Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19206A111 + (Forwards First Round Questions for FSAR)
- ML19220C760 + (Forwards First Round Questions from Accident Analysis Branch to Complete Facility Review.Provisions for Adequate Protection Against Chlorine Release Encl)
- ML19220A721 + (Forwards First Round Questions from Reactor Sys Branch Re Shutdown Sys Design)
- ML19220B235 + (Forwards First Round Questions of Reactor Physics Section of Core Performance Branch Re FSAR Chapters 4,14 & 15)
- ML17320A972 + (Forwards First Round Questions on Exxon Plant Transient Code,Based on Review of Proprietary Rept, Description of Exxon Nuclear Plant Transient Simulation Model for Pwrs)
- ML17320A974 + (Forwards First Round Questions on Exxon Methodology Rept for PTSPWR2.Rept Lacks Specific Details Re Biases in Initial Conditions & Boundary Conditions)
- ML17320A973 + (Forwards First Round Questions on Mods to Exxon Draft Repts, PTSPWR2 Mods for St Lucie Unit 1 & Description of Exxon Plant Transient Simulation Model for Pwrs)
- ML19323F851 + (Forwards First Round Questions on OL Application Re Training & Qualification.Response Required within 30 Days.Encl Withheld (Ref 10CFR2.790))
- ML19319B893 + (Forwards First Round Questions on Seismology from Site Analysis Branch.W/O Encl)
- ML17272A378 + (Forwards First Round Request for Addl Info Re Facility OL Application from Plant Sys,Power Sys,Analysis,Structural Engineering & Operator Licensing Branches)
- ML17272A379 + (Forwards First Round Request for Addl Info Re Facility OL Application from Matls Engineering,Reactor Sys & QA Branches)
- ML20198F607 + (Forwards First Round Requests for Addl Info Re Portions of C-E Safety Analysis Rept for Which Auxiliary & Power Conversion Sys Branch Responsible)
- ML19220B029 + (Forwards First Round Requests for Addl Info Re Potential Addl Energy Release from Steam Generators After Core Reflood & ECCS Evaluation)
- ML19276F513 + (Forwards First Round Requests for Addl Info.Requests Response as FSAR Amend by 790622 to Maintain Review Schedule)
- ML19256B200 + (Forwards First Round Requests for Addl Info Subsequent to Review of Fsar.Requests That FSAR Be Amended to Include Responses to Questions)
- ML19261A744 + (Forwards First Round Requests for Addl Info as a Result of Review of Fsar.Requests Util Amend FSAR to Reflect Responses by 790504)
- ML19261B365 + (Forwards First Round Requests for Addl Info as Result of Review of Fsar. Requests Util Amend FSAR to Reflect Responses by 790504)
- ML20040A359 + (Forwards First Round Review Comments on B-SAR-205 Chapter 15.0.Observations Will Be Forwarded to Cognizant Branches for Resolution)
- ML20198F322 + (Forwards First Round Review of PSAR)
- ML20205T098 + (Forwards First Round Special Team Insp Rept 50-298/86-28 on 861103-07.Nine Deficiencies Re Program Implementation, Involving Equipment Qualification Documentation Files Noted in Encl Notice of Potential Enforcement/Unresolved Items)
- ML20084K485 + (Forwards First Round of Discovery in Form of Request for Production of Documents & First Set of Interrogatories. Related Correspondence)
- ML20059A204 + (Forwards First Semiannual fitness-for-duty Rept from 900103- 0630.Util Pleased W/Program,However,Concerned About Incorrect Test Results for Blind Performance Specimens Received from Roche Labs)
- PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements + (Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements)
- ML20029B994 + (Forwards First Set of Below Regulatory Concern Steering Committee Approved Slides & Questions & Answers,For Info)
- ML20011A669 + (Forwards First Set of Discovery Documents.Documents Are Incomplete Due to Time Limits.W/O Encl)
- ML19309C109 + (Forwards First Set of Interrogatories)
- ML20132C644 + (Forwards First Set of Interrogatories & Request for Production of Documents to Tdi.Proposes Arrangements Re Svc of All Case Papers to B Smith,I Millstein & J Quinn)
- ML20132C647 + (Forwards First Set of Interrogatories & Request for Production of Documents to Tdi.Proposes Arrangements Re Svc of All Case Papers to B Smith,I Millstein & J Quinn)
- ML20052D212 + (Forwards First Set of Interrogatories & Request for Production of Documents Directed to Utils,Per ASLB 820423 Memorandum & Order.Addl Interrogatories Forthcoming.Related Correspondence)
- ML20106F410 + (Forwards First Set of Interrogatories & Requests to Produce.Related Correspondence)
- ML20210N471 + (Forwards First Set of Interrogatories to Seacoast Anti-Pollution League & Towns of Hampton,Rye,Kensington, Hampton Falls & South Hampton.Related Correspondence)
- ML19224A658 + (Forwards First Set of Interrogatories to Util from Ny St Dept of Environ Conservation)
- ML19224A664 + (Forwards First Set of Interrogatories to Util from Ny St Dept of Environ Conservation)
- ML20198F569 + (Forwards First Set of Questions & Positions Prepared by Electrical,Instrumentation & Control Sys Branch for Transmittal to Util)
- ML19220A732 + (Forwards First Set of Questions by Electrical, Instrumentation & Control Sys Branch.Review Required Re Seismic & Environ Qualification of Safety Equipment)
- ML17222A726 + (Forwards First Set of Responses to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Per Phased Schedule Noted in Util)
- ML20213C847 + (Forwards First Set of Round 1 Questions Re Plant Reviews, Based on Evaluation of FSAR Info.Remaining Set of Questions to Be Sent by 790220)
- ML20080R548 + (Forwards First Simulator Certification Quadrennial Rept for Use of Lgs,Units 1 & 2,plant-ref Simulator for Licensed Operator Exams.Rept Tabulates Testing Performed on Simulator Since Initial Certification Submitted on 910131)
- ML20080R549 + (Forwards First Simulator Certification Quadrennial Rept for Use of Pbaps,Units 2 & 3,plant-ref Simulator for Licensed Operator Exams.Rept Tabulates Performance Testing on Simulator Since Initial Certification Submitted on 910208)
- ML20136B339 + (Forwards First Six Allegations Re Protective Coatings at Facility.Written Response by Util Should Be Available During 840130 Site Visit)
- ML20071N825 + (Forwards First Status Rept Re Procurement & Installation of Replica Simulator for TMI-1,per Requirements of Paragraph 583 (5) of 810827 Mgt Pid.Next Status Rept Will Be Provided in Oct 1983)
- ML19323H708 + (Forwards First Stipulation Re Shoreham Opponents Coalition Contentions & Request for Addl Time)
- RC-93-0117, Forwards First Submittal of SA Results to Support Replacement SG TS Changes... & Nonproprietary WCAP-13694 & Proprietary WCAP-13605, Primary Loop Leak-Before-Break..., Per 920109 Meeting W/Nrc.Proprietary WCAP-13605 Withheld + (Forwards First Submittal of SA Results to Support Replacement SG TS Changes... & Nonproprietary WCAP-13694 & Proprietary WCAP-13605, Primary Loop Leak-Before-Break..., Per 920109 Meeting W/Nrc.Proprietary WCAP-13605 Withheld)
- ML20031D747 + (Forwards First Suppl to Facility Ser.W/O Encl)
- ELV-01054, Forwards First Suppl to Summary Rept of Startup Test Program,Submitted by + (Forwards First Suppl to Summary Rept of Startup Test Program,Submitted by)
- ML20140D599 + (Forwards First Supplemental Monthly Rept of Radiation Protection Oversight Committee Covering Activities During Month of Sept 1985,including Findings & Recommendations. Radiographic Training Completed on 851108)
- ML20099D238 + (Forwards First Supplemental Response to Prairie Alliance First Round of Discovery & Third Supplemental Response to State of Il First & Second Set of Interrogatories.Related Correspondence)
- ML20128G970 + (Forwards First Supplemental Response to Intervenor Third Set of Interrogatories & Request for Production.Documents Encl But Will Not Be Served on Other Persons on Svc List. W/Certificate of Svc.Related Correspondence)
- ML20128G972 + (Forwards First Supplemental Response to Intervenor Third Set of Interrogatories & Request for Production.Documents Encl But Will Not Be Served on Other Persons on Svc List. W/Certificate of Svc.Related Correspondence)
- ML20045D062 + (Forwards First Surveillance Rept of Bonus Plant,Per Article 8 of Contract AT-(40-1)-4186)
- ML20037A899 + (Forwards First Two Items Requested 620809 & OL App B. Revised App a to OL Will Be Sent When Available.W/O Encl)