Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039H282 + (Forwards Partial Document Re B-SAR-205,seismic & Quality Group Classifications)
- ML20039H285 + (Forwards Partial Document Re Environ Qualification Program)
- ML20205B211 + (Forwards Partial Draft of Sandia Document, Numerical Modeling of Groundwater Flow Sys at Location,Hanford Site, Wa, Re Data Base for Conceptual Models to Be Analyzed in Modeling Study.Comments Requested by 850819.W/o Encl)
- ML20128H773 + (Forwards Partial Exemption from Requirements of 10CFR50.54(a) & Environ Assessment,Per 830411 Request)
- ML20128H778 + (Forwards Partial Exemption from Requirements of 10CFR50.54(a) & Environ Assessment,Per 830411 Request)
- ML17347A646 + (Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies)
- L-87-500, Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies + (Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies)
- ML20149H443 + (Forwards Partial Initial Decision on Remanded Issue of Dieckamp Mailgram for Transmittal to H Myers.W/O Encl)
- ML19267A290 + (Forwards Partial Initial Decision,Amend 35 to License NPF-1 & Notice of Issuance)
- ML20054C365 + (Forwards Partial Interpretation of Portions of Seismic Reflection Profiles Produced by Rockwell Intl within 5 Miles of Site.Seismic Reflection Data Interpretation Will Be Resumed Following Improvement of Rockwell Intl Data)
- ML20217K313 + (Forwards Partial List of Attendees & Handouts Provided During Conference on 970620.Decision Re EA Forthcoming by Separate Correspondence)
- ML20029A405 + (Forwards Partial List of Cycle 4 Refueling Outage Accomplishments Relevant to Issues Tracked by NRC Re Generic Ltr 89-06 & Various Tech Spec Changes)
- ML19319D306 + (Forwards Partial List of Items to Be Completed Prior to Licensing & Initial Criticality.Mar 1976 Fuel Loading Date Optimistic & Slippage of One Month Estimated)
- ML20136E812 + (Forwards Partial List of Questions from J Lazevnick, Electrical Reviewer for Chapter 8 of Fsar.Remaining Questions Will Be Completed by 840415)
- ML20041B275 + (Forwards Partial List of Responses to Request for Addl Info Re WCAP-9561, Bart A1:Computer Code for Best Estimate Analysis of Reflood Transients)
- ML19339D038 + (Forwards Partial List of safety-related Equipment Scheduled For,Or Undergoing,Environ Qualification.Info Suppls Applicant 801031 Response to NRC)
- ML20205R923 + (Forwards Partial Listing mark-up of Completion Dates & Projected Completion Dates for multi-plant Action Items,Per H Abelson 860501 Request.Nrc Project Manager Assistance Requested for Some Items.Updated List Expected by 860901)
- ML20154B496 + (Forwards Partial Listing of Licensed Reactors Which Provide Neutron Activation Svcs,Per Request.More Complete Listing May Be Available at Natl Organization of Test,Research & Training Reactors)
- ML19317E501 + (Forwards Partial Loop ECCS Analysis, as Suppl to 750709 Submittal Per B&W rept,BAW-10103.Results Show That Peak Cladding Temps for Partial Loop Operation Significantly Below four-pump,full Power Operation Results of B&W Rept)
- ML19317E502 + (Forwards Partial Loop ECCS Analysis, as Suppl to 750709 Submittal Per B&W rept,BAW-10103.Results Show That Peak Cladding Temps for Partial Loop Operation Significantly Below four-pump,full Power Operation Results of B&W Rept)
- ML20126J948 + (Forwards Partial Ltr Commenting on Proposed Rule 10CFR30,32, 70 & 150 Re Use of Contaminated Metals in Consumer Products. Requests Necessary Info for Reply)
- ML19347B687 + (Forwards Partial Modified Fundamental Nuclear Matl Control Plan,Applicable to Decommissioning Efforts.Submittal Will Be Completed Wk of 800901.License Fee Not Required Because Nuclear Matl Control Program Effectiveness Not Decreased)
- ML20197J544 + (Forwards Partial Preliminary Draft of Section 4.0,route Characteristics,Of What Will Become Final Rept in NRC Project Titled, Revalidation of NUREG-0170 Spent Fuel Shipment Risk Estimates Program, (Jcn J5160))
- ML17193A750 + (Forwards Partial Proposed Findings of Fact.Findings Do Not Address Issue of Fuel Channel Bowing,Aslb 810126 Question 2 & Applicant Commitment to Dummy Fuel Assembly Testing.Proposed Order & Conclusions of Law Not Included)
- ML20077H985 + (Forwards Partial Proposed Findings of Fact & Conclusions of Law on Contention 1A,QA/QC)
- ML20148R024 + (Forwards Partial QA Program,Per Telcon)
- ML20053D303 + (Forwards Partial Rescission of 810309 Order Confirming Licensee Actions to Upgrade Facility Performance,Revising Work Hour Restrictions)
- ML20039A996 + (Forwards Partial Rescission of 810722 Order to Show Cause, Replacing 811009 Order)
- ML20052F267 + (Forwards Partial Rescission of Order,Revising IE Director 810309 Order Confirming Licensee Actions to Upgrade Facility Performance)
- ML20031G604 + (Forwards Partial Rescission of Order,Temporarily Lifing Suspension of General License to Use Cask Model NFS-4)
- ML19339C419 + (Forwards Partial Response Re Controls for Handling of Heavy Loads Near Spent Fuel,Per NRC .Second Rept Not Due for Another Three Months.Oversize Drawings Encl)
- ML20039C282 + (Forwards Partial Response to 810511 Request for Addl Info Re Instrument & Control Sys.Remaining Questions Will Be Discussed During Wk of 811214 Meeting W/Instrument & Controls Branch)
- ML20052E937 + (Forwards Partial Response to 820308 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design, Per 820426 Telcon.Remaining Info Will Be Provided at 820524 Meeting in Gaithersburg,Md)
- ML13317A124 + (Forwards Partial Response to 820315 Request for Addl Info Re Pressurized Thermal Shock Issue.Other Responses to Be Included in Westinghouse Owners Group Submittals on 820528 & in June 1982)
- ML20080A622 + (Forwards Partial Response to 831230 Request for Info Re Radwaste Disposal Methods,Per Reg Guide 1.86.Outer 1/2 to 3/4 Inch of Radwaste Bldg Walls Will Be Spalled & Removed for Shipment as Radwaste Per ALARA Principle)
- ML20084R850 + (Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 1984)
- ML20091J927 + (Forwards Partial Response to 840523 Tracked Action Item 085 Re Module 120D)
- ML20138A773 + (Forwards Partial Response to 850607 Request for Addl Info Re NUREG-0737,Item II.D.1.Safety Valves Removed from Original Location in Valve Room to Direct Mount on Pressurizer Nozzles)
- ML20137Q253 + (Forwards Partial Response to 850802 Request 1 for Addl Info Re AECC-3-P(NP).Company Engaged in Listed Activities, Including Startup of Bryon Nuclear Station Vol Reduction Sys,Causing Delay in Complete Response Until Oct 1985)
- ML20198R832 + (Forwards Partial Response to 860214 Request for Addl Info Re Proposed App J Tech Specs.Full Response Will Be Submitted 90 Days from Startup from Extended 1985/1986 Pipe Replacement Outage)
- ML18031A522 + (Forwards Partial Response to 860430 Request for Implementation Status & Dates of Numerous Issues & multi- Plant Action Items Applicable to Facility.Addl Response Will Be Provided Upon Clarification of Issues)
- ML18149A174 + (Forwards Partial Response to 860430 Request for Status of Implementation of Generic Issues.Completed List Will Be Provided by 860815)
- ML20203L146 + (Forwards Partial Response to 860618 Request for Addl Info on Conformance to Reg Guide 1.97.Remaining Info Will Be Provided by 861031)
- L-87-422, Forwards Partial Response to 870820 Request for Addl Info Re 870612 Application for Amend to License DPR-67,authorizing Replacement of Spent Fuel Pool Racks.W/Nine Proprietary Oversize Drawings.Encls Withheld + (Forwards Partial Response to 870820 Request for Addl Info Re 870612 Application for Amend to License DPR-67,authorizing Replacement of Spent Fuel Pool Racks.W/Nine Proprietary Oversize Drawings.Encls Withheld)
- ML20248L401 + (Forwards Partial Response to 980211 RAI to Complete Review of License Amend Request.Response to Question 6 Is Under Development)
- ML20209F176 + (Forwards Partial Response to 981020 RAI Re GE Nuclear Test Reactor Sar.Reply to Each Question Follows Italicized Restatement of Question/Comment.Remaining Unanswered Questions Will Be Addressed in Later Submittal)
- ML20080N322 + (Forwards Partial Response to Const Implementation Overview Weekly Rept 4.Development of Commitment Mgt Sys Currently in Initiation Stages & Will Be Completed in 8 to 12 Months. Project Manpower Requirements Listed)
- ML20065L901 + (Forwards Partial Response to Containment Sys & Severe Accident Branch Request for Addl Info Re Request for Exemption from 10CFR50,App J)
- ML17221A382 + (Forwards Partial Response to Eg Tourigny 870716 Request for Addl Info Re 870612 Application for Amend to License Re Replacement of Spent Fuel Pool Racks to Ensure That Adequate Future Capacity Exists for Storage of Spent Fuel)
- L-87-374, Forwards Partial Response to Eg Tourigny 870716 Request for Addl Info Re 870612 Application for Amend to License Re Replacement of Spent Fuel Pool Racks to Ensure That Adequate Future Capacity Exists for Storage of Spent Fuel + (Forwards Partial Response to Eg Tourigny 870716 Request for Addl Info Re 870612 Application for Amend to License Re Replacement of Spent Fuel Pool Racks to Ensure That Adequate Future Capacity Exists for Storage of Spent Fuel)
- ML20206N692 + (Forwards Partial Response to FOIA Request for Documents Re Plant.App Q Documents Available in PDR)