keppler, dated May 28, 1982, Serial 16182, responding to Inspection Report 82-06 Reference (1) deals with misinstalled cables and incomplete cable reel numbers.

A meeting was held in Glen Ellyn on May lb,1982, at which time Consumers Power presented a draft report on misinstalled cables. This letter, as promised by Reference (2), provides the released report on misinstalled cables. The released report has been updated to address the comments generated during the May lh meeting. The report also provides the dates for which the corrective actions will be completed in order to put the plant in full compliance. A special training session (QCT-1616) was conducted for Bechtel Quality Control on PQCI E-h.0, " Cable Pulling," on March 15, 1982. This training emphasized Activity 2.5 of the PQCI which concerns itself with cable vias, especially in regard to the type of problems identified during the Special Overinspection of cable routing. This training along with the continued emphasis in the training and certification of new electrical QC engineers provides the process corrective action to help assure better performance in this area.

With regard to cable reel numbering, the following actions have been taken to correct the specific instances and to preclude recurrence:

1.

The cable reel numbers have been corrected, as necessary.

2.

A cable reel list, with a cross-reference between the old numbers recorded and the real numbers that incorporate the purchase order number and the manufacturer's reel number, has been cade a part of the E-h.0 " Cable Installation" record files in the QC' vault.

3 l

8209080665 820902 PDR ADOCK 05000329 G

PDR g

7*:

~

g.

- 2 l

Serial'17513 3

The number being recorded on inspection records at this time does incorporate the purchase order number and the manufacturer's reel number.

NCR M01-9-2-022 which documents these actions was closed on 5/17/82 and the plant is now in full compliance.

Consumers Power Company By

)M/ ~

~

YdEies W Cook Sworn and subscribed to before me on this h day of June,1982.

eE4_o Notary Public, Jackson County, MichiMm My commission expires September 8, 198h WRB/BWM/1r CC: PJCook, NRC Resident Inspector, Midland _ Site (v/ene)

RLandsman, NRC Region III (w/ene)

RGardner, NRC Region III (w/ene)

Enclosure:

" Report on Cable Installation, Midland Plant Units 1 and 2, June h, 1982" e,n

,. h

.