ML20084E285
| ML20084E285 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/21/1974 |
| From: | Amish K ROCHESTER GAS & ELECTRIC CORP. |
| To: | Oleary J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084E289 | List: |
| References | |
| NUDOCS 8304150008 | |
| Download: ML20084E285 (1) | |
Text
_
n
( >,:
[,\\
a w>
~ s
~.
1 t
s
~. -
ROCHESTER GAS AND ELECTRIC CORPORATION = 89 EAST AVENUE, ROCHESTER, N.Y. I4649 KEITH W. AMI5H vatspwont SENIOR vlC E PRESIDEN T ant e code 7ee 5 46 2 700 E L EC T Falc AND S T E AM March 21, 1974
.A Mr. John F. O' Leary, Director fd Directorate of Licensing y,
3 U. S. Atomic Energy Commission f
RIQ..$' 'j' 7920 Norfolk Avenue
'f, a
Bethesda, Maryland 20014
'/,
U
Subject:
Steam Generator Inspection and Tube Plugging R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Mr. O' Leary:
On February 19, 1974 an interim report was submitted concerning Abnormal Occurrence 74-2.
Since that time, analysis and investigative action has been conducted by our supplier, the Westinghouse Electric Corporation, for us.
Enclosed is a report on the analysis, inve stigation, and the current status of steam generator work at the R. E. Ginna Nuclear Plant. This report is the follow-up report referred to in our February 19, 1974 letter.
Very truly yours,
./
}/
J,A
'Keith W. Amish Enclosure
/
/
i l'h '
r 8304150008 740321 DR ADOCK 0500024]
5 gg
/
COPY SENT REGION V_
.