Forwards First Simulator Certification Quadrennial Rept for Use of Pbaps,Units 2 & 3,plant-ref Simulator for Licensed Operator Exams.Rept Tabulates Performance Testing on Simulator Since Initial Certification Submitted on 910208
ML20080R549
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/27/1995
From: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503090363
Download: ML20080R549 (75)


Text

{{#Wiki_filter:.. 'b 7[p' 1CCit-95-14009' o.,.w n. % ' Vice President - ). Psach Bottom Atomic Power Station ( ,;s: 1/ { ^- ^ =y-PECO ENERGYr go ;"T "*P"v n J $1 Delta, PA 17314-9739 h[ 717 456 7014 i s License Nos. DPR44 License Nos. ' DPR-56 7 i p January 27,1995. ?' Facility Docket Nos. 50-277.. '50-278. i 10CFR55.45(b)(5)(iQ f Mr. William Russell, Director I Office of Nuclear Reactor Regulation 4 United States Nuclear Regulatory Commission Washington, D.C. 20555 I

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of First Simulator Certification Quadrennial Report t

Dear Mr. Russell:

This report is submitted in accordance with the requirements set forth in 10CFR 55.45 (b)'(5)'(iQ, { E: for the use of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, plant referenced simulator for licensed operator examinations. The report tabulates the performance testing performed on the simulator since initial j L certification, which was submitted on February 8,1991. The report tabulations include the test - number, title, status, dates whch the tests were performed, and a work order history of discrepancies against the tests. There are presently a total of eleven unsatisfactory malfunction tests and one unsatisfactory steady state test.' None of the unsatisfactory tests represent a significant impact on the ability to meet training objectives. Simulator work orders are generated against all unsatisfactory tests. The work orders are prioritized based on their impact on training and will be resolved in a timely manner, based on their relative priority with other simulator work activities, including modifications and other discrepancies unrelated to performance tests. This report also includes the simulator performance test schedules for the next four years in j accordance with the above mentioned reference. These schedules include additional tests l' beyond those listed in the initial certification due to the collection of additional plant specific data. Although not required by 10CFH55.45, a Form NRC474 and an updated list of simulator exceptions to ANSI /ANS 3.5-1985 for Units 2 and 3 is also included. Several exceptions have been resolved, and a few have been added since initial certification. None of the newly identified exceptions result in a significant impact on training. D 0S0014 5 9503090363 950127 PDR ADOCK 05000277 g\\ R PDR g. \\

g: .P January 27,1995 Page 2 ,'O if you have any questions, or require additional information, please do not hesitate to contact Mr. ' .i John Stankiewicz, Director of Trainng, Peach Bottom Atomic Power Station at (717) 456-3039. Very truly yours, Gerald R. Rainey Vice President, PBAPS GRR/JJS/JAJ:cig Enclosure cc: T. T, Martin, US NRC, Administrator, Region l W. L Schmidt, US NRC, Senior Resdent inspector 4 O a d' 4 + 4 i l i O 1 .I

UA NUCLEAR RECULAToRY CoMMISSloN APPROVED BY OMS: NO. 315o.0135 NRC PORM die EXPIRES: MD42 (1401 0 CF,165.asl4 ESTIMATED SURDEN PER RESPONSE T3 COMPLY t"fTH TH3 954 ane 553 INFORMATION COLLECTION REQUEST: 120 HRS. FORWARD SIMULATION FACILITY CERTIFICATION =; '"i' a a; = M g'; 3,g ;"=,,';;;st ON O U.S. NUCLEAR REGULATORY COMMIS$50N, WASHINGTON, DC 20565, AND TO THE PAPERWORK REDUCTION PROJECT (3150w c138). OPPICE OF MANAGEMENT ANO SUDGET, WASHINGTON, J oc nous-4 I. 7 Instructions. This form is to be flied for initial certification, r certification (if required), and for any change to a simuistion f acinty performance submittal of such a plan. Provide the following information, and check the appropriate box to indscate reason for submittal. l DOCKET NUMBER FACILITY Peach Bottom Atomic Power Station Unit 2 s>277 1/27/95 PECO Energy Company This is to certify thet: The above named facility licensee is using a simulation facility consisting solely of a plant referenced simu!stor that meets the requirements of 10 CF R 55.45. 1. occumentation is available for NRC review in accordance with 10 CF R 55.45(b). 2. This simulation facility meets the guidance contained in ANbl/ANS 3.5,1985, as endorsed by NRC Regulatory Guide 1.149. { 3. if there are any exceptions to the certification of this item, check here ()() and describe fully on addstional pages as necessary. .s 1 NAME (or otherMentification) AND LOCATION OF SIMULATION FACILITY d Peach Bottom Atomic Power Station, Unit 2 Simulator .j Peach Bottom Atomic Power Station, R.D. #1, Box 208, Delta, PA 17314 SIMULATION F ACILITY PERFORMANCE TEST ABSTRACTS ATTACHED. (Forperformance tests conducted in the period ending with the dare of this cer I, X DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Artach additionalpege(s) ne neceasury, andidentify the item den:ription being continued) 1 Exhibits 2 and 3, attached,' summarize the performance testing completed since the initial certification of the PBAPS Unit 2 simulator in February 1991. These test reports document the simulator facility performance as it relates to the reference plant in accordance with ANSI /ANS 3.5-1985. An updated list of Unit 2 simulator exceptions to ANSI /ANS 3.5-1985 is provided in Exhibit 1, attached. SIMULATION F ACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approsanarely 25S otp.fu..,ws rears per heer for the louryear E period commencing wth the dere of this certification.) ESCRIPTioN oF PE RFoRMANCE T ESTING To BE CONDUCTED. (Attach additionelpege(slas,_ry, andidentify the kam description being continued) k Exhibits 4 and 5, attached, summarize the performance testing scheduled for the PBAPS Unit 2 simulator over the next four year period, ending February, 1999. The testing scheduled is in accordance with the requirements of ANSI /ANS 3.5-1985. 1 PERFCRMANCE TESTING PLAN CHANGE. (for any modification to e peribomance testing pian submhtad on a previous certificetion) DESCRIPT10N OF PERFORMANCE TESTING PLAN CHANGE (Attach additionalpage(slan neceasury,andidentify the kem dencription beirig continus:ff RECE RT;FlCATtoN (Dencribe correcthe actions taken, ettsch reauks of completedperforme' ace testing in accordance with 10 cFM l 55.45tb)(5)lv). Attach addklonalpage(s)se necenaery, andidentity the kom description being continuedJ Any falso statement or omesson in this document, insding ettachments, may be subject to civil and criminal sanctions. I certify under penetty of perjury that the information in this document and m.n .ts is true and -.a. SIGNATURE-AUTHORIZED REPRESENTATIVE l TITLE l0 ATE k Vice President, PBAPS 1/27/95 f 84 Y a in acconiarum with 10 CF R l 56.5, Communicatiopis form shall be submitted to the NRC as follows: BY IAAll ADDRESSED TO: D6esenet Offlee erNeoiner Rescuer Reguisden 8Y DELIVERY IN PERSON.One White F5nt North U1 Nemiser Reguisesty Commission To THE NRCoFFICE AT: 11855 Roelreme Mke Washington,DC 20EOS Reakves,MD _m IssC FORM 474 (1401

U.S. LUCLEAR kELULAT4.Y CoNWWilS5foN APPROVED BY OMS: NO. 315o4138 NRC Fonu 474 EXPBRES: S.3482 4140) j to CPR SS.a6M, ESTIMATED SURDEN PE3 RESPONSE TO COMPLY WITH TH4 56,4and653 JNFOR7.ATION COLLECTION REQUEST: 120 HRS. FORWARD SIMULATION FACILITY CERTIFICATION

===A"A avaa,;o"Myua=XT,alA;; ;",A,'";;a - a U.S. NUCLEAR REGULATORY COMMIS$10N. WASHINGTON. D 20656, AND TO THE PAPERWORK REDUC 110N PROJECT (3150-01381. OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON. 1 DC 20603. INSTRUCTIONS. This form is to be filed for initial certification, racertif: cation (if required), and for ar.y change to a simulation facility performance testing pla submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal. lDoGKET NUMBER FACILITY Peach Bottom Atomic Power Station Unit 3 S278 j lDATE LICENSE E 1/27/95 PECO Energy Company Th% is to certify that: The above named facility licensee is using a simulation f acility consisting soleiv of a plant referenced simulator that meets the requirements of 10 CFR 56.45. 1. Documentation is available for NRC review in accordance with 10 CF R 55.45(bl. l 2. 3. 1his simulation facihty meets the guidance contained 6n ANSI /ANS 3.5,1985, as endorsed by NRC Regulatory Guide 1.149. if there are any exceptions to the certification of this item, check here (X) and describe fully on addst;onal pages as necessary. NAME (orother Mentification) AND LOCATION OF SIMULATION FACILITY Peach Bottom Atomic Power Station, Unit 2 Simulator i i Peach Bottom Atomic Power Station, R.D. #1, Bcx 208, Delta, PA 17314 I e SIMULATION F ACILITY PER FORMANCE TEST ABSTRACTS ATTACHED. (Forperformenre tests conducted in the period endins wich the date of this certifica X OESCRIPTloN OF PERF0RM ANCE TESTING COMPLETED (Attr)I additionalpage(s) as necanenty, and Mentify the kom dancription being continued) i The PBAPS Unit 2 simulator is used for training and examination of PBAPS Unit 3 personnel. Exhibits 2 and 3, attached, summarize the performance testing completed since the initial certification.in February 1991. These test reports document the' simulator facility per--- formance as it relates to the reference plant in accordance with ANSI /ANS 3.5-1985. An updated list of Unit 3 exceptions to ANSI /ANS 3.5-1985 is provided in Exhibit 1, attached. I SiMULAT10*4 FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approximsrely25% of performance tearsperyear brthe huryear E period commencing wth the date of this certification.) ) DESCRIPTSON OF PERFORMANCE TESTING To BE CONDUCTED. (Attach edditionetpnge(sj se necesenry,and Mentify the kem description being continued) k h Exhibits 4 and 5, attached, summarize the performance testing scheduled for the PBAPS Unit 2 simulator over the next four year period, ending February 1999. The testing scheduled is in accordance with the requirements of ANSI /ANS 3.5-1985. b PERFORMANCE TESTING PLAN CHANGE. (l'or any modification to a performance tertingplan submktad on a previous certification) k OESCRIPTION oF PERFORMANCE TESTING PLAN CHANGE (Ansch addkionalpage(slas necenaery,and Mentify the kem dencription beirnF conthund) 'I d i A ) i RECERTlF lCATloN (Oencribe correctim actions taken, attach results of complandperformance testing in accordance wkh 10 Cf R l 55.45tbitS)/v). Atta:h addklonalpegels) as i =ry, and Mentify the lism description being continued.) l c Any falso statement or omission in this document, including ettachments, may be subject to civil and criminal sanctions. I certify under penefty of i j if that the infortnetion its this document and att .;c.ts le true and correct. l l TITLE lDATE SIGNATURE AUTHoRt ED R R ENTATIVE I k d 1/27/95 ,j c% Vice President, PBAPS in scoordance wNh 10 CF R I 55.5, Communicet this form shall be submitted to the NRC as follows: BY Mall ADDRESSED TO: D6costor, of Naciser Reactor Regulation BY DELIVERY IN PERSON.One Whhe Flint herth U.S.Nucleer Reguietary CommissioR TO THE NRC OFFICE AT: 11585 Reakvute PBee Washington,DC 20l156 Reek,gte, he l n fotC pores (74 (140)

b p Table of Contents , p-v Exhibit 1 Updated Exceptions to ANSI /ANS 3.5-1985 ' Exhibit 2 Simulator Performance Test Report - Malfunction Tests Exhibit 3 Simulator Performance Test Report - Computer Performance, Steady State and Normal Operation, and Transient Performance Tests Exhibit 4 Simulator Performance Test Schedule - Malfunction Tests Exhibit 5 Simulator Performance Test Schedule - Computer Performance, Steady State and O. Normal Operation, and Transient Performance Tests j 'i O

o l } EXH! BIT 1 l Updated Exceptions to lO ANSI /ANS 3.5 - 1985 1 t t I O

7.,, gn ~1 ,s, J-d! L Page 1. of 6 - LIST OF EXCEPTIONS TO ANSI /ANS-3.5,'1985 FOR PBAPS UNIT 2 CERTIFICATION

2. l.-

The following are exceptions to the physical arrangement of the Unit 2 and common panel areas: i Entrances to the simulator spaces are from behind the Radiation Monitoring : r ' ~ and H Water Chemistry Panels (00C014 and 20C810), instead of behind the 2 Reactor Protection Panels (20C017). The Offgas Recombiner Panel,00C196 is terminated at the junction of the common system equipment controls and the Unit 3 controls; thus only the Unit 2 and common equipment are included. The Unit 2 H Water Chemistry Panel,20C810, is located adjacent to the - 2 shortened Offgas Recombiner Panel adjacent to the common equipment. : in the reference plant control room, the 20C810 panel is located adjacent to the Unit 3 offgas recombiner equipment on 00C196. h The 00C014 Radiation Monitoring Panel is located adjacent to the 20C810 panel in place of the 30C810 panel (Unit 3 H, Water Chemistry Panel).' I The relay panels (20C017 through 00C0200) are displaced approximately 2 1 - feet to the right (fac;ng the front of the panels); this is to allow access to the 'l rear entrance of the instructor's station. II. The following are exceptions to control panel design: Annunciator panel window lights in the simaiator are dimmer than close in the PBAPS control room. As a result, the wndows that are color only on half the - window (on a diagonal); this is done to maintain readability. These windows in the reference plant have the blue fully across the face of the annunciator - window. This was an authorized substitution made during simulator - procurement. O

~ J -:4 Exhibit 1 h. Page 2 of 6 ' l Ill. The following are exceptions to the design of information displays, physical l controls and equipment on simulated control panels. ~

  • Tracor-Westronics recorders have been substituted for GEMAC recorders.'

-l These recorders are outdated and no_ longer available; the' reference plant has ' been substituting in the same manner when existing GEMAC recorders can no - y longer be repaired. This was an authorized substitution during simulator j procurement. The demand metering on panel 00CO200 is not simulated. This was an authorized omission made during simulator procurement. The climatronics panel data logger in the main control room is powered via the { control panel auxiliary lighting power supply. The simulator electrical i distribution system was not designed to simulate the level of detail down to j control panel auxiliary power, therefore, loss of power to this equipment is not j simulated. Resolution of this difference is not cost effective considering the minor training impact. Annunciators in the simulator flash at identical rates throughout the simulator,. o O

  • nereas in the main controi room. different annunciator paneis fiash at i

different rates. Resolution of this difference is not cost effective considering the minor training impact. IV. The following are exceptions to the Simulator Control Room environment in the areas of flooring, lighting, obstructions, and communications equipment: The floor structure for the simulator is a standard computer floor with carpeting; the carpeting is the same as the PBAPS Control Room except for seaming as necessary to allow access through the computer flooring. This was an authorized substitution made during simulator procurement. i The PBAPS Control Room lighting is divided into four separate groupings with different power supplies,2 separate DC and 2 separate AC sources; because of building wiring limitations, the simulator has only two groupings of lighting,1 a simulating a DC and 1 an AC power source.. This was an authorized substitution made during simulator procurement. The simulator and Unit 2 control room area lighting and lighting levels have been designed to be the 3j same. i Remote and alternate control panels that are simulated are located in rooms n separate from simulator control room panels. Their environment does not U duplicate the conditions at the plant remote control panels. -i l 1 l

Exhibit 1 7O Page 3 of 6 V. The following are exceptions to the Simulator Training capabilities: I Maifunctions inserted via the remote trigger panels on the simulator operating area could alert the operators to the impending malfunction. i - The high voltage' bulb in the main steam line radiation monitor drawer, when l removed, does not cause an inoperative scram and isolation signal as it would in the plant.' Resolution of this difference is not cost effective considering the l minor. training impact. Also, an upgrade replacement of these instruments is planned for the plant, and the simulator, that will resolve this difference. t The Suppression Pool Temperature Monitoring System (SPOTMOS) cannot be l operated _ in complete accordance with procedure SO 94.F.1.A-2 due to r hardware differences between the simulated system and the plant system. Also, although there are two redundant SPOTMOS systems in the plant, in the simulator one is a ' slave' to the other. Resolution of this difference is not cost effective considering the minor training impact. Also, an upgrade replacement of these instruments is planned for the plant and the simulator that will resolve this difference. O

  • Exceptions identified since initial certification.

j i I c h O

i s .,-._e 7..,_. .._,._.m ...m.. g u_ ~. _ m 4 I Exhibit 1

!o.

e=9 4 of e LIST OF EXCEPTIONS TO ANSl/ANS-3.5,1985 I FOR PBAPS UNIT 3 CERTIFICATION- } 51. The following are exceptions to the Control Room / Simulator physical i arrangement-The bench board panels (30C06A through 30C0012) and the vertical panels directly behind them are rotated 90 from the simulator positions; further exceptions to this are- . The location of the Radiation Monitoring Panels (30C002,30C010, and - 30C011),' which are arranged in reverse order adjacent to the 00C014 Radiation Monitoring Panel. a The Fire Protection Panel and equipment locker (00C001) in the simulator, i which does not have a counterpart in Unit 3; this causes the 30C206L I annunciator panel to be located above the 30C010 and 30C011 panel instead of the fire panel. Tne verticai back Panei= caocoo48 tarouan 30C003) are tran i ted to tne i O opposite side of the Main Generator Control Panel (30C009), arranged in the same order; the CAD Control Panels (30C284A and B) are adjacent to the 30C0048 panel (HPCl) instead of the PCIS/SRV Panel (20C003-01) as in the t,imulator. l l' 11. The following are exceptions to control panel design: Annunciator panel window lights.in the simulator are dimmer than those in the~ l PBAPS control room. As a result, the windows that are color coded blue have the color only on half the window (on a diagonal); this is done to maintain - readability. These windows in the Reference Plant have the blue fully across the face of the annunciator window. This was an authorized substitution made during simulator procurement. r O

x Exhibit 1' V' Page 5 of 6 Ill. The following are exceptions to the design of information displays, physical controls, and equipment on simulated control panels: Tracor-Westronics recorders have been substituted for GEMAC recorders. These recorders are outdated and no longer available; the Reference Plant has been substituting in the same manner when existing GEMAC recorders can no longer be repaired. This was an authorized substitution made during simulator procurement. Annunciators in the simulator flash at identical rates throughout the simulator, whereas in the main control room different annunciator panels flash at different rates. Resolution of this difference is not cost effective considering the minor training impact. ) IV. The following are exceptions to the simulator environment and the PBAPS control room environment in the areas of flooring, lighting, obstructions, and i communications equipment: The floor structure for the simulator is a standard computer floor with carpeting; the carpeting is the same as the PBAPS control room except for O seemino es necessary to aiiow accese enrouah the computer fioorino. This was an authorized substitution made during simulator procurement. The PBAPS control room lighting is divided into four separate groupings with different power supplies,2 separate DC and 2 separate AC sources; because of building wiring limitations, the simulator has only two groupings of lighting,1 simulating a DC and 1 an AC power source. This was an authorized substitution made during simulator procurement. The simulator and Unit 2 control room area lighting and lighting levels have been designed to be the same. Remote and alternate control panels that are simulated are located in rooms separate from simulator control room panels. Their environment does not duplicate the conditions at the plant remote control panels. O

~.. _. ~_ { + m n Exhibit i

  • t

. -v O-ease s of s . V. The following are exceptions to the simulator training capabilities: L Malfunctions inserted via the remote trigger panels on the simulator operating area could alert the operators to the impending malfunction. The high voltage bulb in the main steam line radiation monitor drawer, when removed, does not cause an inoperative scram and isolation signal as it would. 4 in the plant. Resolution of this difference is not cost effective considering the - minor training impact. Also, an upgrade replacement of these instruments is planned for the plant and the simulator that will resolve this difference. The Suppression Pool Temperature Monitoring System (SPOTMOS) cannot be operated in completed accordance with procedure SO-94.F.1.A-2 due to hardware differences between the simulated system and the plant system. Also, although there are two redundant SPOTMOS system sin the plant, in the simulator one is ' slave' to the other. Resolution of this difference is not cost effective considering the minor training impact. Also, an upgrade replacement of these instruments is planned for the plant and the simulator that will resolve - this difference. O

  • Exceptions identified since initial certification.

O

O EXHlBlT 2 Simulator Performance Test Report - O Malfunction Tests 1

F PEACH BOTTOM ATOMIC POWER STATION UNIT 2 SIMULATOR SIMULATOR PERFORMANCE TESTS REPORT

g

'\\ The $1mulator' Performance Tests are grouped into four categories: k. SCPT, Simulator Computer Performance Tests - SSPT, Simulator Steady-State and Normal Operation Tests SMPT, Simulator Malfunction Performance Tests STPT and SMPTT, Simulator Transient Performance Tests-The tests required to demonstrate acceptable Simulator Performance are identified, prepared, and tested against the acceptance criteria described in ANS!/ANS 3.5 1985. The listing below tabulates all the Simulator Performance Tests performed for Simulator Certification, their current status (S-satisfactory, U unsatisfactory, X-deleted), the dates the tests were coupleted with test results, and any simulator work orders generated against the test. "Clsd" following a work order rnaiber indicates that the work order has been resolved and is closed. For those tests which have an open work order against them, the training inpact has been assesed. Those tests with discrepancy having training lapact are considered unsatisfactory. Those tests that have been deleted were deleted either by modifications made to the simulator, or because the malfunctions had no training value. Page No. 1 01/25/95 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER TITLE STATUS NUMBER N./ SMPT-A0501 ADS CHANNEL FAILS TO INITIATE S 09/14/90 - S; 02/19/91 - S SMPT ADS 02 RUPTURE IN SRV DOWNCOMER IN S 10/11/94 - S TORUS AIRSPACE SMPT-ANN 01 CONTROL ROOM ANNUNCIATOR S 09/19/90 - U

900554, STSTEM FAILURE 02/03/92 - S CLSD SMPT-ANNO 3 ANNUNCIATOR CRY WOLF (CWA),

S 09/19/90 - S DEFEAT (DWA) 09/21/93 - S SMPT APRO1 APRM CHANNEL FAILS UPSCALE S 09/19/90 - S

940016, 01/19/94 - U CLSD SMPT APR02 APRM CHANNEL FAILS DOWNSCALE S

09/19/90 - S; 02/18/91 - S + SMPT-APR03 APRM CHANNEL FAILS INOP S 09/19/90 - S 03/03/92 - S SMPT-APR04 APRM CHANNEL AVERAGE circuli 5 09/20/90 U

900539, DEVIATION 04/15/91 S CLSO

fPepe No. 2-01/25/95 PERFORMANCE TEST ' PERFORMANCE TEST TEST TEST HISTORY WORK ORDER -/ ) TITLE STATUS-NUMBER ^ -( / wr~ 02/26/93 - S -SMPT-APR05 APRM FAILS TO TRIP DOWNSCALE-S, 09/19/90 - S; 02/18/91 - S SMPT-APR06 APRM FAILS TO TRIP INOPERATIVE S 99/19/90 - S 9200514 03/03/92 - U CLSD SMPT-APR07 APRM FAILS TO TRIP UPSCALE S 09/19/90 - S -(HI)- 01/19/94 S SMPT*APROS APRM FAILS TO TRIP UPSCALE HI S 09/19/90 - S "940018 o HI 01/19/94 5 SMPT AR1141 ARI ISOLATION / EXHAUST VALVE S 01/15/91 - S; 141 FAILURE 02/18/91 S SMPT-art 142 ARI EXHAUST VALVE 142 FAILURE S 01/15/91 S 03/03/92 - S . SMPT ARIF2 ARI POWER SUPPLY FAILURE S 01/15/91 - S 09/21/93 - S SMPT ARM 01 ARM CHANNEL FAILS UPSCALE S 09/19/90 - S 02/24/93 - S SMPT-ARM 02 ARM CHANNEL FAILS DOWNSCALE S 07/21/92 - S

910107, CLSO

? SMPT-ARM 03 ARM CHANNEL FAILS INOP S 09/19/90 - S

920045, 03/01/92 - U CLSD SMPT CAR 01 MAIN CONDENSER AIR IN LEAKAGE S

09/17/90 - S 09/14/93 - S SMPT CAR 02 SJAE STEAM SUPPLY VALVE FAILS S 09/20/90 - S 940019 CLOSED 01/19/94 - S SMPT CAS01 LOSS OF INSTRUMENT AIR U 09/18/90 - U

900544, 10/11/91 - U-CLSD 10/18/93 - U
910315, l

CLSD 930123 j SMPT-CASO2 INSTRUMENT NITROGEN RECEIVER S 09/19/90 - S LEAK 03/03/92 - S v l

r J 'Page No. 3 01/25/95 PERFORMANCE TEST. PERFORMANCE TEST TEST TEST HISTORY WORK ORDER ,/j 1 TITLE STATUS NUMBER k $MPT CRH01 FLOW CONTROL VALVE FAILURE S 09/10/90 - U '

900085, 02/25/93 - S' CLSD t

SMPT CRH02 CR0 DRIVE WATER FILTER S 09/19/90 - S CLOGGING 01/19/94 S SMPT CRH03 ~ CR0 HYDRAULIC PUMP TRIP S 09/19/90 S 04/15/91 S SMPT CRN04 CONTROL R00 DRIFTS IN ^ S 09/09/90 - U 900510 03/01/92 - S SMPT CRH05 CONTROL RCD ACCUMULATOR S 09/19/90 - U

900538, TROUSLE 11/04/93 U CLSD SMPT-CRH06 CRD STABILIZING VALVE FAILS.

S 09/19/70 - U

900553, CLOSED 10/11/91 U CLSD
b

'SMPT CRH07 LOSS OF AIR PRESSURE TO CRD S 09/10/90 '- U 900558 .[d-HCU'S 05/11/94 - S SMPT CRH08 SCRAM DISCHARGE VOLUME LEVEL S 09/09/90 - S; HIGH 02/18/91 - S SMPT CRH09 SCRAM DISCHARGE VENT VALVE S 09/19/90 - S FAILS OPEN 03/03/92 - S SMPT CRH10 SCRAM DISCHARGE VOLUME VENT S 09/19/90 - S VALVE FAILS CLOSED 02/22/93 S SMPT CRH11 SCRAM DISCHARGE VOLUME DRAIN S 09/23/90 -'S 940020 VALVE FAILS OPEN 01/20/94 - S-SMPT CRH12 SCRAM DISCHARGE VOLUME DRAIN S 09/23/90 - $; VALVE FAILS _ CLOSED 02/18/91 - S SMPT-CRH13 CONTROL ROD GROUP FAILS TO S 09/23/90 S: SCRAM 03/04/92'- S SMPT CRM01 CONTROL RCD DRIFTS OUT S 09/10/90 S 910221, 11/04/93 - U CLSD' C-( =

Pope No. 4 01/25/95 4' -l 1 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER i l }' TITLE' STATUS ~ NUMBER .\\ )-- ? -SMPT-CRM02 CONTROL ROD BLADE STOCK S 09/10/90 - S 01/20/94 - S { SMPT CRM03 CONTROL RCD UNCOUPLED U 09/10/90 - S; M0260 f 02/18/91 - S i SMPT CRM04 CONTROL ROD RPIS FAILURE S 09/09/90 - U

900509, 07/20/92 - S CLSD
900506, i

CLSD .{ SMPT-CRM05 CONTROL ROD SLOW SCRAM TIME S 09/23/90 - S 09/10/93 - S SMPT CES01 CORE SPRAY PUMP TRIP S 09/23/90 - U

900548, I

S1/20/94 - S CLSD SMPT-CS$02 CORE SPRAY INJECTION VALVE S 09/23/90 - S; FAILS TO AUTO OPEN 04/15/91 - S NPT CWS01 LOSS OF CONOWINGO POND S 08/24/90 - S I 03/26/92 - 5 ) .Q d j - '$MPT CWS02 MAIN CIRC WATER PUMP TRIP S 09/23/90 U

910167, 04/15/91 - U CLSD 02/22/93 - S SMPT CWS03 MAIN CONDENSER TUBE BLOCKAGE S

09/23/90 - U

900556, 07/31/91 - S CLSD 01/21/94 - 5 SMPT CWSO4 COOLING TOWER LIFT PUMP TRIP S

09/2'/90 - S f 03/03/92 - S i SMPT CW505 COOLING TOWER FANS TRIP S 09/23/90 - U

900557, 11/04/93 U CLSD l

4 EMPT-CWS06 TRAVELING SCREEN BLOCKAGE S 09/23/90 - U

900523, 10/11/91 - U CLSD
900525, CLSD
910313, CLSD SMPT-CWS07 TRASM RACKS BLOCKAGE S

09/25/90 - U

900524, 02/13/92 - S CLSD
900540, A

t

4'[ t Pop No. 5 01/25/95 e PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY. WORK ORDER

/Nv TITLE STATUS NUMBER I

- (v) e CLSD t SMPT DCD01A 250 VDC DISTRIBUTION PANEL 10/18/90 S ~ 20012 FAULT- '10/19/93 S. ~; SMPT DCD01B' 250 VDC DIST. PANEL 20D11 S' '10/18/90 - U

900589, FAULT 05/03/94 - S-
CLSD, t

i SMPT DCD01C 250 VDC DIST. PANEL 20007 S 10/24/90 - $; FAULT 04/15/91 - S SMPT-DCD01D 250 VDC DIST. PANEL 20008 s 10/18/90 - U

900590, 9

FAULT 03/19/91 - S CLSD 03/24/92 - S

940228, j

CLSD SMPT DCD01E 250 VDC DIST. PANEL 20005 S 10/18/90 - S. FAULT -10/19/93 - S' SMPT DCD02A .125 VDC DIST.IIBUTION PANEL U 10/19/90 U

900594, 2 PPA FAULT 05/04/94 - U CLSD'

[

900595,

/ CLSD A 900596,' CLSD' 900597,' CLSD' j

90059e, CLSD

'I

900323, i

CLSD-

920169, CLSD
940007, CLSD 3

940144 SMPT-DCD02a 125 VDC DISTRIBUTIDN PANEL S 10/19/90 - U

900599, 2 PPA FAULT 10/11/91 - S CLSD
900600, CLSD
900601, CLSD
900602, CLSD
900603, CLSD
900604,

\\ =

.l I -) r

i. " '

6 01/25/95 Page No. $f, ' PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER-1 N /Y TITLE 5iATUS NUMBER .l b_ 3 l l u CLSD

900746, CLSD
920169, CLSD
l..

SMPT-DCD02C. 125 VDC DISTRIBUTION PANEL S 10/24/90 - U

900745, 2PPC FAULT 03/24/92 - U CLSD
900747, CLSD
900734, CLSD
910256, CLSD
920078, CLSD SMPT-DCD02D 125 VDC DISTRIBUTION PANEL S

10/24/90 - U

900744, 2 PPD FAULT 10/20/93 - S CLSD
900590, CLSD O

SMPT DCD02E 125 VDC D!$TRIBUTION PAJEL 10/13/93 S 280306 FAULT SMPT DCD03A 24 VDC DISTRIBUTION PANEL BUS S 10/22/90 - U

900637, 2E FAULT 05/04/94 - S CLSD
900638, CLSD SMPT-DCD038 24 VDC DISTRIBUTION FANEL BUS S

10/22/90 - S; 2F FAULT 07/29/91 - S SMPT-DCWO1 DW CHILLER WATER PUMP TRIP S D9/25/90 - U

900520, 03/01/92 S CLSD SMPT DCWO2 DW CHILLED WATER CHILLER TRIP S

09/25/90 - S 02/22/93 - S SMPT DCWO3 DWCW/RBCCW AUTO SWAPOVER S 09/25/90 - S FAl!URE 01/23/94 - S i SMPT-DCWO4 DWCW LEAKAGE INSIDE THE S 09/10/90 U

900546, DRYWELL 10/11/91 - S CLSD
900595, A

r p. .y. ? PaBe No. 7 01/25/95' PERFORMANCE TEST PERFORMANCE TEST < TEST TEST HISTORY ' WORK ORDER-TITLE STATUS NUMBER , if )C \\ ( CLSD .SMPT DGA01. DIESEL GENERATOR FAILS 70-S 09/25/90 - S START 03/03/92. SMPT-DGA02~ DIESEL GENERATOR BREAKER AUTO S 09/25/90 S CLOSE FAILURE 09/09/93 S SMPT DGA03 DIESEL GENERATOR TRIP S 09/25/90 - U.

900519, 01/24/94 - S CLSD SMPT E M t ECW PUMP TRIP U

09/25/90 - S;- 910087 02/18/91 - U { SMPT ECWO2 ECW COOLING FAN TRIP S 09/25/90 - S 03/03/92 - S i SMPT EHH01 SYPASS VALVE FAILS OPEN 09/25/90 - S 02/22/93 - S l SMPT ENH02 BYPASS VALVE FAILS CLOSED S 09/25/90 - S . 940024, 01/24/94 - U CLSD i SMPT-EHH03 BYPASS VALVE STICKS OPEN S 09/25/90 - S;

920004, l

02/18/91 - S CLSD j } SMPT-ENH04 EHC HYDRAULIC PUMP TRIP S 09/25/90 S. 03/04/92 - S SMPT EHLO1 PRESSURE REGULATOR FAILS LOW S 09/09/90 - S 09/09/P3 - S SMPT EHLO2 PRESSURE REGULATOR FAILS HIGH S 09/09/90 U

910168, 04/16/91 - U CLSD 01/24/94 - S
900515, CLSD l

SMPT EHLO3 PRESSURE REGULATOR OSCILLATION 09/25/90 - S; 02/18/91 - S i SMPT-EHLO4 MAIN TURBINE ACCELERATION S 09/25/90 - S RELAY FAILURE 03/21/94 S c SMPT-EHLOS LOAD SET FAILURE S 09/18/90 - U

900543, 03/01/92 U CLSD 900542,'

CLSD i I

b :: 1 u { _p. i ~Pase No.': 8 01/25/95: { PERFORMANCE TEST PERFORMANCE TEST ' TEST-TEST HISTORY' WORK ORDER ' Y,_ {, TITLE STATUS . MUMSER' [ 1-.k / i -'IMPT ENLO6 LOAD RUNIACK FAILS 70 S '09/18/90 - U'

900541, TERMINATE 03/01/92 - S CLSD 09/10/93 S 930102

-r ' SMPT ESD01 LOSS OF EXTRACTION STEAM TO FW 09/17/90 - S 960037,. t MEATER 01/25/94 - U CLSD. .SMPT ESD02 FW HEATER LEVEL CONTROL VALVE S 09/25/90 - S; FAILS OPEN 02/19/91 S SMPT ES003 FW HEATER LEVEL CONTROL VALVE -S 09/25/90 - U

900522, FAILS CLOSED 02/11/92 - U CLSD' 05/24/93 - S
920014,

.t CLSD 1 SMPT-ESD04 MOISTURE SEPERATOR DRAIN TANK 09/25/90 - S LEVEL CONTROL VALVE FAILS 09/09/93 - S CLO3ED O-SMPT ESD05 FEEDWATER HEATER DUMP VALVE S 04/15/94 - U

940090, FAILS OPEN CLSD i

SMPT ESD06 FEEDWATER NEATER DUMP VALVE S 05/13/94 - U

940148, FAILS CLOSED CLSD SMPT ESWD1 ESW PUMP TRIP S

09/26/90 - U-

890291, 01/25/94 - S CLSD SMPT FCR01 FUEL CLADDING FAILURE 5

09/20/90 - U 900527,- l 10/11/91 - S CLSD. l

900515, l'

CLSD

910168, CLSD SMPT FCR02 INCREASED CONTROL ROD WORTH S

09/26/90 - S; 04/15/91 - S SMPT FPS 01 CARD 0X INJECTION TO THE DIESEL 09/26/90 U

910150, 1

GENERATOR ROOM 04/16/91 - U CLSD 1 10/11/91 - U

920149, 05/12/92 - U CLSD O

+ n,_ 1 JPage No. 9 01/25/95 PERFORMANCE TEST PERFORMANCE TEST-TEST TEST HISTORY WORic ORDER l /* TITLE STATUS NUMBER i SMPT FWC01 RFP M/A CONTROLLER FAILURE S-09/26/90 S

930104, l

10/09/91 - S CLSD 09/20/93 U SMP!-FWC02 (DELETED) RFP MASTER CONTROLLER FAILURE X 09/17/90 U

900514, CLSD
910113, CLSD l

q i SMPT FWCO3 (DELETED) RFP MASTER CONTROLLER X 09/26/90 - S;

920062, OSCILLATION 02/20/91 S CLSD
j SMPT FWC04 FW FLOW TRANSMITTER FT-50 8

09/17/90 - S i FAILURE 10/09/91 - S l 04/15/92 - S SMPT FWC05 (DELETED) FW TEMP TRANSMITTER TT-80 X 09/26/90 - S

910113, I

FAILURE CLSD SMPT-FWC06 'FW TEMP TRANSMITTER TT-168 8 09/26/90 - S '940028 FAILURE 01/26/94 S SMPT FWCOT FWC FUNCTION GENERATOR FAILS S 08/31/90 U

900444, LOW 07/29/91 S

CLSD 10/09/91 - S i SMPT FWCD8 FEEDWATER PUMP MGU 120 VAC S 09/26/90 - S POWER LOSS 10/09/91 S -I 04/15/92 - S SMPT FWC09 (DELETED) STARTUP FW REG VALVE X 09/26/90 - S

910113, CONTROLLER FAILURE CLSD b

SMPT FWC10 (DELETED) STARTUP FW REG VALVE X 09/26/90 - S

910113, l

CONTROLLER OSCILLATION CLSD L t SMPT NPC01 FAILURE OF HPCI TO AUTO START S 09/27/90 - S; 04/15/91 S SMPT HPCO2 HPCI SPURIOUS AUTO START S 09/27/90 - S 03/04/92 - S 1 SMPT HPC03 HPCI TURBINE TRIP S 09/27/90 - U

900577,

{ 02/22/93 - S CLSD A

900004, O

t 4 i

i l r 6

pagego,'10 01/25/95 iPERFORMANCE TEST I PERFORMANCE TEST
TEST TEST HISTORY WORK ORDER:

[ TITLE ' STATUS NUMBER ns./)- i -4 I CLSD j

930019, l

CLSD j i b

SMPT NPC04 HPCI FLOW CONTROLLER FAILS LOW 09/27/90 - S 950004'.

t 01/26/94 S l 1 SMPT-NPC05 HPCI FLOW CONTROLLER FAILS S 09/27/90 - S; HIGH 02/20/91 - S SMPT MPC06 HPCI FLOW CONTROLLER S 09/27/90 S OSCILLATION 03/04/92 - S SMPT NPC07 HPCI STEAM SUPPLY LINE BREAK S 09/27/90 - S

920135, 12/18/91 - S CLSO 05/17/93 - S SMPT*HPC06 HPCI PUMP DISCH LINE BREAK S

09/27/90 - S 940030 '{ 01/26/94 - S ') SMPT*HPC09 HPCI LUBE DIL SYSTEM FAILURE S 09/27/90 - U

900578, f

10/11/91 - S CLSD U f SMPT*HPWO1 HPSW PUMP TRIP S 09/27/90 - S 03/03/92 - S i SMPT-HS001 HYDROGEN SEAL OIL PRES $URE S 09/27/90 U

900540, DECREASE 04/15/91 S CLSD 03/04/92 - S SMPT HWC01 (NOT $1M.)

HYDROGEN LEAK IN HYDROGEN X SYSTEM $1MULATION NOT + WATER CHEMISTRY SYSTEM COMPLETED 4 SMPT-HWCO2 (NOT SIM.) H2 WATER CHEMISTRY SYSTEM X SYSTEM SIMULATION NOT OXYGEN PRESSURE LOW COMPLETED l i SMPT IPM01 LOSS OF ALL AC POWER S 10/01/90 - U

900458,

+ 10/19/93 - S CLSD

900666, CLSD

{ SMPT IPM02 THREE MILE ISLAND ACCIDENT S 10/01/90 - U

900565, (BWR EQUIVALENT) 07/22/92 - S CLSD 01/26/94 - U
920010,

'CLSD

940035,

] CLSD

unu, 1

~,. f. i ~ Page No. '11 '01/25/95-t I PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER k TITLE STATUS NUMBER [^M h-t CLSD j SMPT IPM03 ANTICIPATED TRANSIENT WITHOUT S 10/01/90 - U

900586, SCRAM (ATWS) 08/05/91 - S CLSD SMPT IPM04 FIRE IN THE REMOTE SHUTDOW S

10/01/90 - U;

900584, PANEL 07/29/91 - S CLSD SMPT-IRM01 IRM CHANNEL FAILS UPSCALE 10/01/90 - S 03/09/92 - S SMPT IRM02 IRM CHANNEL FAILS DOWSCALE S

10/01/90 - S -l 09/29/93 - S SMPT IRM03 IRM CHANNEL FAILS INOP S 10/01/90 - S i 05/05/94 S-SMPT IRM04 IRM CHANNEL DETECTOR SRUCK S 10/01/90 - $; [ 04/15/91 S l SMPT IRM05 IRM CHANNEL FAILS TO TRIP INOP S 10/01/90 - S i 05/05/94 - S l SMPT !RM06 IRM CHANNEL FAILS TO TRIP S 10/01/90 S DOWSCALE 09/29/93 - S SMPT IRM07 IRM CHANNEL FAILS TO TRIP S 10/01/90 - S UPSCALE H! 03/09/92 - S l SMPT-IRM08 IRM CHANNEL FAILS 70 TRIP S 10/01/90 - S UPSCALE (HI HI) 03/09/92 S SMPT LPR01 LPRM FAILS UPSCALE S 10/01/90 S 03/04/92 S SMPT LPR02 LPRM FAILS DOWNSCALE S 10/01/90 - S; 02/18/91 - S SMPT MAP 01 MAIN TRANSFORMER COOLING LOSS S 10/01/90 - S

920013, 02/11/92 - U CLSD 05/24/93 S l

SMPT-MAP 02 LOSS OFF-SITE POWER SOURCES S 08/24/90 S 03/24/92 - S SMPT-MAP 03 500 KV CONTROL AIR FAILURE S 10/02/90 S 02/26/93 - 5 O i

.ij - Page No. 12. 01/25/95 .. -,. ' PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER I TITLE STATUS MUMsER .-t SMPT MAPO4 13.2 KV BUS FAULT S 10/02/90 - U

900563, i

05/04/94 - S CLSD ,SMPT MAP 05 STARTUP SOURCES SUS FAULT S 10/02/90 - U

900566, 07/29/91 U CLSD
910308, l

CLSD

910281, i

CLSD

920148, CLSD SMPT-MAP 06C 13.2 KV BREAKER TRIP S

10/02/90 - U

900588, 03/24/92 - S CLSD h

i SMPT-MAP 07A 4.16 KV EMERGENCY SUS E12 5 10/22/90 - U

900636,

+ (20A15) FAULT 10/21/93 S CLSD

900635, f

CLSD [V SMPT-MAP 07B 4.16 KV EMERGENCY BUS E22 S 10/22/90 - U

900636, (20A16) FAULT 05/03/94 - S CLSD-

[

900635, i

CLSD

900633, CLSD e

SMPT-MAP 07C 4.16 KV EMERGENCY BUS E32 S 10/22/90 - U

900636, (20A17) FAULT 10/14/91 S CLSD
900635, 1

CLSD i SMPT-MAP 07D 4.16 KV EMERGENCY BUS E42 5 10/22/90 - U

900636, (20A18) FAULT 03/26/92 S CLSD
900635, l

CLSD J SMPT-MAP 07E 4.16 KV EMERGENCY BUS E-13 5 10/22/90 - U

900636, l

FAULT 10/21/93 - S CLSD -J

900635, l

CLSD i SMPT-MAP 07F 4.16 KV EMERGENCY BUS E 23 S 10/22/90 - U

900636, FAULT 05/03/94 - S CLSD O

1

) 3:

PaBe No. 13 01/25/95

1-l [. PERFORMANCE TEST PERFORMANCE TEST-l TEST -TEST HISTORY. . WORK ORDER l TITLE STATUS MUMBER s_)

900635, CLSD I

e SMPT MAP 07G 4.16 KV EMLRGENCY BUS E-33 S 10/22/90 - U

900636, j

FAULT 10/14/91 - S CLSD

900635, i

CLSD j SMPT MAP 07H 4.16 KV EMERGENCY BUS E 43 S 10/22/90 - U

900636, FAULT 03/26/92 - S CLSD
9006n, CLSD l

? SMPT-MAP 08 4.16 KV EUS AUTO TRANSFER S 10/02/90 U

900568, FAILURE 04/15/91 - S CLSD 10/19/93 - S SMPT MAP 09 13.2 KV BUS AUTO TRANSFER S

08/23/90 - S FAILURE 01/31/94 - S SMPT MCS01 MAIN CONDENSER TUBE LEAKAGE S 10/02/90 - U 900562,. 0 07/01/93 - S CLSD

900569, 4

CLSD i SMPT MC502 HOTWELL LEVEL TRANSMITTER C 10/02/90 - S; i l FAILS HIGH 02/21/91 - S i SMPT MCS03 HOTWELL LEVEL TRANSMITTER S 10/02/90 U

900564, FAILS LOW 02/10/92 - U CL2 03/01/92 - U
920035, 08/03/92 S CLSD SMPT MCS04 HOTWELL LEVEL TRANSMITTER S

10/02/90 - S FAILS AS IS 09/20/93 - S i SMPT MCS05 CONDENSATE PUMP TRIP S 10/02/90 - S l 10/09/91 S r 01/31/94 - S l 'SMPT MCS06 CONDENSATE DEMIN RES!P S 10/02/90 - U 900562,- DEPLETION 10/11/91 - U CLSD

910309, i

CLSD i O 4. I ?

w: t k s Page No. 14 01/25/95 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY-WORK ORDER .,PY 13TLE STATUS NUMBER 5 4 (/ l ' SMPT-NCS07 CONDENSATE FILTER /DEMIN RESIN S 09/17/90 - U 900512,- INJECTION 02/12/92 - S CLSD. 900511,. CLSD SMPT NCS06 EXHAUST NOOD SPRAY VALVE FAILS S 10/03/90 - U

900572, CLOSED 07/21/92 - S CLSD 10/04/93 - S I

SMPT MFS01 REACTOR FEEDWATER PUMP TRIP S 10/03/90 - S 10/09/91 - S 01/31/94 - S 3 SMPT-MFS02 REACTOR FEEDWATER PUMP HIGH S 10/05/90 - S; 1 VISRATION 04/15/91 - S SMPT MFS03 REACTOR FEEDWATER PUMP LOSS OF S 10/03/90 - U

900573, LUBE OIL 02/11/92 S CLSD SMPT MFSO4 REACTOR FEEDWATER PUMP MINIMUM S

09/05/90 - S

920071, FLOW VALVE FAILS OPEN 02/26/93 S CLSD l

\\ SMPT MFS05 REACTOR TEEDWATER PUMP MINIMUM S 09/05/90 - U

900492, FLOW VALVE FAILS CLOSED 03/21/94 - S CLSD
920071, CLSD
920211, I

CLSD [ SMPT MFS06 FEEDWATER HEATER TUBE LEAK S 10/03/90 - S

910247, 07/29/91 - U CLSD,

07/23/92 - U

920187, CLSD i

t SMPT MFS07 LOSS OF AIR TO RFP C OlSCHARGE 5 10/03/90 - S

920055, l

SYPASS VALVE 03/11/92 - U CLSD 07/21/92 - S SMPT-MFS08 LOSS OS AIR TO RFP BYPASS S 10/03/90 - S VALVE CV 2558 09/29/93 - S SMPT-MGA01 MAIN GENERATOR TRIP S 10/03/90 - 5 02/01/94 - S SMPT-MGA02 VOLTAGE REGULATOR FAILS HIGH S 10/03/90 - S; 07/29/91 - S G 9

p- -. g .Page No. 15 01/25/95 .i PERFORMANCE TEST PERFORMANCE TEST ' TEST TEST HISTORY WORK ORDER [~'N . TITLE-STATUS NUMBER h, ]. -s s r SMPT MGA03 VOLTAGE REGULATOR FAILS LOW S 10/03/90 - S 03/04/92 - S SMPT MGA04 VOLTAGE REGULATOR TRANSFERS TO S 10/03/90 - S MANUAL. 02/22/93 - S i SMPT MGA05 GENERATOR FIELD BREAKER FAILS S 10/03/90 - S OPEN 02/01/94 - S 4 .SMPT-MGA06 GENERATOR FIELD BREAKER FAILS S 10/03/90 - S; TO CLOSE 02/21/91 - S l i SMPT MGA07 MAIN GENERATOR HTDROGEN LEAK S 10/03/90 - S 03/04/92 - S SMPT MLOO1 MAlW TURBINE BEARING OIL S 10/03/90 U

900570, PRESSURE DECREASE 03/01/92 S CLSD j

02/02/94 - S SMPT MLOO2 MAIN SHAFT Cll PUMP FAILURE S 10/03/90 - S; 04/15/91 - 5 ~ SMPT MSS 01 ' STEAM LEAKAGE INSIDE THE S 10/03/90 S PRIMARY CONTAINMENT 03/09 92 - S Q' - SMPT-MSS 03 MSL RUPTURE OUTSIDE THE S 10/04/90 - U

900779, PRIMARY CONTAINMENT 05/20/93 - S CLSD l

02/02/94 - S

920147, CLSD
920198, CLSD i

SMPT MS$04 MAIN STEAM HEADER PRESSURE S 09/17/90 - U

900515, TRANSMITTER PT 2184/PT 2185 10/14/91 - S CLSD FAILURE
900514, CLSD
900513, i

'CLSD i SMPT MSS 05 MSIV DISC FAILURE S 09/17/90 - U

900587, 03/09/92 - S CLSD l

SMPT-MSS 06 MSIV FAILS CLOSED S 09/17/90 - U

900587, 07/31/91 - S CLSD 09/13/93 - S 1

SMPT MSS 07 MS!v SLOW CLOSURE TIME S 10/04/90 S 02/03/94 - S k. s

i.m .k .J b

  • Papa No.

16 01/25/95 . m 'HisTORT. WORK ORDER PERFORMANCE TEST PERFORMANCE TEST' -TEST. f'~N.. TITLE STATUS NUMBER i i hj-SMPT MS$08 REACTOR PRESSURE RELIEF VALVE S 09/17/90 - S FAILURE 09/13/93 S SMPT MS$09 REACTOR PRESSURE FILIEF VALVE S 10/04/90 - S 940043' STICKS OPEN 02/14/94 - S 940044-SMPT MSS 10 STEAM LEAKAGE IN THE STEAM S 09/20/90 - S

910137, TUNNEL 04/15/91 - U CLSD 08/16/91 - U
910274, 08/03/92 - S CLSD
910346, CLSD I'

V SMPT MS$11 MSL FLOW TRANSMITTER FT-6-51 S 09/17/90 - S FAILURE 10/09/91 - S 05/13/92 S SMPT MS$12 (DELETED) MSL PRES $URE TRANSMITTER X 10/04/90 - S

910113, PT 6-60 FAILURE.

CLSD SMPT-MS$13 STEAM LEAKAGE OUTSIDE S 10/04/90 - U

900021, s

CONTAINMENT 05/11/94 - U CLSD

900583, I

CLSD l

920001, CLSD SMPT MTA01 MAIN TURS1NE BEARING HIGH S

10/04/90 - U

900581, TEMPERATURE 10/11/91 U CLSD
900582, CLSD l
910310, CLSD SMPT-MTA02 MAIN TURBINE BEARING HIGH S

10/04/90 S; VIBRATION 02/21/91 - S 7 SMPT-MTA03 TURBINE HP VALVE FAILS CLOSED 5 10/04/90 - U

900575, 03/01/92 - S CLSD SMPT-MTA04 MAIN TURBINE TRIP S

10/04/90 - S 02/22/93 - S SMPT-MTA05 STEAM SEAL REGULATOR FAILS S 10/04/90 - S i OPEN 03/09/92 - S i

I 01/25/95 - Page No. 17 '[j ]t - PERFORMANCE TEST PERFORMANCE TEST. TEST TEST HISTORY WORK ORDER TITLE STATUS NUMBER k/; SMPT MTA06 STEAM SEAL REGULATOR FAILS 10/04/90 S CLOSED 09/29/93 - S SMPT MTA07 TURBINE LP VALVE FAILS CLOSED 10/04/90 - S L 02/15/94 - S-SMPT 0GR01 EXPLOSION IN THE OFF GAS U 10/09/90 S

910261, PIPING 02/15/94 - U CLSO 940046,-

CLSD 940211 SMPT 0GR02 WATER IN THE OFF CAS PIP!NG S 10/04/90 S;

910248, 07/29/91 U CLSD SMPT-0GR03 OFF GAS CONDENSER LEVEL HIGH 10/04/90 S 03/26/92 S SMPT-PCIO1 GROUP ISOLATION VALVE S

10/09/90 S; ISOLATION FAILURE 04/17/91 S SMPT PCIO2 PCIS VENT TRIP Coll FAILURE S 10/09/90 S \\ 03/26/92 - S SMPT PCS01 COOLANT LEAKAGE INSIDE THE S 10/04/90 - S PRIMARY CONTAINMENT 09/13/93 - S - SMPT-PCS02 COOLANT LEAKAGE OUTSIDE THE 5 09/14/90 U 900517 PRIMARY CONTAINMENT 05/11/94 - S SMPT PCS03 TORUS-DRYWELL VACUUM BREAKER S 10/04/90 - S; FAILS OPEN 02/22/91 S SMPT PCSO4 DW PRESSURE TRANSMITTER U 10/09/90 U

900668, PT 5 12 FA! LURE 09/20/93 U CLSD 930105 SMPT PCS05 BREAK IN DRYWELL AIRSPACE S

10/11/94 - S SMPT PCS06 BREAK IN TORUS AIRSPACE S 10/11/94 S SMPT-PCS07 BREAK IN TORUS WATER SPACE S 10/07/94 S SMPT PPC01 PLANT PROCESS COMPUTER FAILURE S 10/09/90 S 920110 04/21/92 S OL) I t --s

~ i .j Pese No.- 18. .01/25/95 PERFORMANCE TEST PERFORMANCE TEST. TEST -TEST HISTORY WORK CGER ./ TITLE STATUS NUMBER -L-)'.. t 3 SMPT PRM01 PRM CHANNEL FAILS UPSCALE S 10/09/90 - S:

920064, 03/26/92 U CLSD
920079, CLSD SMPT-PRM02 PRM CHANNEL FAILS DOWNSCALE U

10/09/90 - S

930060, 09/23/93 U CLSD P0108

'730109

930110, CLSD; i

SMPT-PRM03 PRM CHANNEL FAILS INOP U 10/09/90 S

930060,

) 02/15/94 - U CLSD 930108 930109

930110, CLSD 9400A7 940048,-

CLSD \\ SMPT PTOVR PMS POINT OVERRIDE 'S 05/18/94 - S 940149 SMPT-RBM01 RBM CHANNEL Fall UPSCALE S 10/09/90 - S; 07/29/91 - S-i SMPT-RBM02 RBM CHANNEL FAILS DOWNSCALE S 10/09/90 - S 03/03/92 - S SMPT RBM03 RBM CHANNEL FAILS INOP S 10/09/90 - S 02/22/93 - S SMPT RBV01 STEAM TUNNEL VENT!LATION FAN 5 09/10/90 - U.

900430, TRIP 02/17/94 S CLSD SMPT-RBWO1 RBCCW PUMP TRIP S

09/10/90 S; 04/15/91 - S SMPT RBWO2 RBCCW HEAT EXCHANGER TUBE LEAK S 10/09/90 - U

900670, i

02/03/92 - U CLSD

920006, CLSD.

O I 1 I

L. [PepeNo. 19 01/25/95' PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDERi M] TITLE STATUS NUMBER \\], I .SMPT RtWO3 RBCCW NON-ESSTNTIAL LOAD VALVE S 10/09/90 U-900669,- A0-2253 FAILS CLOSED 02/03/92 - S CLSD-05/21/93 - S SMPT'RDWO4 RBCCW HEAT EXCHANGER SERVICE. S 10/10/90 U

900660, WATER FLOW BLOCKAGE 08/03/92 - U CLSD 05/24/93 - S 920210,-

-) 02/16/94 S CLSD l SMPT RBWO5 RSCCW/TBCCW AUTO SWAPOVER S 10/10/90 - S

910106, FAILURE 02/22/91 - U CLSO 02/03/92 - S i

.SMPT-RC101 RCIC TURBINE CONTROL O!L S 10/10/90 - U

900662, PRESSURE LOSS 07/31/91 - S CLSD 03/04/92 - S.
900663, CLSD i
900526, t

CLSD SMPT-RC102 RCIC FAILS TO AUTO START S 10/10/90 - S 09/14/93 - S ( SMPT-RCID3 RCIC TURBINE TRIP S 10/10/90 - S 02/16/94 - S l t SMPT RCIO4 RCIC FLOW CONTROLLER AUTO S 11/14/90 - S; CIRCUIT FAILS LOW 07/29/91 - 5 SMPT RCIOS RCIC FLOW CONTROLLER AUTO S 10/10/90 - U

900662, l

CIRCUIT FAILS HIGH 07/31/91 - S CLSD~ 03/04/92 S

900663, CLSD
900526, CLSD I

SMPT RCIO6 RCIC FLOW CONTROLLER S 10/10/90 - S OSCILLATION 02/24/93 - S ) SMPT RFC01 RECIRC MG FLOW CONTROLLER S 10/10/90 - S FAILS UPSCALE 11/01/93 - S 02/17/94 - S i SMPT-RFC02 RECIRC MG FLOW CONTROLLER S 10/10/90 - S i., ( FAILS DOWNSCALE 04/16/91 - S l' 11/02/93 - S SMPT-RFC03 RECIRC MG FLOW CONTROLLER S 10/10/90 - S ,, s. FAILS AS 1$' 03/09/92 - S i

3 L E 3 d ,sc

Page No. 20-01/25/95-'

- PERFORMANCE TEST . PERFORMANCE TEST' TEST TEST HISTORY' WORK ORDER f (/] ; TITLE STATUS NUMBER L )) 1 11/02/93 - S SMPT RFC04 RECIRC MG FLOW CONTROLLER S 10/10/90 - S-OSCILLATION 02/24/93 - S 11/02/93 S' L! SMPT-RFC05(DELETED)- RECIRC MASTER CONTROLLER X 10/10/90 - S FAILURE SMPT RNR01 RHR PUMP TRIP S 10/10/90 - U;

900775, 02/27/91 - U CLSD
910255, CLSD

. SMPT RHR02 RHR HEAT EXCHANGER TUSE LEAK U 10/10/90 - U

900664, 06/01/91 - U CLSD 03/01/92 - U 910253,'

07/21/92 - S CLSD-i

920046, CLSD 940230 SMPT RHR03 LPCI INJECTION VALVE FAILS S

10/10/90 - S

930111, CLOSED 09/23/93 - U

.CLSD x) SMPT RNR04 RHR PUMP DISCHARGE LINE SREAK S 10/10/90 - S 02/25/94 - S 1 SMPT RMC01 RPIS TOTAL FAILURE-S 10/10/90 S

930113,

[ 09/26/93 - U CLSD SMPi+RMCO2 ROD DRIVE CONTROL TIMER S 10/12/90 - S MALFUNCTION 05/05/94 - S , SMPT RPS01 CONTROL ROD SCRAMS S 10/10/90 - S; 02/20/91 - S SMPT-RPS02 RPS MG OUTPUT BREAKER TRIP S 09/23/90 - S; 07/29/91 - S SMPT RPSO4 CONTROL ROD GROUP POWER FUSE S 10/11/90 - S FAILURE 09/26/" -S - SMPT-RPS05 RPS AUTOMATIC SCRAM CIRCUIT S 10/11/90 - S FAILURE 02/18/94 S SMPT RPS06 CONTROL ROD FAILS TO SCRAM S 10/11/90 - S; 04/16/91 S -f i )

Page No. 21-01/25/95 JPERFORMANCE TEST. PERFORMANCE TEST TEST TEST HISTORY WORK ORDER . IO. TITLE STATUS. NUMBER SMPT RR$01 -RECIRC PUMP DISCHARGE VALVE S .10/11/90 - S FAILURE 03/09/92 S SMPT-RR$02 RECIRC FLOW UNIT FAILS UPSCALE S 10/11/90.- S 05/27/93 - S SMPT RR$03 RECIRC FLOW UNIT FAILS S-10/11/90 - S DOWNSCALE 02/22/94 S i SMPT-RR$04 REC!RC FLOW UNIT FAILS INOP S 10/11/90 - S 02/22/91 - S 11/01/93 - S SMPT-RRS05 RECIRC FLOW UNIT COMPARATOR S 10/11/90 S FAILURE 03/04/92 S SMPT RR506 RECIRC FLOW UNIT OSCILLATION S 10/11/90 - U 05/27/93 S SMPT-RR507 RECIRC PUMP SHAFT SEI2VRE S 10/11/90 S 5 02/23/94 - S. SMPT RR509 RECIRC MG FIELD BREAKER TRIP 10/11/90 - U;

900656, 07/29/91 - S CLSD j

i V i SMPT-RRS10 REC!RC MG INCOMPLETE START S 10/12/90 - S SEQUENCE 03/04/92 - S 1 SMPT RRS11 RECIRC PUMP HIGH VIBRATION S 10/11/90 - U

900657, 04/18/91 - S CLSD 03/04/92 - S SMPT RRS12(DELETED)

RECIRC PUMP SPEED FEEDBACK X 10/11/90 - S SIGNAL FAILURE 05/26/93 - S i SMPT RRS13 REClRC PUMP #1 SEAL FAILURE S 10/11/90 - S 02/22/94 - S I SMPT RRS14 RECIRC PUMP #2 SEAL FAILURE S 10/12/90 - S;

910105, 02/22/91 - U; CLSD 07/31/91 S

SMPT-RRS15 RECIRC PUN' RSCCW FLOW LOSS S 10/12/90 - S

920054, 03/03/92 - U CLSD i

SMPT-RR$16 RECIRC PUMP DW CHILLED WATER S 10/12/90 - S FLOW LOSS 09/22/93 - S j l

i l 'j 'Page No. ~22 01/25/95 .. PERFORMANCE TEST PEkFORMANCE TEST TEST TEST N!$ TORY . WORK ORDER TITLE STATUS'

NUMBER' f

~SMPT-RRS17(DELETED) RECIRC MG CONTROL SIGNAL X 10/12/90 - U;

900651,

{ FAILURE 03/19/91 S CLSD SMPT RRS18 RECIRC LOOP FLOW TRANSMITTER S 10/12/90 - S FAILURE 04/16/93 - S 11/01/93 S SMPT-RR$19 RECIRC JET PUMP R!SER FAILURE S '09/10/90 - U

900559, 09/04/91 - U CLSD q

02/03/92 - S

910289, CLSD '

1 SMPT-RRS20 RECIRCULATION LOOP RUPTURE S 10/17/90 - U

910016, 09/15/93 - S CLSD i
900773, CLSD t

SMPT-RR$21 OlSPLACED JET PUMP MIXER NOT YET IMPLEMENTED SMPT-RRS23 BREAK IN JET PUMP INSTRUMENT S 01/10/95 - S LINE !b SMPT RRS24 THERMAL HYDRAULIC INSTABILITY S 12/06/94 - S l i SMPT-RR$25 REACTOR RECIRCULATION PUMP S 12/06/94 - S + SHAFT FAILURE SMPT-RRS26 REFERENCE LEG FLASHING S 12/23/94 - S SMPT-RRS27 REFERENCE LEG NON-CONDENSIBLE S 12/15/94 - S.- GAS BUILDUP SMPT-RSC01(DELETED) RSCS TOTAL FAILURE -X R G 9EMOVED BY MC' * '.ON IN LOAD V* MCTION WILL i, CVED FROM MENU IN 91 2. SMPT RV101 REACTOR LEVEL TRANSMITTER S 10/12/90 S LT-72 FAILURE 03/18/94 - S SMPT RVIO2 REACTOR LEVEL TRANSMITTER S 10/15/90 - S LT-6-52 FAILURE 07/30/91 - S 10/09/91 - S j' SMPT-RV103 REACTOR LEVEL TRANSMITTER S 10/16/90 - S LT*73 FAILURE 04/15/92 - S i

(19;l " ? + ,,g .Page me. 23 : 01/25/95 TEST HISTORY WORK ORDER tPERFORNRNCE TEST PERFORMANCE TEST -TEST f]' TITLE STATUS NUMBER

J SMPT*Rv!D4 RVP PRESSURE TRANSMITTER S'

'10/16/90 - S PT-6 53 FAILURE '10/09/91 - S 09/27/93 - S - SMPT RVIOS RVP PRESSURE TRANSMITTER PT 55 .S 10/16/90 - 5 FAILURE 03/01/94 - 5 ' SMPT-RVIO6 RVP PRESSURE TRANSMITTER S' 10/16/90 S; PT 404 FAILURE 02/22/91 - 5 SMPT-RV!O7 RVP PRESSURE TRANSMITTER S-10/16/90 - S PT 6 105 FAILURE 10/30/91 - 5 I. 04/15/92 - S SMPT RV108 REFERENCE LINE BREAK-WIDE S 10/16/90 - U

900652, RANGE LEVEL 09/23/93 U CLSD
930112, CLSD l

l SMPT RVID9 REFERENCE LINE BREAK NARROW S 10/16/90 - S

930112, RANGE LEVEL 03/18/94 - U CLSD

. SMPT-RVlio REFERENCE LINE BREAK REFUEL S 10/16/90 - S; RANGE LEVEL 07/30/91 - S SMPT RVill SENSING LINE BREAK NARROW S 10/17/90 S. 920150,' RANGE LEVEL 05/13/92 - U CLSD 05/26/93 S SMPT-RVI12 SENSING LINE BREAK-WIDE RANGE S 10/17/90 - S

920150, LEVEL 05/27/93 - S CLSD SMPT-RVI13 SENSING LINE BREAK-ACTIVE CORE S

10/16/90 - S 920150,- LEVEL 05/28/93 - U CLSD 05/11/94 - U

930042, CLSD SMPT-RWC01 RWCU PUMP TRIP S

10/12/90 - S 02/23/94 - S SMP1 RWC02 RWCU WONREGENERATIVE HEAT S 10/12/90 - U

900650, EXCHANGER LEAK 10/14/91 - U CLSD
910311, CLSD SMPT RWC03 RWCU FILTER DEMIN CLOGGING S

10/12/90 S; 04/16/91 - S

4 4 # I -Page No. 24-01/25/95 PERFORMANCE 1EST PERFORMANCE TEST TEST TEST NISTORY WORK ORDER lf ,j' TITLE STATUS NUMBER ~ - AQ SMPT RWC04-RWCU RESIN DEPLETION S 10/12/90 - S'

920053, f

03/03/92 - U CLSD SMPT RWC05 RWCU DRAIN FLOW CONTROL VALVE S 10/12/90 - 5 FAILURE 03/09/92 S i I ..SMP - WC06 RWCU INLET PIP!NG RUPTURE S 11/07/90 - U 900707 TR 05/20/93 - S CLSD 6

900708, i

CLSD

920134, CLSD
920220,

'i CLSD i SMPT-RnM01 RWM TCTAL FAILURE S 10/15/90 - U

900035, l

05/04/94 - S CLSD SMPT SGT01 STANDBY GAS FAILS TO AUTO S 10/15/90 - S; ~ INITIATE 02/22/91 - S SMPT-SLC01 STANDBY LIQUID PUMP TRIP S 10/15/90 - 5 I 02/22/93 S i SMPT SLC02 SQUIB VALVES FAIL TO FIRE S 10/15/90 - S i 03/03/92 - S SMPT SRM01 SRM CHANNEL FAILS UPSCALE' S 10/12/90 - S i 09/28/93 - S I -SMPT SRM02 SRM CHANNEL FAILS DOWNSCALE S 10/12/90 - S 05/05/94 - S i SMPT SRM03 SRM CHANNEL FAILS IMOP S 10/12/90 S; 04/18/91 S f l SMPT SRM04 SRM CHANNEL DETECTOR STUCC S 10/12/90 - S l 03/09/92 - S { 05/05/94 - S SMPT-SRM05 SRM CHANNEL TETRACT PERMIT S 10/12/90 - S l FAILURE 09/29/93 - S SMPT SRM06 SRM CHANNEL FAILS TO TRIP INOP U 10/12/90 - S 940146 l 05/05/94 - U SMPT-SRM07 SRM CHANNEL FAILS TO TRIP S 10/12/90 - S i DOWNSCALE 04/18/91 - S l Q

nl: 1 i - Pese No. 25 01/25/95 PERFORMANCE TEST PERFORMANCE TEST TEST-TEST HISTORY-WORK ORDER ' [ \\' TITLE . STATUS-NUMBER i \\ c t t SMPT SRM08 SRM CHANNEL FAILS TO TRIP S '10/12/90 - S UPSCALE (HI) 03/09/92 S { ~F SMPT SRM09 SRM CHANNEL FAILS TO TRIP S 10/12/90 .S

930114, UPSCALE (HI HI) 09/28/93 - U CLSD' i

SMPT BWC01 LOSS OF STATOR WATER COOLING 09/18/90 - U' 900540,. FLOW. 04/16/91 S-CLSD i' 03/11/94 S

900456, CLSD i

SMPT SWS01 SERVICE WATER PUMP TRIP S' 10/15/90 - S; f 04/23/91 - S SMPT SWS02 SERVICE WATER PUMP STRUCTURE S 10/17/90 - U

900593, l

GATE FAILS CLOSED 02/13/92 - U CLSD l

900645, l

CLSD.

900646, f

CLSD

900644,

\\ CLSD' SMPT TBWO1 TBCCW PUMP TRIP S 08/27/90 - U 07/31/91 S l' 02/25/93 - S SMPT TBWO2 TBCCW HEAT EXCHANGER TUBE LEAK S 10/17/90 - U

900654, l

~ 03/01/94 S CLSD

900642, CLSD SMPT TBWO3 TBCCW HEAT EXCHANGER SERVICE S

10/17/90 - S

910102, i

WATER BLOCKAGE 02/21/91 - U CLSD l 02/11/92 - S SMPT-TBWO4 (DELETED) TBCCW VALVE A0-2352 FAILS 70 X 10/17/90 - U

900640, REPOSITION CLSD
900084, CLSD
910316, CLSD 1

SMPT flP01 TIP DETECTOR STUCK S 10/17/90 - U

900647, 09/21/93 - U CLSD b'-

G i

3

)

i i Pete No. ; 26 ' 01/25/95 [.. }l' ' PERFORMANCE TEST-TEST' . TEST HISTORY - WDRC ORDER-' PEAFORMANCE TEST- ' TITLE, STATUS ~ . NUMBER: l{ - Q, - i ~

,j i

.SMPT TIP02 TIP IN CORE GUIDE TURE RUPTURE 5 10/17/90'- U,

900643, 04/17/91 - S CLSD 03/02/94 - 5 SMPT VAC01A 480 VAC BUS AS4 FAULT S

10/21/90 - U; 900630,. 07/30/91 - U CLSD

900631, CLSD-

[

900632, CLSD 9=629, CLSD j
910249, i

CLSD SMPT VAC018 480 VAC BUS BS4 FAULT S .10/21/90 - U

900627, 04/17/91 - S CLSD

[ 03/11/92 - S

900628, CLSD i

SMPT VAC01C 480 VAC BUS A14 FAULT. 'S '10/22/90 - U

900609, i

10/20/93 - S CLSD

900626, CLSD

+ SMPT VAC01D 480 VAC BUS 814 FAULT S .10/22/90 - U 900607,' 08/02/91 - S CLSD 03/22/94 - S l SMPT VAC01E 480 VAC BUS A24 FAULT S 10/22/90 - U

900609, 10/14/91 S

CLSD I

900625, CLSD i

f SMPT VAC01F 480 VAC BUS B24 FAULT S 10/22/90 - U

900608, 03/11/92 - S CLSD
900624, i

CLSD l 6 SMPT-VAC01G 480 VAC BUS A34 FAUL1 S 10/22/90 - U

900609, l

10/20/13 - S CLSD t

900622, f

CLSD i 1

... ~. i [PageNos 27 01/25/95 l ' PERFORMANCE TEST ' PERFORMANCE TEST -TEST TEST HISTORY ' WORK ORDER -l pY: TITLE STATUS -NUMBER jv. 'SMPT-VAC01H 480 VAC BUS B34 FAULT S 10/22/90 - U 900608,. 10/20/93 - S CLSD 900623,. j CLSD 'SMPT VAC011 480 VAC BUS 1R4 FAULT S 10/22/90 U 900458,- 07/30/91 - S CLSD

900606, CLSD

.l

900621, 3

CLSD f SMPT VAC01J 480 VAC BUS 2R4 FAULT S 10/22/90 - U

900458, 03/11/92 - S

'CLSD .900620,, l i.- CLSD i SMPT VAC01K 480 VAC BUS 1G4 FAULT S 10/22/90 - U

900458,

[ 10/21/93 S CLSD. l

900611, t

CLSD SMPT VAC01L 480 VAC BUS 2G4 FAULT S 10/22/90 U 900458,- 04/27/94 - S CLSD

900619, CLSD i

SMPT VAC01M 480 VAC BUS 1T4 FAULT S 10/22/90 U

900458, t

10/14/91 - S CLSD I

900617, j

CLSD

900618, CLSD SMPT VAC01N 480 VAC BUS 2T4 FAULT S

10/22/90 - U

900458, 03/12/92 - S CLSD
900605, CLSD i

SMPT-VAC010 480 VAC BUS 1PS4 FAULT S 10/22/90 - U

900458, 11/04/93 - S CLSD
900615, i

-l t i i

~

b.i y4-Page No. 28 ~

~01/25/95- ' PERFORMANCE TEST PERFORMANCE TEST TEST-TEST HISTORY'. WORK ORDER [ .T!TLE~ STATUS ' HUISER. sj Cwo 900616,. .j CLSD-i SMPT VAC01P 480 VAC BUS 3PS4 FAULT S 10/22/90 U

900614, l

03/19/91 - S CLSD. ~ 04/19/94 - S ~ SMPT VAC010 480 VAC SUS 2PS4 FAULT S 10/23/90 U. 900458,. .l . 07/30/91 - S-CLSD. 900613,- CLSD. -l 'SMPT VAC01R 480 VAC SUS 4PS4 FAULT S 10/23/90 - U

900458, 03/11/92 - S CLSD i
900612,

'f . CLSD SMPT VAC02A 480 VAC EMERGENCY BUS E124 5 10/23/90 - U 900778,. FAULT 10/20/93 - S CLSD

900765, 0

CLSD \\ SMPT VAC028 480 VAC EMERGENCY BUS E224 S 10/23/90 - U

900778, FAULT 05/02/94 - S CLSD
900765, CLSD t

-SMPT-VACO2C 480 VAC EMERGENCY BUS E324 5 10/24/90 U

900778, l

FAULT 07/30/91 S CLSD

900765,

.CLSD SMPT-VACO2D 480 VAC EMERGENCY BUS E424 S - 10/25/90 - U

900778, FAULT 03/26/92.- S CLSD
900765, CLSD-(

SMP1 VACO2E 480 VAC EMERGENCY BUS E13A4 S 10/25/90 - U

900634, FAULT 07/30/91 - S

-CLSD 10/20/93 S

900778, CLSD
900765, nw I

i w

N i) ? Pese No. 29 01/25/95 ' PERFORMANCE TEST-PERFORMANCE TEST-TEST TEST HISTORY WDRK ORDER [% TITLE STATUS NUMBER L n 'k.f-t: =SMPT VAC02F 480 VAC EMERGENCY BUS E23A4 S 10/25/90 U

900634, FAULT 03/22/94 U

'CLSD

900778, CLSD
900765, CLSD
940082, l'-

CLSD l SMPT*VACO2G. 480 VAC EMERGENCY BUS E43A4 S 10/25/90 U;

900778, FAULT 07/30/91 - S CLSD
900765, CLSD SMPT VACO3A (DELETED) 480 VAC MCC AS 4-A1 FAULT X

10/30/90 S

910088, CLSD SMPT VAC03A1-480 VAC MCC 3PS4-W-C FAULT S

10/30/90 - S

930137, 11/04/93 - U CLSD SMPT-VAC03AA 480 VAC MCC E424-T-B FAULT U

10/25/90 - U

900733, 04/18/91 - U CLSD.

07/31/91 - U

900732,

.j 04/19/94 - U. CLSD j

910251, 1

CLSD 940095 SMPT-VACO3B (DELETED) 480 VAC MCC AS4-S-A2 FAULT X 10/30/90 - S;

910088, l

02/27/91 - S CLSD 1 1 SMPT VACO381 480 VAC MCC 3PS4 F-B FAULT S 10/30/90 S l 03/12/92 - S SMPT VAC038B 480 VAC MCC E424-0-A FAULT S 10/25/90 - U

900730, 03/19/91 - S

~ CLSD 11/03/93 U

930131, CLSD l

SMPT VAC03C (DELETED) 480 VAC MCC AS4 5-A FAULT X 10/30/90 - S

910088,

.] CLSD SMPT VAC03C1 480 VAC MCC 3PS4 M A FAULT 10/30/90 - U

900614, 10/14/91 - S CLSD O

\\ PeBe No. 30 01/25/95 PERFORMANCE TEST PERFORMANCE TEST' TEST TEST HISTORY WORK ORDER './^( TITLE STATUS NUMBER . ( ) s ' SMPT VAC03CC 480 VAC MCC 1R4-R t FAULT S 10/30/90 - S 03/12/92 - S SMPT VAC030 (DELETED) 480 VAC MCC BS4 S-At FAULT x .10/30/90 - S

910088, CLSD SMPT VAC03D1 480 VAC MCC 3PS4-V-A FAULT

'S 10/30/90 - U

900695, 04/19/94 - S CLSD i

f' SMPT VACO3DD 480 VAC MCC 1R4-T-A FAULT S 10/30/90 - U

900621, 07/30/91 - S CLSD SMPT VACO3E (DELETED) 480 VAC MCC B$4 S-A21 FAULT X

10/30/90 - S

910088, CLSD SMPT VAC03E1 480 VAC MCC 4PS4-W-B FAULT 10/30/90 S 11/03/93 S SMPT VACO3EE 480 VAC MCC 2R4-R-B FAULT S

10/30/90 S 04/19/94 - S 1 ,SMPT VACO3F 480 VAC MCC BS4 C-A FAULT S 10/30/90 S; C\\ 04/16/91 - S I b SMPT-VACO3F1 480 VAC MCC 4PS4-U-C FAULT S 10/30/90 - U

900694, 03/02/92 S CLSD
900692, CLSD SMPT-VACO3FF 480 VAC MCC 2R4-T A FAULT S

10/30/90 - S' 11/03/93 - S r SMPT VAC030 480 VAC MCC B24 C-A FAULT S 10/30/90 - S 03/22/94 S SMPT VAC03G1 480 VAC MCC 4PS4*F-B FAULT S 10/30/90 - S; 02/27/91 - 5 'SMPT-VAC03GG 480 VAC MCC 1G4-T-D FAULT S 10/30/90 - S 03/12/92 - S SMPT-VAC03H 480 VAC MCC B34-C-A FAULT S 10/30/90 - S

930127, 10/28/93 - U CLSD SMPT-VAC03H1 480 VAC MCC E13A4-EC-A FAULT S

10/25/90 - S 03/22/94 - S A_)

y-. l x r .Page No.. 31 01/25/95 p, PERFORMANCE TEST-PERFORMANCE TEST TESTh TEST HISTORT WORK ORDER h TITLE STATUS NUMBER v SMPT*VACO3HH 480 VAC MCC 1G4 P A FAULT S~ ~ 10/30/90. S; 930140 07/30/91 - S SMPT VACO31 480 VAC MCC A34 Y A FAULT S 10/30/90 - U

900743, 04/18/91 - S -

CLSD 03/23/92 -'s I SMPT VAC0311 480 VAC MCC E23A4 EC-A FAULT S ,10/25/90 - S 11/03/93 - S SMPT VAC0311 480 VAC MCC 1G4 G B FAULT S 10/30/90 - S

910301, i

10/09/91 U CLSD 03/02/92 - S

930124, 05/02/94 S CLSD SMPT VAC03J 480 VAC MCC E124 R-C FAULT

's 10/23/90 U

900639,

.10/14/91 - S CLSD SMPT VAC03J1 480 VAC MCC E43A4-EC-A FAULT S 10/25/90 S 03/12/92 S SMPT VACO3JJ 480 VAC MCC 1G4-T A FAULT S 10/30/90 - S 930125 3, . ) 11/03/93 U CLSD i SMPT-VAC03K 480 VAC MCC E124-T-FAULT S 10/23/90 - U

900763, 04/18/94 - U CLSD -

' i

940093, CLSD SMPT VAC03KK 480 VAC MCC 2G4-R D FAULT-S 10/30/90 - $;

07/30/91 - S i SMPT-VACO3L 480 VAC MCC E124 D A FAULT S 10/23/90 S 03/23/92 - S l SMPT-VAC03LL 480 VAC MCC 2G4-T A FAULT S 10/30/90 - S

940118, 11/03/93 - S CLSD i

'SMPT VAC03M 480 VAC MCC E124-P-A FAULT S 10/23/90 - S

930126, 05/02/94 - S CLSD

-SMPT VACO3MM 480 VAC MCC 2G4-C-B FAULT S 10/30/90 - S; 02/27/91 - S l l SMPT-VAC03N 480 VAC MCC E124-0-A FAULT S 10/23/90 - U

900767, 03/02/92 S CLSD 0

2

m.. 7

j" s*-

4 'page No. "32 01/25/95 ,. gg ' PERFORMANCE TEST PERFORMANCE TEST. TEST TEST HISTORY WORK ORL*R LI y TITLE STATUS. MIMBER - ih [ i I SMPT VAC03NN - ' 480 VAC MCC 2G4-P-A FAULT S 10/30/90iS 930139 ~ i .11/03/93 - S k b SMPT VAC030 480 VAC MCC E224-R-B FAULT '10/23/90 - U

900766, 04/19/94 - U CLSD j
920008,

. CLSD

940096,

'L CLSD ) SMPT-VAC0300' 480 VAC MCC iT4 T C FAULT S. 10/30/90 - S; 07/30/91 - S SMPT VAC03P '480 VAC MCC E224-T B FAULT S 10/23/90 - S 03/12/92 - S f SMPT VAC03PP 480 VAC MCC 1T4 T-B FAULT S 10/30/90 - U.

900617, f

11/03/93 - S CLSD 930136 '[% -f / SMPT-VAC030 480 VAC MCC E234 D-A FAULT S 10/23/90 - S f 03/22/94 - S -) i SMP.-VAC0300 480 VAC MCC 2T4-T-C FAULT S 10/30/90 - S;_ 04/18/91 - S SMPT-VAC03R 480 VAC MCC E224-P-A FAULT S 10/23/90 - U

900764,

'I 03/23/92 - U CLSD' 'l

920080, CLSD l

5 SMPT-VAC03RR 480 VAC MCC 2T4-T-B rAULT S 10/30/90 - S 11/04/93 - S [ .SMPT VAC035 480 VAC MCC E324 R-B FAULT S 10/23/90 - U-

900762,

-l 04/18/94 - S CLSD SMPT VACO3SS 480 VAC MCC 2PS4 F B FAULT S 10/30/90 - S; 07/30/91 - S I SMPT-VAC03T 480 VAC MCC E324-R-D FAULT S 10/24/90 - S 9200T/, l 03/23/92 - U CLSD f 1 i i i I 1 l

7' r P Pese no. '33 '01/25/95 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER 5[ \\' TITLE ~ STATUS NUMBER )% SMPT VAC03TT 480 VAC MCC 2PS4 U-C FAULT S 10/30/90 - s 11/04/93 - S .i SMPT VAC03U 480 VAC MCC E324 D-A FAULT S 10/24/90 - S j 03/22/94 - S SMPT VACO3UU 480 VAC MCC 2PS4-W-B FAULT S 10/30/90 S; j 02/27/91 - $ f fSMPT VACO3V 480 VAC MCC E324 T-B FAULT S 10/24/90 - U

900760,

'i 03/19/91 S CLSD I 04/18/91 - S

920076, 03/23/92 - U..

CLSD t SMPT VAC03VV 480 VAC MCC iPS4-V A FAULT S 10/30/90 - U

900615, 10/28/93 - U CLSD
930128, CLSD SMPT-VACO3W 480 VAC MCC E324-0-A FAULT S

10/24/90 - S 03/22/94 - S 'SMPT VAC03WW 480 VAC MCC 1PS4-W-C FAULT' S 10/30/90 - S;

910250, N

07/30/91 - U CLSD SMPT VAC03X 480 VAC MCC E424-W-A FAULT S 10/24/90 - U

900759, 03/23/92 - S CLSD
940100, CLSD SMPT VACO3XX 480 VAC MCC 1PS4-C B FAULT S

10/30/90 - S l 10/28/93 - S SMPT-VAC03Y 480 VAC MCC E424-R 0 FAULT S 10/25/90 - U

900733, 07/31/91 - U CLSD 04/18/94 - U
910252, CLSD 940092 SMPT VAC03YY 480 VAC MCC iPS4 M-A FAULT S

10/30/90 - S; 02/27/91 - S- 'l t SMPT VAC032 480 VAC MCC E424 0-A FAULT S 10/25/90 - S

940147, 03/23/92 S CLSD 6

n. l~ l 1 ..-r i = e

.4. Pese No. 34 01/25/95 ' PERFORMANCE TEST PERFMMANCE TEST TEST TEST HISTORY WDRK ORDER g '. TITLE . STATUS NUMBER ~/. %,); \\ SMPT VACO3ZZ' 480 VAC MCC 3PS4-0 S FAULT S -10/30/90.- s 10/28/93 -'S - SMPT VAC04A-120 VAC INSTRUMENT PANEL' FAULT S '09/13/90 U

900666, 10/09/91 - U CLSD 04/28/94 - U
920005, CLSD
940114, CLSD'
940115, CLSD
940139,

.I CLSD-SMPT-VAC04B 120 VAC INSTRUMENT PANEL FAULT S 10/28/90 - U

900742, 08/16/91 -U CLSD l
900750, j

CLSD ]

900748, 4

CLSD I

910275, CLSD
930068, CLSD SMPT VAC04C 120 VAC INSTRUMENT PANEL FAULT S

10/29/90 - U

900754, 03/12/92 - U CLSD
900753, CLSD
900751, CLSD
900749, CLSD
900752, CLSD
920063, CLSD
920139, CLSD
930064, CLSD SMPT-VAC04D 120 VAC INSTRUMENT PANEL FAULT S

10/29/90 - U

900755, 07/20/92 - S CLSD 11/08/93 - S
900756, CLSD 930144 x

_. ~ _ _m j j 'Page No. 35 - 01/25/95 PERFORMANCE TEST PERFORMANCE TEST' TEST TEST HISTORY WORK ORDER TITLE STATUS NUMBER-(. SMPT VAC04E 120 VAC INSTRUMENT PANEL FAULT S 10/29/90 - U

900757, l

.04/16/91 - U CLSD l 08/08/91 U

910259, j

05/27/93 - S CLSD l 05/02/94 - S

920179, l

CLSD l 940143 SMPT-VAC04F 120 VAC INSTRUMENT PANEL FAULT S -10/29/90 - U

900758, l

08/16/91 U CLSD

900727, l

CLSD mm, CLSD .i l 910276,. n2

930061, CLSD l

l ~i SMPT VED01 MOTOR OPERATED VALVE MAGNETIC S M/11/94 - S OVER CURRENT TRIP ' } t ~ f l l t t l I i ' l i f -l 1 i i I l' 1 l i i i I t

1 O h EXHIBIT 3 l Simulator Performance Test Report - O Computer Performance, Steady State and Normal Operation, and Transient Performance Tests 4 \\ l 1 \\

..y.. . _ -. _ i s PEACM SOTTOM ATOMIC POWER STATION UNIT 2' SIMULATOR. S!ftiLATOR PERFORMANCE TESTS REPORT l 4 The Sisulator Performance Tests are proged Into four categories: SCPT, Slaulator Computer Performance Tests i SSPT, Slautator Steady-State and Normal Operation Tests - - SMPT, $1mulator Malfunction Performance Tests ? STPT and ShPTT, $1mulator Transient Performance Tests ( The tests required to demonstrate acceptable $1mulator Performance are Identified, prepared,' and tested against the acceptance criteria described in ANSI /ANS 3.5-1965. The listing below tabulates att the Simulator Performance Tests performed for Simulator Certification, [ their current status (S satisfactory, U unsatisfactory, X-deleted), the detes the tests were completed with test results, and any simulator work orders generated against the test. "Ctsda following a work order number Indicates that the wor

  • order has been resolved and

.la closed. For those tests which have an open work order against them, the training (spect I has been assesed. Those tests with discrepancy having trefning impact are considered [ unsatisfactory. -{ Page No. 1 01/19/95 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER TITLE STATUS NUMBER I V i SSPT* NEAT BALANCE SIMULATOR NEAT SALANCE TEST AT U 01/05/91 - U

910031,

_i APPROM.100%, 50%, AND 25% 10/14/91 - U CLSD POWER 07/26/92 - U

910032, 11/11/93 - U CLSD 06/02/94.- U
910033, f

CLSD .i

910290, l

CLSD 1

910329,

[ CLSD l

910330, CLSD
910331,

{ CLSD l 920096 + 920186 920189 920190 930145 SMPTT IPM02 MSIV CLOSURE WITH FAILED OPEN S 01/05/91 - S

900126, SRV AND NO HP ECCS 07/22/91 S

CLSD t 02/03/92 - S

920010, J

05/03/93 - U CLSO. i i 1 i / i

'hd ^ D il e+ >1 Pese. No. : ; 2 01/19/95 hj ' PERFORMANCE TEST. PERFORMANCE TEST.- TEST ~- TEST HISTORY WORK ORDER ~ Y,: "[ TITLE-STATUS IR8WER h l 01/26/94 - U ' 930026, t y CLSD 4

940034, i

CLSD

940035, l

-CLSD j 960036,. ) CLSD-j t STPT IPM03 ANTICIPATED TRANSIENT WITHOUT-S 01/06/91 - U

910023, SCRAM 08/17/91 - S CLSD l

?! 02/09/92 - S 05/04/93 - S 05/24/94 - S STPT MANUAL SCRAM $1MULATOR TRANSIENT S 01/05/91 - S-

930147, PERFORMANCE TEST MANUAL SCRAM 07/23/91 - S CLSD j

02/02/92 - S-04/26/93 - S ' 05/17/94

  • U STPT MAT 1843J RFPT TRIP FROM ~ 74.4% POWER S

03/11/92 - S. 11/16/93 + S I 05/31/94 - 5 STPT MAT-1843JA RFPT TRIP FROM ~ 90.0% POWER S 03/05/92 - S

910017,

'i 11/15/93 - S CLSD 06/08/94 S r -STPT MAT-1843K CONDENSATE PUMP TRIP WITH S 03/03/92 S

910017, RECIRC RUNSACK FROM ~ 92%

11/15/93.- S CLSD POWER 06/09/94 - S STPT-MAT 1843L RECIRCULATION PUMP TRIP FROM ~ S 03/11/92 S

910018, 96% POWER 11/15/93 - U CLSD 05/27/94 - U
910022,

[ CLSD

930147, CLSD STPT MFS02 SIMULTANEOUS TRIP OF ALL 01/05/91 S l

FEED PUMPS 08/17/91 - S } 02/03/92 - S [ 05/05/93 - S 05/20/94 - S l STPT MSS 02 MAX UNISOLABLE STEAM LINE S 01/06/91 - U

910012, RUPTURE 08/17/91 - U CLSD 07/01/92 - U
910013, 05/17/93 - U CLSD C

r l )

- ~ ~ - . -,.,. 7 . ~ ~- A g 'S t Pese No,'.~ 3 01/19/95 PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY - WORK ORDER i'I / TITLE STATUS NUMBER I 05/18/94 - U

910015, CLSD -

- 910306, . 1 Cl SD

910307,

] CLSD . I STPT-MSS 06* ' $1MULTANEOUS CLOSURE OF ALL S 01/06/91 - U

900587, i

MSIV's 08/17/91 U CLSD; t 02/03/92 - S

910014, I'

05/03/93 - U CLSD 05/19/94 - U

910168, CLSD
920010,

] CLSD

930026, CLSD
940036, CLSD i

4 STPT MTA04 TURBINE TRIP WITHIN BTPASS S 01/01/91 - U.

910021, VALVE CAPACITY OP/17/91 S CLSD i

O OJ2/92 - S l .V 1s/16/93 - S l 05/25/94 - 5 "TPT-PWRRAMP MAX RATE POWER RAMP FROM 100% S 01/05/91 - S 70 75% TO 1001 08/18/91 - S 02/09/92 S l' 05/07/93 - S 05/27/94 - 5 SMPTT-RRSOS RECIRC MG DRIVE MOTOR BREAKER S 01/05/91 - U

910023, TRIP 07/25/91 - U CLSD 02/03/92 - S
900656, 04/26/93 U CLSD 05/17/94 - S.
910246, CLSD
910018, CLSD
910022, CLSD l

,STPT-RR$08* SIMUTANEOUS TRIP OF ALL RECIRC S 01/06/91 U

910023, PUMPS' 08/16/91 - U CLSD f

01/12/92 - S

900656, y

04/26/93 - U CLSD 05/23/94 - U

910246, CLSD

} N c-.,

S PaBe No. 4.' -01/19/95 ~ PERFORMANCE TEST PERFORMANCE TEST TEST TEST HISTORY WORK ORDER f~ ') TITLE . STATUS NUMBER 3]~

920153, CLSD
940176, CLSD STPT-RRS20 MAX RECIRC SUCTION BREAK WITH 01/06/91 U
910016, LOP 07/25/91 - U CLSD 02/03/92 U 910245,'

05/18/93 - U CLSD 05/25/94 - U

910278, CLSD
920009, CLSD SCPT-RT001 SIMULATOR COMPUTER REAL TIME 01/05/91 - S
910277, TEST 08/17/91 - U CLSD 03/23/92 - S 11/17/93 - S 06/02/94 S STPT SP 1230 RECIRCULATION RUNBACK x

01/05/91.- U

910017, (DELETED) 09/25/91 - U CLSD REPLACED BY STPT-MAT-1843K STPT-SP 1231 RECIRCULATION PUMP TRIP X

01/05/91 - U

910018, (DELETED) 10/14/91 - U CLSD REPLACED BT
910022, STPT-MAT 1843L CLSD
910023, CLSD

~STPT-SP-1232 REACTOR FEEDWATER PUMP TRIP X 01/05/91 - S (DELETED) 09/19/91 - S REPLACED BY STPT-MAT 1843J STPT-SP 1233 TURBINE TRIP WITHIN BYPASS S 01/05/91 - S VALVE CAPACITY 09/23/91 - S 03/02/92 S 11/16/93 S 05/25/94 - S $$PT STABILITY / MASS BAL-SIMULATOR STABILITY AND MASS S 01/05/91 S

910290, BALANCE TEST 09/16/91 - S CLSD 05/18/92-- S 11/17/93 - S 05/26/94 - S O

i .I l -Fase No..' 5 01/19/95' i PERF0m44NCE TEST PERFORMANCE TEST . TEST-TEST HISTORY WORK ORDER' -l TITLE STATUS- . NUMBER v l'.. STPT UPSET 2 85 07 PLANT UPSET REPORT # 2-85-07L 02/09/92 - U

920010, LOSS OF FEEDWATER AND MSIV 04/26/93 - U CLSD

' CLOSURE 05/12/94 U 920012,- l CLSD-I

960036,-

') CLSD r i ( -i 5 l + P l r .. ] r l h 1 -) I i ~l 'I ,i 1 ?

L g EXHIBIT 4 Simulator Performance Test Schedule - O Malfunction Tests 6

.y - PEACH BOTTOM' ATOMIC' POWER' STATION f ~ UNIT 2 SIMULATOR 3 PERFORMANCE TEST; SCHEDULE j q-.. .q .These Simulator Performance Tests are' schedule to be con-ducted during the. year indicated.in addition to the Annual. 1 ([ y jj . Performance Tests.- ' 01/.03/95 Pags No.- 1 ? . The-Simulator: Performance Tests listed below are-to be'per-formed during calendar year: 1995 PERFORMANCE TEST l PERFORMANCE TEST TITLE ~ ADS 01 . ADS CHANNEL FAILS.TO INITIATE SMPT ADSO2 RUPTURE IN SRV DOWNCOMER IN-l SMPT TORUS AIRSPACE. i APR02 APRM CHANNEL FAILS DOWNSCALE SMPT - - APR05' APRM FAILS TO '1 RIP ' DOWNSCALE. SMPT ARI141 ARI ISOLATION / EXHAUST VALVE' SMPT 141 FAILURE ARM 02 ARM CHANNEL FAILS DOWNSCALE i SMPT f SMPT ~ CAS01 LOSS OF INSTRUMENT AIR t .l CRH03 CRD HYDRAULIC PUMP TRIP SMPT SMPT ' CRH06 CRD STABILIZING VALVE FAILS { CLOSED CRH08 SCRAM DISCHARGE VOLUME LEVEL SMPT HIGH CRH12 SCRAM DISCHARGE VOLUME DRAIN l SMPT VALVE FAILS CLOSED i CRM03 CONTROL ROD UNCOUPLED SMPT. i CSS 02 CORE SPRAY INJECTION VALVE ( SMPT FAILS.TO AUTO OPEN '( l CWS06 TRAVELING SCREEN BLOCKAGE j SMPT i SMPT - DCD01C 250 VDC DIST.. PANEL 20D07 l FAULT-DCD02B 125 VDC DISTRIBUTION PANEL-SMPT 2 PPA FAULT DCD03B' 24 VDC DISTRIBUTION PANEL BUS SMPT 2F-FAULT DCWO4 DWCW LEAKAGE INSIDE THE SMPT DRYWELL SMPT ECWO1 ECW PUMP TRIP 3 y,y-> am-, e _..,_a- ,--y., ,--r. g, g p, _., .+. n e se-

m m I 01/03/95.~ -P ga'No. 2 The Simulator' Performance Tests listed'below are'to be per- .fp -formed during. calendar year:. 1995 . PERFORMANCE TEST- ' PERFORMANCE TEST TITLE ~ SMPT- - EHH03 BYPASS VALVE STICKD OPEN SMPT - EHLO3 PRESSURE REGULATOR OSCILIATION ' SMPT 'ESD02 FW HEATER LEVEL CONTROL VALV" FAILS OPEN SMPT .FCR01 FUEL CLADDING FAILURE SMPT - FCR02 INCREASED CONTROL ROD WORTH' SMPT - FWC07 FWC FUNCTION GENERATOR FAILS LOW 'SMPT - HPC01 FAILURE OF HPCI TO AUTO STARTL SMPT - HPC05 HPCI FLOW CONTROLLER ~ FAILS HIGH SMPT - HPC09 HPCI LUBE OIL SYSTEM FAILURE -SMPT - IPM03 ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS) SMPT - IDM04 FIRE _IN_THE REMOTE SHUTDOWN (. PANEL SMPT - IRM04 IRM CHANNEL DETECTOR SRUCK I i' .SMPT - LPR02 LPRM FAILS DOWNSCALE SMPT - MAP 05 STARTUP SOURCES BUS FAULT SMPT - MAP 07C 4.16 KV EMERGENCY BUS 212 (20A17) FAULT SMPT - MAP 07G 4.16 KV EMERGENCY BUS E-33 FAULT i SMPT - MCS02 HOTWELL LEVEL TRANSMITTER -l FAILS HIGH SMPT MCS06 CONDENSATE DEMIN RESIN DEPLETION. SMPT - MFS02 REACTOR FEEDWATER PUMP HIGH VIBRATION SMPT - MFS06 FEEDWATER HEATER TUBE LEAK SMPT - MGA02 VOLTAGE REGULATOR FAILS HIGH 'h SMPT - MGA06 GENERATOR FIELD BREAKER FAILS ,d TO CLOSE SMPT - MLOO2 MAIN SHAFT OIL PUMP FAILURE

~ m-, }.i ~ 01/03/95 .Paga.No. < The' Simulator Performance Tests listed below are to be per-

  1. 3

. formed during calendar. year: 1995' V PERFORMANCE TEST PERFORMANCrj TEST TITLE' SMPT - MSSO4 ' MAIN STEAM HEADER-PRESSURE-I TRANSMITTER PT-2184/PT-2185 i FAILURE SMPT - MSS 10 STEAM LEAKAGE IN THE STEAM TUNNEL SMPT - MTA01 MAIN TURBINE BEARING HIGH TEMPERATURE SMPT - MTA02-MAIN TURBINE BEARING HIGH l VIBRATION i i SMPT - OGR02 WATER IN THE OFF GAS PIPING 1 SMPT - PCIO1 GROUP ISOLATION VALVE. ISOLATION FAILURE l l SMPT - PCS03 TORUS-DRYWELL VACUUM BREAKER. i FAILS OPEN SMPT - PCS05 BREAK IN DRYWELL AIRSPACE l St.PT - PCS06 BREAK IN TORUS AIRSPACE Dh SMPT - PCS07 BREAK IN TORUS WATER SPACE SMPT - PPC01 PLANT PROCESS COMPUTER FAILURE SMPT - RBM01 RBM CHANNEL FAIL UPSCALE l SMPT- - RBWO1 RBCCW PUMP TRIP i SMPT - RBWO5 .RBCCW/TBCCW AUTO SWAPOVER FAILURE l l SMPT - RCIO4 RCIC FLOW CONTROLLER AUTO CIRCUIT FAILS LOW SMPT - RFCO2 RECIRC MG FLOW' CONTROLLER i FAILS DOWNSCALE-j SMPT - RHRO1 RHR PUMP TRIP SMPT - RPS01 CONTROL ROD SCRAMS 'l SMPT - RPS02 RPS MG OUTPUT-BREAKER TRIP -] SMPT - RPS06. ' CONTROL ROD FAILS TO SCRAM SMPT - RRSO4 RECIRC FLOW UNIT FAILS INOP. SMPT - RRSO9 RECIRC MG FIELD BREAKER TRIP SMPT - RRS14 RECIRC PUMP #2 SEAL FAILURE 4 1

y 4 01/03/95-pag 3 No. 4 The Simulator Performance Tests listed-belowLare to be per- .l 7'N' formed during. calendar year:' 1995 PERFORMANCE TEST PERFORMANCE TEST TITLE i SMPT - RRS18 RECIRC IDOP FLOW TRANSMITTER-FAILURE c-SMPT - RRS23 BREAK _IN JET. PUMP-INSTRUMENT-LINE SMPT .RRS24 THERMAL HYDRAULIC INSTABILITY SMPT - RRS25 REACTOR RECIRCULATION PUMP SHAFT FAILURE. .{ SMPT - RRS26 REFERENCE LEG FLASHING-1 SMPT' '- RRS27 REFERENCE LEG NON-CONDENSIBLE GAS BUILDUP SMPT - RVIO2 REACTOR LEVEL TRANSMITTER LT-6-52 FAILURE SMPT - RVIO6 RVP PRESSURE TRANSMITTER PT-404 FAILURE SMPT - RVIl0 REFERENCE-LINE BREAK-REFUEL-RANGE LEVEL SMPT - RWCO2 RWCU NONREGENERATIVE HEAT j EXCHANGER LEAK SMPT - RWC03 RWCU. FILTER DEMIN CLOGGING .j SMPT - SGT01 STANDBY GAS FAILS TO AUTO INITIATE SMPT - SRM03 SRM CHANNEL-FAILS.INOP l SMPT - SRM07 SRM CHANNEL FAILS TO TRIP-DOWNSCALE l SMPT - SWS01 SERVICE WATER PUMP TRIP 1 SMPT - TBWO3 TBCCW HEAT EXCHANGER SERVICE WATER BLOCKAGE SMPT - VAC01A 480 VAC BUS-AS4 FAULT SMPT - VAC01E 480 VAC BUS A24 FAULT SMPT - VAC01I 480 VAC BUS 1R4 FAULT t SMPT - VAC01M 480 VAC BUS 1T4 FAULT i SMPT - VAC01Q 480 VAC BUS 2PS4 FAULT O SMPT - VACO2C 480 VAC EMERGENCY BUS E324 j FAULT i

s .,.Y 3,f 7e 01/03/95 ~ .Paga No. .5 The Simulator Performance Tests listed.below are to be per-7,yN formed during calendar year: 1995. 4'y - 1 1s PERFORMANCE TEST PERFORMANCE-TEST TITLE-SMPT - VACO2G 480 VAC EMERGENCY BUS E43A4 FAULT SMPT - VAC03C1 480:VAC MCC-3PS4-M-A FAULT SMPT - VACO3DD 480 VAC MCC 1R4-T-A FAULT SMPT - VACO3F 480 VAC MCC BS4-C-A FAULT l - SMPT - VACO3G1 480 VAC MCC 4PS4-F-B FAULT- ' SMPT - VAC03HH 480.VAC'MCC 1G4-P-A FAULT SMPT - VACO3J 480 VAC MCC E124-R-C FAULT SMPT - VACO3KK-480 VAC MCC 2G4-R-D FAULT SMPT - VAC03MM 480 VAC MCC 2G4-G-B FAULT SMPT - VAC03OO' 480 VAC MCC 1T4-T-C FAULT' SMPT - VACO3QQ 480 VAC MCC 2T4-T-C FAULT SMPT - VAC03SS 480 VAC MCC 2PS4-F-B FAULT SMPT - VAC03UU 480 VAC MCC 2PS4-W-B' FAULT SMPT - VACO3WW 480 VAC MCC 1PS4-W-C FAULT SMPT - VACO3YY 480 VAC MCC 1PS4-M-A FAULT SMPT - VAC04B 120 VAC INSTRUMENT PANEL FAULT SMPT ' - VAC04F 120 VAC INSTRUMENT PANEL FAULT The Simulator Perfurmance Tests' listed below are to be per-formed during calendar year: 1996 PERFORMANCE TEST PERFORMANCE TEST TITLE. SMPT - ANN 01 CONTROL ROOM ANNUNCIATOR SYSTEM FAILURE SMPT - APR03 APRM CHANNEL FAILS INOP SMPT - APR06 APRM FAILS TO TRIP INOPERATIVE ' SMPT - ARI142 ARI EXHAUST VALVE 142 FAILURE SMPT - ARM 03 ARM CHANNEL FAILS INOP SMPT - CASO2 INSTRUMENT NITROGEN RECEIVER-LEAK

-01/03/95 Pogs No. 6- 'The Simulator. Performance Tests listed below are to be per- ~ formed during calendar year:- 1996 Vi PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT .CRH04 CONTROL ROD DRIFTS IN SMPT - CRH07 LOSS OF AIR PRESSURE TO CRD HCU'S SMPT - CRH09 SCRAM DISCHARGE VENT VALVE FAILS'OPEN SMPT - CRH13 CONTROL ROD GROUP FAILS TO SCRAM .SMPT - CRM04 CONTROL ROD RPIS FAILURE SMPT - CWS01 LOSS ~OF CONOWINGO POND SMPT - CWSO4 COOLING TOWER LIFT PUMP TRIP SMPT - CWS07 TRASH RACKS BLOCKAGE SMPT - DCD01D 250 VDC DIST. PANEL 20D08 FAULT SMPT - DCD02C 125 VDC DISTRIBUTION PANEL 2PPC FAULT f SMPT - DCWO1 DW CHILLER WATER PUMP TRIP SMPT - DGA01 DIESEL GENERATOR FAILS TO l START SMPT - ECWO2 ECW COOLING FAN TRIP SMPT - EHH04 EHC HYDRAULIC-PUMP TRIP SMPT - EHLOS LOAD SET FAILURE SMPT - ESD03 FW HEATER LEVEL CONTROL VALVE FAILS CLOSED SMPT - FPS 01 CARDOX INJECTION TO THE DIESEL GENERATOR ROOM SMPT - FWC04 FW FLOW TRANSMITTER FT-50 FAILURE SMPT - FWCOB FEEDWATER PUMP MGU 120 VAC POWER LOSS SMPT - HPCO2 HPCI SPURIOUS AUTO START SMPT - HPC06 HPCI FLOW CONTROLLER OSCILLATION SMPT - HPWO1 HPSW PUMP TRIP SMPT - HSOO1 HYDROGEN SEAL OIL PRESSURE DECREASE

1 i

01/03/95 Pag 2;No..

'7 4 I The Simulator' Performance Tests listed below'are to be.per-r} formedLduring calendar year:- 1996 . PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT. - IRM01 IRM CHANNEL FAILS UPSCALE SMPT "- IRM07 IRM CHANNEL FAILS TO TRIP l' UPSCALE'HI i SMPT. - IRM08 IRM CHANNEL FAILS TO. TRIP-i UPSCALE (HI HI) SMPT '- LPR01 LPRM FAILS UPSCALE i ~SMPT - MAP 01 MAIN TRANSFORMER COOLING LOSS L SMPT - MAP 02 LOSS OFF-SITE POWER SOURCES SMPT - MAP 06C .13.2 KV BREAKER TRIP' SMPT - MAP 07D 4.'16 KV EMERGENCY BUS E42 (20A18) FAULT q SMPT - MAP 07H 4.16 KV EMERGENCY BUS E-43 FAULT SMPT - MCS03 HOTWELL LEVEL TRANSMITTER FAILS LOW SMPT MCS07 CONDENSATE FILTER /DEMIN RESIN i INJECTION SMPT -~MFS03 REACTOR FEEDWATER PUMP LOSS OF . LUBE OIL SMPT ' - MFS07 LOSS OF AIR TO RFP C DISCHARGE l BYPASS VALVE SMPT - MGA03 VOLTAGE REGULATOR FAILS LOW f SMPT - MGA07 MAIN GENERATOR HYDROGEN LEAK SMPT - MSS 01 STEAM LEAKAGE INSIDE THE PRIMARY. CONTAINMENT r SMPT - MSS 05 MSIV DISC FAILURE-l SMPT - MSS 11 MSL FLOW TRANSMITTER FT-6-51 FAILURE f SMPT - MTA03 TURBINE HP VALVE FAILS CLOSED-SMPT' - MTA05 STEAM CEAL REGULATOR FAILS l OPEN i t SMPT - OGR03 OFF GAS CONDENSER LEVEL HIGH f SMPT - PCIO2 PCIS VENT TRIP COIL FAILURE i

G 1s. 1 01/03/95 . Pag 9 No. 8 The Simulator Performance' Tests listed below are to be per- ! ! 7% ~ formed during calendar year: 1996 PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT - PRM01 PRM CHANNEL FAILS UPSCALE l L. SMPT - RBM02 RBM CHANNEL FAILS DOWNSCALE SMPT - RBWO2 RBCCW HEAT EXCHANGER TUBE LEAK SMPT RCIO1 RCIC TURBINE CONTROL OIL PRESSURE LOSS SMPT - RCIOS RCIC FLOW. CONTROLLER AUTO CIRCUIT FAILS HIGH SMPT. - RFCO3 'RECIRC MG FLOW CONTROLLER FAILS AS IS SMPT - RHR02 RHR HEAT EXCHANGER TUBE LEAK SMPT - RRS01 RECIRC PUMP DISCHARGE VALVE FAILURE SMPT - RRS05 RECIRC FLOW UNIT COMPARATOR FAILURE SMPT - RRS10 RECIRC MG INCOMPLETE START SEQUENCE r SMPT - RRS11 RECIRC PUMP HIGH VIBRATION SMPT - RRS15 RECIRC PUMP RBCCW FLOW LOSS j SMPT - RRS19 RECIRC JET PUMP RISER FAILURE SMPT - RVIO3 REACTOR LEVEL TRANSMITTER I LT-73 FAILURE SMPT - RVIO7 RVP PRESSURE TRANSMITTER PT-6-105 FAILURE SMPT - RVIll SENSING LINE BREAK-NARROW RANGE LEVEL SMPT - RWC04 RWCU RESIN DEPLETION SMPT - RWC05 RWCU DRAIN. FLOW CONTROL VALVE FAILURE i SMPT - SLCO2 SQUIB' VALVES FAIL TO FIRE SMPT - SRM04 SRM CHANNEL DETECTOR STUCK SMPT - SRM08 SRM CHANNEL FAILS TO TRIP UPSCALE (HI) SMPT - SWS02 SERVICE WATER PUMP STRUCTURE GATE FAILS CLOSED i i a t

k~ ? I -n .l a '(01/03/95 1 Paga No.- 9'

l The Simulator Performance Tests listed below-are to be per-

,(>~"y . formed during calendar year: 1996 . PERFORMANCE TEST PERFORMANCE' TEST. TITLE

i i

SMPT - VAC01B 480 VAC BUS BS4 FAULT EMPT - VAC01F 480 VAC BUS B24 FAULT .{ SMPT' - VAC01J' 480 VAC BUS 2R4 FAULT l SMPT - VAC01N 480 VAC BUS 2T4EFAULT- ) SMPT - VAC01R 480 VAC BUS 4PS4. FAULT l 4 -SMPT - VACO2D 480 VAC EMERGENCY' BUS E424 FAULT l SMPT - VAC03B1' 480 VAC MCC 3PS4-F-B FAULT SMPT - VACO3CC-480 VAC MCC 1R4-R-B FAULT i J SMPT - VAC03F1 480 VAC MCC 4PS4-U-C FAULT 1 SMPT - VAC03GG 480 VAC MCC 1G4-T-D-FAULT l i SMPT - VAC03I 480 VAC MCC A34-Y-A FAULT .l SMPT - VAC03J1 480 VAC MCC E43A4-EC-A FAULT ) .SMPT - VAC03L 480 VAC MCC E124-D-A FAULT { SMPT - VAC03N 480 VAC MCC E124-0-A FAULT .{ SMPT - VAC03P 480 VAC MCC E224-T-B FAULT l SMPT - VAC03R 480 VAC MCC-E224-P-A-FAULT 'l SMPT - VAC03T 480 VAC MCC E324-R-D FAULT SMPT - VAC03V 480 VAC MCC E324-T-B FAULT '3MPT - VACO3X 480 VAC MCC E424-W-A FAULT 5 SMPT - VAC03Z 480 VAC MCC E424-D-A FAULT f'! SMPT - VAC04C 120 VAC INSTRUMENT PANEL FAULT The Simulator Performance Tests listed below are to be per-l ' formed during calendar year: 1997 PERFORMANCE TEST PERFORMANCE TEST TITLE i SMPT - ANNO 3 ANNUNCIATOR CRY WOLF (CWA), DEFEAT (DWA) l O SMPT - APR04 APRM CHANNEL AVERAGE CIRCUIT l DEVIATION l a i e i --n., ~w

p

.]

=- i i $,'j: ' 01/03/95 Paga No. 10 j 'The Simulator ~ Performance-Tests.-listed below are to be per-l formed during calendar year: 1997' j M -PERFORMANCE TEST PERFORMANCE TEST' TITLE ~ ARI POWER SUPPLY FAILURE SMPT -- ARIF2 ~ 1 SMPT - ARM 01 ARM CHANNEL FAILS UPSCALE j SMPT ' -1 CARO 1 MAIN' CONDENSER AIR IN LEAKAGE f ~ i SMPT_' - CRH01 FLOW CONTROL VALVE FAILURE. h SMPT --CRH05 CONTROL' ROD ACCUMUIATOR TROUBLE -l E SMPT '- CRH10 SCRAM DISCHARGE VOLUME VENT i VALVE FAILS CLOSED '? SMPT - CRM01 CONTROL ROD DRIFTS OUT SMPT - CRM05 CONTROL ROD SLOW SCRAM TIME. -SMPT - CWS02 MAIN' CIRC WATER PUMP TRIP l f l SMPT - CWS05-COOLING' TOWER FANS TRIP SMPT - DCD01A 250 VDC DISTRIBUTION PANEL 20D12 FAULT 'SMPT - DCD01E 250 VDC DIST. PANEL 20D05 FAULT r SMPT - DCD02D 125 VDC DISTRIBUTION PANEL f 2 PPD FAULT ~j i SMPT - DCD02E 125 VDC' DISTRIBUTION PANEL 2BD306 FAULT, SMPT - DCWO2 DW CHILLED WATER CHILLER TRIP SMPT - DGA02 DIESEL GENERATOR BREAKER AUTO' I CLOSE FAILURE l i SMPT - EHH01 BYPASS VALVE-FAILS OPEN SMPT - EHLO1 PRESSURE REGULATOR-FAILS LOW [, 'SMPT - EHLO6 LOAD RUNBACK FAILS TO TERMINATE t SMPT - ESD04 MOISTURE SEPERATOR DRAIN TANK l LEVEL CONTROL VALVE FAILS j CICSED SMPT - FWC01 RFP M/A CONTROLLER FAILURE SMPT - HPCO3 HPCI TURBINE TRIP SMPT - HPC07 HPCI STEAM SUPPLY LINE BREAK i t i .i

I 01/03/95 Paga-No. 11 The Simulator Performance Tests listed below are to be per- []; formed during calendar year: 1997 PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT - IPM01 LOSS OF ALL AC POWER ] SMPT - IRM02 IRM CHANNEL FAILS DOWNSCALE ) SMPT - IRM06 IRM CHANNEL FAILS.TO TRIP DOWNSCALE SMPT - MAP 03 500 KV CONTROL AIR FAILURE SMPT - MAP 07A 4.16 KV EMERGENCY BUS E12 (20A15) FAULT i SMPT - MAP 07E 4.16 KV EMERGENCY BUS E-13 i FAULT SMPT - MAP 08 4 BUS AUTO TRANSFER SMPT - MCS01 MAIN CONDENSER TUBE LEAKAGE SMPT - MCSO4 HOTWELL LEVEL TRANSMITTER FAILS AS IS SMPT - MCS08 EXHAUST HOOD SPRAY VALVE FAILS CLOSED SMPT - MFSO4 REACTOR FEEDWATER PUMP MINIMUM FLOW VALVE FAILS OPEN SMPT - MFS08 LOSS OS AIR TO RFP BYPASS VALVE CV-2558 SMPT - MGA04 VOLTAGE REGULATOR TRANSFERS TO MANUAL SMPT - MSS 06 MSIV FAILS CLOSED SMPT - MSS 08 REACTOR PRESSURE RELIEF VALVE FAILURE SMPT - MTA04 MAIN TURBINE TRIP SMPT - MTA06 STEAM SEAL REGULATOR FAILS CLOSED SMPT - PCSO1 COOLANT LEAKAGE INSIDE THE I PRIMARY CONTAINMENT SMPT - PCSO4 DW PRESSURE TRANSMITTER PT-5-12 FAILURE SMPT - PRM02 PRM CHANNEL FAILS DOWNSCALE sd SMPT - RBM03 RBM CHANNEL FAILS INOP SMPT - RBWO3 RBCCW NON-ESSTNTIAL LOAD VALVE AO-2253 FAILS CLOSED )

.1. i 01/03/95 Prgs No. 12-w, The Simulator: Performance Tests listed below'are to be per- , ;f_. formed during calendar year: 1997 .j -PERFORMANCE TEST. PERFORMANCE TEST TITLE i 'SMPT - RCIO2= RCIC FAILS ~TO AUTO' START' SMPT - RCIO6 RCIC FLOW CONTROLLER l OSCILLATION j SMPT - RFC04 RECIRC MG FLOW CONTROLLER' OSCILLATION l ~ SMPT - RHR03 LPCI. INJECTION-VALVE FAILS i CLOSED-i SMPT - RMC01 RPIS TOTAL FAILURE l l SMPT - RPSO4 CONTROL ROD GROUP POWER FUSE, FAILURE SMPT - RRS02 RECIRC FLOW UNIT FAILS UPSCALE i SMPT - RRS06 RECIRC' FLOW UNIT OSCILLATION-SMPT - RRS16 RECIRC PUMP DW CHILLED WATER FLOW LOSS j SMPT - RRS20 RECIRCULATION LOOP RUPTURE SMPT - RVIO4 RVP PRESSURE TRANSMITTER PT-6-53 FAILURE SMPT - RVIO8 RE EREN LINE BREAK-WIDE SMPT - RVI12 SENSING LINE BREAK-WIDE RANGE LEVEL SMPT - RWC06 RWCU INLET PIPING RUPTURE SMPT - SLC01 STANDBY LIQUID PUMP TRIP SMPT - SRM01 SRM CHANNEL FAILS UPSCALE SMPT - SRM05 SRM CHANNEL TETRACT PERMIT FAILURE SMPT - SRM09 SRM CHANNEL FAILS TO TRIP UPSCALE (HI HI) SMPT - TBWO1 TBCCW ' PUMP TRIP - SMPT - TIP01 TIP DETECTOR STUCK SMPT - VAC01C 480 VAC BUS A14 FAULT SMPT - VAC01G 480 VAC BUS A34 FAULT i SMPT - VAC01H 480 VAC BUS B34 FAULT .i I m

01/03/95 P gn No. 13 The Simulator Performance Tests listed below are to be per-f'N, formed during calendar year: 1997 PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT - VAC01K 480 VAC BUS 1G4 FAULT SMPT - VAC010 480 VAC BUS 1PS4 FAULT SMPT - VACO2A 480 VAC EMERGENCY BUS E124 FAULT SMPT - VACO2E 480 VAC EMERGENCY BUS E13A4 FAULT SMPT - VAC03Al 480 VAC MCC 3PS4-W-C FAULT SMPT - VAC03BB 480 VAC MCC E424-0-A FAULT SMPT - VACO3E1 480 VAC MCC 4PS4-W-B FAULT SMPT - VAC03FF 480 VAC MCC 2R4-T-A FAULT SMPT - VAC03H 480 VAC MCC B34-C-A FAULT SMPT - VAC03Il 480 VAC MCC E23A4-EC-A FAULT SMPT - VACO3JJ 480 VAC MCC 1G4-T-A FAULT f~S SMPT - VAC03LL 480 VAC MCC 2G4-T-A FAULT 'w,] SMPT - VAC03NN 480 VAC MCC 2G4-P-A FAULT SMPT - VAC03PP 480 VAC MCC 1T4-T-B FAULT SMPT - VAC03RR 480 VAC MCC 2T4-T-B FAULT SMPT - VAC03TT 480 VAC MCC 2PS4-U-C FAULT SMPT - VACO3VV 480 VAC MCC 1PS4-V-A FAULT SMPT - VAC03XX 480 VAC MCC 1PS4-C-B FAULT SMPT - VAC03ZZ 480 VAC MCC 3PS4-0-S FAULT SMPT - VAC04D 120 VAC INSTRUMENT PANEL FAULT The Simulator Performance Tests listed below are to be per-formed during calendar year: 1998 PERFORMANCE TEST 7?ERFORMANCE TEST TITLE SMPT - APR01 APRM CHANNEL FAILS UPSCALE SMPT - APR07 APRM FAILS TO TRIP UPSCALE 7s (>) (HI) SMPT - APR08 APRM FAILS TO TRIP UPSCALE HI HI

i j 01/03/95I PAga: No. 14 ?St The Simulator-Performance Tests listed below are to be per-i c/~$1 formed during calendar year: 1998' PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT - CAR 02 SJAE STEAM SUPPLY VALVE FAILS CLOSED SMPT - CRH02 CRD DRIVE WATER FILTER CLOGGING l SMPT - CRH11-SCRAM DISCHARGE ~ VOLUME DRAIN VALVE FAILS OPEN-i SMPT - CRM02 CONTROL ROD BLADE STUCK SMPT - CSS 01 CORE SPRAY PUMP TRIP-SMPT - CWS03 MAIN-CONDENSER TUBE BLOCKAGE' SMPT - DCD01B 250 VDC DIST. PANEL-20D11 FAULT t ? SMPT - DCD02A 125 VDC DISTRIBUTION PANEL 2 PPA FAULT-j SMPT - DCD03A 24 VDC DISTRIBUTION PANEL BUS' 2E FAULT (g - SMPT - DCWO3 DWCW/RBCCW AUTO SWAPOVER V FAILURE SMPT - DGA03 DIESEL GENERATOR TRIP SMPT - EHH02 BYPASS VALVE FAILS CLOSED SMPT - EHLO2 PRESSURE REGULATOR FAILS HIGH SMPT - EHLO4 MAIN TURBINE ACCELERATION RELAY FAILURE SMPT - ESD01 LOSS OF EXTRACTION STEAM TO FW HEATER r SMPT - ESD05 FEEDWATER HEATER DUMP VALVE FAILS OPEN SMPT - ESD06 FEEDWATER HEATER DUMP VALVE j FAILS CLOSED SMPT - ESWO1 ESW PUMP TRIP SMPT. - FWC06 FW TEMP TRANSMITTER TT-168 i FAILURE SMPT - HPC04 HPCI FIDW CONTROLLER FAILS LOW () SMPT - HPC08 HPCI PUMP DISCH LINE BREAK SMPT - IPM02 THREE MILE ISLAND ACCIDENT (BWR EQUIVALENT) l l ~,

a-h 01/03/95 .Paga No. 15 The Simulator PerformanceLTests listed below are to be per-l - (. Y formed during calendar. year: 1998 ^ PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT - IRM03 IRM CHANNEL FAILS INOP SMPT - IRM05 IRM CHANNEL' FAILS TO TRIP INOP SMPT - MAPO4 13.2 KV BUS FAULT SMPT - MAP 07B 4.16 KV EMERGENCY. BUS E22~ (20A16) FAULT SMPT - MAP 07F 4.16 KV EMERGENCY BUS E FAULT SMPT - MAP 09 13.2 KV BUS AUTO TRANSFER FAILURE ~ SMPT - MCS05 CONDENSATE PUMP TRIP SMPT - MFS01 REACTOR FEEDWATER PUMP TRIP SMPT - MFS05 REACTOR FEEDWATER PUMP MINIMUM FLOW VALVE FAILS CLOSED SMPT - MGA01 MAIN GENERATOR TRIP l SMPT - MGA05 GENERATOR FIELD BREAKER FAILS C OPEN SMPT - MLOO1 MAIN TURBINE BEARING OIL PRESSURE DECREASE SMPT - MSS 03 MSL RUPTURE OUTSIDE THE PRIMARY CONTAINMENT SMPT - MSS 07 MSIV SLOW CLOSURE TIME' i SMPT - MSSO9 REACTOR PRESSURE RELIEF VALVE STICKS OPEN SMPT - MSS 13 STEAM LEAKAGE OUTSIDE f CONTAINMENT SMPT - MTA07 TURBINE LP VALVE FAILS CLOSED SMPT - OGRO1 EXPLOSION IN THE OFF GAS ] PIPING l SMPT - PCS02 COOLANT LEAKAGE OUTSIDE THE 1 PRIMARY CONTAINMENT ] SMPT - PRM03 PRM CHANNEL FAILS INOP SMPT - PTOVR PMS POINT OVERRIDE SMPT - RBV01 STEAM TUNNEL VENTILATION FAN TRIP

. 01/03/95i .Paga No. : 16 w .g The' Simulator Performance Tests listed below are to be per- ' j*~)% - formed during calendar year: 1998' ..d_ PERFORMANCE TEST PERFORMANCE TEST TITLE SMPT- - RBWO4 RBCCW HEAT EXCHANGER SERVICE WATER FLOW BLOCKAGE SMPT - RCIO3 RCIC TURBINE TRI? SMPT - RFC01~ RECIRC MG FLOW CONTROLLER FAILS UPSCALE SMPT - RHR04 'RHR PUMP DISCHARGE LINE: BREAK . SMPT- - RMCO2 ROD DRIVE CONTROL TIMER MALFUNCTION SMPT - RPS05 RPS AUTOMATIC SCRAM CIRCUIT FAILURE SMPT - RRS03 RECIRC FLOW UNIT FAILS DOWNSCALE SMPT - RRS07 RECIRC PUMP SHAFT SEIZURE SMPT - RRS13 RECIRC PUMP #1 SEAL FAILURE ] ~ SMPT - RVIO1 REACTOR LEVEL TRANSMITTER LT-72 FAILURE SMPT - RVIOS RVP PRESSURE TRANSMITTER PT-55 FAILURE j i SMPT - RVIO9 REFERENCE LINE BREAK-NARROW RANGE LEVEL SMPT - RVI13 SENSING LINE BREAK-ACTIVE CORE LEVEL SMPT - RWC01 RWCU PUMP TRIP j SMPT - RWM01 RWM TOTAL FAILURE SMPT - SRM02 SRM CHANNEL FAILS DOWNSCALE SMPT - SRM06 SRM CHANNEL FAILS TO TRIP INOP SMPT - SWC01 LOSS OF STATOR WATER COOLING FLOW j SMPT - TBWO2 TBCCW HEAT EXCHANGER TUBE LEAK SMPT - TIP02 TIP IN CORE GUIDE TUBE RUPTURE SMPT - VAC01D 480 VAC BUS B14 FAULT () SMPT - VAC01L 480 VAC BUS 2G4 FAULT SMPT - VAC01P 480 VAC BUS 3PS4 FAULT 4 i -t 8 a m

p: c -01/03/95 Paga No. 17 g The Simulator' Performance Tests listed below are to be per- ,. /""N,- , formed during calendar year: 1998 PERFORMANCE' TEST PERFORMANCE TEST TITLE SMPT - VACO2B 480 VAC EMERGENCY BUS E224 FAULT SMPT - VACO2F 480 VAC EMERGENCY BUS'E23A4 FAULT SMPT - VACO3AA 480 VAC MCC E424-T-B FAULT SMPT - VACO3D1-480 VAC MCC 3PS4-V-A FAULT-SMPT - VACO3EE 480 VAC MCC 2R4-R-B FAULT SMPT - VAC03G 480-VAC MCC B24-C-A FAULT q SMPT - VAC03H1 480 VAC MCC E13A4-EC-A FAULT SMPT - VACO3II 480 VAC MCC 1G4-G-B FAULT SMPT - VAC03K 480 VAC MCC E124-T-FAULT SMPT - VACO3M 480 VAC MCC E124-P-A FAULT SMPT - VACO30 480 VAC MCC E224-R-B FAULT fT-SMPT - VAC03Q 480 VAC MCC E234-D-A FAULT -Q SMPT - VAC03S 480 VAC MCC E324-R-B FAULT SMPT - VACO3U 480.VAC MCC E324-D-A FAULT SMPT - VACO3W 480 VAC MCC E324-O-A FAULT SMPT - VAC03Y 480 VAC MCC E424-R-D FAULT SMPT - VAC04A 120 VAC INSTRUMENT PANEL FAULT SMPT - VAC04E 120 VAC INSTRUMENT PANEL FAULT SMPT - VED01 MOTOR OPERATED VALVE MAGNETIC OVER CURRENT TRIP 4 4 4 O

\\ O EXHIBIT 5 4 l Simulator Performance Test Schedule - O Computer Performance, Steady State and 4 Normal Operation, and Transient Performance Tests 4

u PEACH BOTTOM ATOMIC POWER CTATION l UNIT-2 SIMULATOR l --PERFORMANCE-TEST SCHEDULE ' ANNUAL PERFORMANCE TESTS j Tha Simulator Performance Tests listed below are to be per- ,(qLj formed each calendar year. 01/05/95 Page No. 1 l l PERFORMANCE. TEST PERFORMANCE TEST TITLE j SCPT-RT001 SIMULATOR COMPUTER REAL TIME i TEST j SMPTT-IPM02 MSIV CLOSURE WITH FAILED OPEN I SRV AND NO HP ECCS l SMPTT-RRS08 RECIRC MG DRIVE MOTOR BREAKER TRIP SSPT-HEAT BALANCE SIMULATOR HEAT BALANCE TEST AT l APPROX. 100%, 50%, AND 25% POWER i SSPT-STABILITY / MASS BAL SIMULATOR STABILITY AND MASS [ BALANCE TEST i I h STPT-IPM03 ANTICIPATED TRANSIETIT WITHOUT .j SCRAM i STPT-MANUAL SCRAM SIMULATOR TRANSIENT O PERFORMANCE. TEST MANUAL SCRAM V STPT-MAT-1843J RFPT TRIP FROM ~ 74.44 POWER l STPT-MAT-1843JA RFPT TRIP FROM ~ 90.0% POWER j STPT-MAT-1843K CONDENSATE PUMP TRIP WITH 'i RECIRC RUNBACK FROM ~ 92% POWER { STPT-MAT-1843L RECIRCULATION PUMP TRIP FROM ~ ) 96% POWER STPT-MFS02 SIMULTANEOUS TRIP OF ALL FEED PUMPS STPT-MSSO2 MAX UNISOLABLE STEAM LINE RUPTURE STPT-MSS 06* SIMULTANEOUS CLOSURE OF ALL MSIV's STPT-MTA04 TURBINE TRIP WITHIN BYPASS .) VALVE CAPACITY STPT-PWRRAMP MAX RATE POWER RAMP FROM 100% TO 75% TO 100% O/ STPT-RRS08* SIMUTANEOUS TRIP OF ALL RECIRC PUMPS f i

~ 01/05/95 Paga No. 2 . PERFORMANCE TEST PERFORMANCE TEST TITLE STPT'E _RRS20 MAX RECIRC SUCTION BREAK WITH O IDP STPT-SP-1233 TURBINE TRIP WITHIN BYPASS VALVE CAPACITY STPT-UPSET 2-85-07. PLANT UPSET REPORT # 2-85-07 LOSS OF FEEDWATER AND MSIV CLOSURE s O O}}