Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Proposed Changes to Pump & Valve Test Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20070C988  + (Forwards Proposed Changes to NPDES Permit PA0009733.Amend Necessary to Support Power Rerate Program. Rept on Fish Populations in Conowingo Pond Re NPDES Permit Application for Peach Bottom... Also Encl)
  • ML20117M634  + (Forwards Proposed Changes to NPDES Permits for Songs,Units 2 & 3,per App B of Units 2 & 3 Ts,Section 3.2,Environ Protection Plan to Licenses NPF-10 & NPF-15)
  • ML20217H921  + (Forwards Proposed Changes to NPDES Permits for Songs,Units 2 & 3,per App B of Units 2 & 3 Ts,Section 3.2,Environ Protection Plan to Licenses NPF-10 & NPF-15)
  • ML20097E966  + (Forwards Proposed Changes to NRC First Draft of Combined TS Section 3/4.7.7 Re Svc Water Sys,Per 920423 & 24 Meetings W/ NRC)
  • RBG-20-500, Forwards Proposed Changes to NRC Second Draft of Tech Specs. Brief Description of Proposed Change,Justification for Change & marked-up Pages from Second Draft Also Encl  + (Forwards Proposed Changes to NRC Second Draft of Tech Specs. Brief Description of Proposed Change,Justification for Change & marked-up Pages from Second Draft Also Encl)
  • ML20214D858  + (Forwards Proposed Changes to Next Rev to FSAR Amend 18)
  • ML20078A829  + (Forwards Proposed Changes to Nuclear Boiler Sys Preoperational Test,Clarifying Test Intent & Content.Rev Will Be Included in Next FSAR Rev)
  • AECM-84-0340, Forwards Proposed Changes to Offsite & Unit Organization Charts Contained in Tech Specs & Resumes of Individuals Holding Positions Shown in Organization Charts,Per NRC Telcon Request  + (Forwards Proposed Changes to Offsite & Unit Organization Charts Contained in Tech Specs & Resumes of Individuals Holding Positions Shown in Organization Charts,Per NRC Telcon Request)
  • ML19283B787  + (Forwards Proposed Changes to Operating License NPF-2 Tech Specs Involving Overpressurization Mitigating Sys Spec.Ser Supporting Change Encl)
  • ML20069D148  + (Forwards Proposed Changes to Operational QA Plan, Rev 17. Rev 18 to Operational QA Plan, Which Includes Proposed Changes Also Encl)
  • ML20090L809  + (Forwards Proposed Changes to Operator Requalification Program.Records of Requalification Program Will Be Maintained by Training Supervisor)
  • ML20045G767  + (Forwards Proposed Changes to Organizational Conflicts of Interest Contract Clause)
  • ML20081E176  + (Forwards Proposed Changes to PANTHERS-IC Test Matrix)
  • ML20101D801  + (Forwards Proposed Changes to PBAPS NPDES Permit PA0009733)
  • ML20079B242  + (Forwards Proposed Changes to Part a of ODCM for NRC Review & Approval.Changes to Part B of ODCM Will Be Submitted W/ Annual Radioactive Effluent Release Rept in Accordance W/Ts 6.13.2b)
  • ML20205N189  + (Forwards Proposed Changes to Parts A,C,D & E of State of Maine Rules Re Radiation Protection.Informs That Public Hearing for Rulemaking Proposal Will Be Held on 990224 & That Comment Period Will Expire on 990310)
  • ML20214V239  + (Forwards Proposed Changes to Physical Security Plan & Proposed Schedule for Implementation of Changes,Per 10CFR73.55.Encls Withheld)
  • ML20247F479  + (Forwards Proposed Changes to Physical Security Plan Re Communications & Emergency Power.Encl Withheld)
  • RBG-24865, Forwards Proposed Changes to Physical Security Plan.Changes Described in Rev 9 Not Implemented,Pending Approval by Commission.Changes Withheld (Ref 10CFR73.21)  + (Forwards Proposed Changes to Physical Security Plan.Changes Described in Rev 9 Not Implemented,Pending Approval by Commission.Changes Withheld (Ref 10CFR73.21))
  • DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld  + (Forwards Proposed Changes to Physical Security Plan.Encl Withheld)
  • ML19354D869  + (Forwards Proposed Changes to Physical Security Plan Re Vital Areas & Vital Area Control in Addition to Communications & Emergency Power.Changes & Other Corrections & Clarifications Will Be Included in Rev 7.Encls Withheld)
  • ML20215M584  + (Forwards Proposed Changes to Plant NPDES Permit,Per Section 3.2 of App B to License DPR-20.Change Will Reduce Cooling Water Temp to Condenser,Resulting in Greater Turbine Generator Efficiency)
  • ML20054F418  + (Forwards Proposed Changes to Proof & Review Copy of Tech Specs 3.6.1.7 & 4.6.1.7 Re Containment Ventilation Sys, Tables 4.3-9 & 3.8-1 & Figure 5.1-3)
  • ML20083Q018  + (Forwards Proposed Changes to Proof & Review Tech Specs,Per Telcon Re Radiation Monitoring Instrumentation & Radioactive Liquid Effluent monitoring.Marked-up Tech Specs Encl)
  • ML20084L257  + (Forwards Proposed Changes to Proof & Review Tech Specs Re Reactor Trip Sys Instrumentation Trip Setpoints & ESF Actuation Sys.Changes Reflect New Info Not Contained in Tech Specs)
  • ML18101A248  + (Forwards Proposed Changes to QA Program for Hope Creek & Salem Generating Stations,Revising Responsibility of Manager - QA Programs & Audits)
  • NRC-91-0088, Forwards Proposed Changes to QA Program Re Assignment of Responsibilities for Procurement Document Review & Receiving Insp.Review/Insp Functions Can Be Effectively Performed W/O in-line QA Functions  + (Forwards Proposed Changes to QA Program Re Assignment of Responsibilities for Procurement Document Review & Receiving Insp.Review/Insp Functions Can Be Effectively Performed W/O in-line QA Functions)
  • BECO-92-067, Forwards Proposed Changes to QA Program to Eliminate Requirements Contained in QA Manual Re Involvement of QA Dept as Line Function Review  + (Forwards Proposed Changes to QA Program to Eliminate Requirements Contained in QA Manual Re Involvement of QA Dept as Line Function Review)
  • ML20058F998  + (Forwards Proposed Changes to QA Program Description,Per 10CFR50.54(a)(3).Exception to Previously Stated Position on Reg Guide 1.88 Requested to Allow Temporary Storage of QA Records in 1 H Fire Rated Container)
  • ML20141D513  + (Forwards Proposed Changes to QA Program Description, Reducing Commitments to Allow 15-day Time Period for Deficiency Rept Resolution & QA Manager to Refer to Vice President If Acceptable Resolution Not Obtained)
  • ML20147E394  + (Forwards Proposed Changes to QA Topical Rept CPC-2A, Authorizing Extension of Enhanced Performance Incentive Program & Independent Audits of QA Organization,For Review & Approval.Fee Paid)
  • ML20217G884  + (Forwards Proposed Changes to QATR CE 1-A,rev 66.Change Constitutes Major Programmatic Rev to Onsite & Offsite Review Processes as Presently Described in Rept)
  • ML20237D977  + (Forwards Proposed Changes to Quality Assurance Topical Rept (QATR) CE-1-A,rev 66,modifying Ref Submittal & Clarifying Certain Changes to QATR Proposed in Util .Page A-1, 6 of 6 of Incoming Submittal Not Included)
  • ML20031F733  + (Forwards Proposed Changes to Radiological & Environ Sections of 810915 Draft Tech Specs)
  • ML20113G646  + (Forwards Proposed Changes to Rev 1 to Inservice Test Program Per Sser 6,App S.Changes Correct Discrepancy W/Certain Solenoid Valve Remote Position Indicating Lights Utilized When Performing Valve Exercise & Stroke Time Testing)
  • L-88-174, Forwards Proposed Changes to Rev 12 to Physical Security Plan Re Miscellaneous Amends & Search Requirements.Changes Withheld (Ref 10CFR73.21)  + (Forwards Proposed Changes to Rev 12 to Physical Security Plan Re Miscellaneous Amends & Search Requirements.Changes Withheld (Ref 10CFR73.21))
  • ML20046C159  + (Forwards Proposed Changes to Rev 16 of Operational QA Plan. Changes Will Not Be Implemented Until Region III Reviewed & Approved Changes)
  • ML20049J898  + (Forwards Proposed Changes to SAR Per Application to Renew License R-66)
  • ML20247B339  + (Forwards Proposed Changes to SAR Update Re 971031 Certificate Amend Request,For Review & Approval)
  • ML20043B668  + (Forwards Proposed Changes to SER Re Hot Shutdown Repairs in Event of Fire,Per 10CFR50,App R Section Iii.G Covering Spurious Operations & High Impedance Faults & Electrical Isolation Deficiency)
  • ML20197H837  + (Forwards Proposed Changes to SPDES Permit NY001015,submitted to Ny State Dept of Environ Conservation by Licensee)
  • ML20035A281  + (Forwards Proposed Changes to SSAR Sections 1.8,3.8 & 3.9 Which Adress Open Item 14.1.3.8-1 Pertaining to Welding. Changes Reviewed by D Terao During ITAAC Review Meeting in San Jose,Ca from 930111-20)
  • ML19351F791  + (Forwards Proposed Changes to STS Covering Batteries)
  • ML18024A617  + (Forwards Proposed Changes to Section 2.1 Thermal Discharge Limits of Tech Specs App B to Licenses DPR-33,DPR-52 & DPR-68.W/encl Changes,Justification & Assessment of Water Temp Monitoring at Browns Ferry)
  • ML18024A619  + (Forwards Proposed Changes to Section 2.1 Thermal Discharge Limits of Tech Specs App B to Licenses DPR-33,DPR-52 & DPR-68.W/encl Changes,Justification & Assessment of Water Temp Monitoring at Browns Ferry.)
  • ML20128M138  + (Forwards Proposed Changes to Section 3.2 of Rev a to 23A6100AE,addressing Issue of Main Steam Line Leakage Path & Seismic Classification)
  • AECM-81-424, Forwards Proposed Changes to Section 9.2.1.3 & App 3A of Fsar.Info Represents Clarifications of UHS Performance Analysis & Makeup Capability Beyond 30 Days.Changes Will Be Incorporated in Next Amend  + (Forwards Proposed Changes to Section 9.2.1.3 & App 3A of Fsar.Info Represents Clarifications of UHS Performance Analysis & Makeup Capability Beyond 30 Days.Changes Will Be Incorporated in Next Amend)
  • ML20199E972  + (Forwards Proposed Changes to Security Plan for Quad Cities Nuclear Power Station,Units 1 & 2.Attachment a Gives Description & Safety Analysis of Proposed Changes.Encls Withheld,Per 10CFR73.21(c))
  • ML20003A712  + (Forwards Proposed Changes to Security Plan Vital Area Analysis.Encl Withheld (10CFR2.790))
  • ML20064N516  + (Forwards Proposed Changes to Security Plans.Changes Withheld (Ref 10CFR73.21))