ML19319B893
| ML19319B893 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/06/1973 |
| From: | Harold Denton US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001290618 | |
| Download: ML19319B893 (1) | |
Text
JUL 6 573 Richard C.
DeYoung, Assistant Director for PWR's, L SEISMOLOCY QU6STIONS PL AN T N AME :
Davis-Besse Nuclear Power Station LICENSING STAGE:
OL DOCEET NUM3ER:
50-346 RESPONSI3LE 3 RANCH:
PWR #4 REQUESTED COMPLETION DATE:
Jely 6, 1973 APPLICANTS RESPONSE DATE NECESSARY FOR NEXT ACTION PLANNED ON PROJECT:
October 12, 1973 DESCRIPTION OF RESPONSE:
Responses to Q-1 Questions REVIEW STATUS:
Site Analysis 3 ranch (Seismology) -
Awaiting Information Enclosed are the seismology question.e prepared by Seth M.
Coplan for your transmittal to the applicant.
Please note that inadequate responses to questions 2 and 3 would staff position requiri22 a higher value for result in a the Safe Shutdown Earthquake than that proposed by the applicant.
Harold R.
Denton, Assistant Director for Site Safety Directorate of Licensing
Enclosure:
DISTRI3CTION:
As stated L: Docket File L:RDG cc:
w/o anclosure g ggg A.
Cianbusso L:AD/SS h/. M.-Donald q, q)
D D
cc:
w/ enclosure S.
H.
Hanauer OT~[~I{
J.
M.
Hendrie L. Shao l
's A.
Schwancer I.
Peltier A.
Cardone S.
Coplan L:SAB 36 L:SAB L SAB L:AD/SS omca >
...........i;p W vam HRDenton SCoplan: bas CStepp j
7 p
oart >
.1./.512.3..
..m.71 4.ll3..
.lL.4..D 3 7/ 6 /73 Poem AEC-519 tRev,9 33) AECM 0240 e*e ma-iewisss-t us-en