Forwards Partial List of safety-related Equipment Scheduled For,Or Undergoing,Environ Qualification.Info Suppls Applicant 801031 Response to NRC
ML19339D038
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 02/04/1981
From: Wuller G
ILLINOIS POWER CO.
To:
Office of Nuclear Reactor Regulation
References
L30-81(2-4)-6, U-0217, U-217, NUDOCS 8102170094
Download: ML19339D038 (4)


Text

,s ILLINDIS POWER COMPANY 1 73 (92_9gy_g 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 February 4, 1981

,__~n-ym 7,,,,.

Branch Chieff MS.TJames R; Miller,'Special Projects Branch Standardization and

~

Division of Licensing Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Miller:

Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits Nos. CPPR-137 & CPPR-138 This letter amplifies Illinois Power Company's letter U-0196 of October 31, 1980, which was a preliminary responsa to Mr.

Eisenhut's letter of October 1, 1980 regarding Environmental Qualification of Safety Related Equipment.

It also provides information requested by Mr. Rutherford of your office in recent telephone conversations.

The enclosure to this letter represents a partial listing of Clinton equipment for which environmental testing is scheduled or in progress.

Supplements to this listing will be forwarded as additional testing schedule information becomes available.

Please contact Mr. J. F. Hampton (217-424-7008) to ascertain details on time and location of specific tests, or other matters related to equipment qualification testing.

Sincerely,

/

/

G. E. Wuller Supervisor - Licensing Nuclear Station Engineering JFH/em 00/

Enclosure cc:

C.

I. Grimes, NRC Clinton Proj ect Manager 5

H.lR. Livermore, NRC Resident Inspector I l 810 217 0 DN A

Clinton Equipment Components /

Specification Name MFGR Model No.

Testing / Qualification Status s

K-2911 HVAC Controls &

On/off control-48 Testing in Progress; Scheduled (MCCLPowers)

Instrumentation ler-(Love completion November 1981 Controls)

DP Transmitter (Hays Republic)

Reset Timer llP57A601 (Eagle)

Temperature Con-C302PG-103 troller (UE)

Control Relay GPIGllf (AGASTAT)

Control Relay 12ilMA11Bil (GE) 12HGA51A4911 Time Delay Relay 7014AD (AGASTAT)

Alarm Timer W221-20-243 (TRANSMATION)

Temp Controller 54 (Love Controls)

Pilot Light ET-16 (GE)

Solenoid Valve HBX8320B174 K-2928 Area Radiation (Eberline)

Testing in Progress; Scheduled (Eberline)

Monitoring Radiation Detector DAl-611T-CC completion Mid April 1981 Equipment IB-411T-CClSA-11 Data Acquisition Module DAM-1 Communications Line Isolator CL-1

_ _ _ _. Clinton Equipment Components /

Specification Name MFGR Model No.

Testing / Qualification Status

/

K-2978 Electrical (CONAX)

(CONAX)

Penetrations Medium Voltage C-MUP Testing in Progress; Scheduled Power Penetration 7-55100 completion 17 June 1981 Low Voltage C-C/I Scheduled Completion C&I Penetration 7-55100 11 May 1981 K-2863 (Spencer Hydrogen Compres-60 HP Motor Frame 40573 Testing Starts 2 Feb 81, Complete Turbine) sors (Reliance) 460V, 3600 by 1 July 81 Various control RPM components K-2862 (Rock-well Inter-Hydrogen 7.5 HP Motor Frame 254TCZ Start Date Pending Resolution of national)

Recombiners (Reliance)

Type PA TMI Action Plan Item 460V, 3535 RPM K-2861 Division I, II, Not fully deter-Testing to start at Southwest (Steuart &

III - Emergency mined; may include:

Research approximately June 1981; Stevenson)

Diesel Generators 125V(DC) Soakback detailed procedures under pump motor (EMD) 8455815 development Free Wheeling Rec-tifier (Motorola) 1N1198 Current Boost Tran-sformer (Basler)

BE02463-001 Turbo Soakback Fuse i

(Bussman)

FRN-10 J.

Governor Fuse j

-(Bussman)

NON-10 125V(DC) Motor Starter (ITE)

P202C121 Phase Shift Trans-former (GE) 700X8461 Air Start Switch (Square D) 9012iACW-9 Governor Adjust i

Switch (GE) 10AA065 4160/240V Power-Transformers (Basler)

BE-13487-001 t

D

_ ~ - - -.

. - ~. -. - -. - - - -

i' i Clinton Equipment-Components /

l Specification Name MFGR Model No.

Testing / Qualification Status 120V-5A Reverse Power Relay (GE) 12GGP53BlA Various control relays (P&B)

MDR137-8 (GE) 121AVSlDlA (GE) 12CEH51A1A Various regula-ting Switches (GE)

CR2940WA202E CR2940UB203A (EMD) 8358930 8475932 8447100 4

K-2900'(Ameri-Package Filter Pressure can Air Filter)

Units Transmitters (Rosemount) 1153 Qualification Plan under Review.

Test schedule not yet submitted.

Fire Detection 4

System (KIDDE)

Series 100 Resistance Bulb Alarm (Moore) RBA-3W-25 0X2X3/117/-EZ 103-DPDT-ID(AB) lleaters (INDEECO)

I

. _..