Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Direct Testimony". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20032B521  + (Forwards Dietz Providing Completed Tables 1-4 Re Station Blackout,Unresolved Safety Issue A-44,per NRC 810709 Request)
  • ML20205N634  + (Forwards Difference Analysis Per NUREG-1021,ES-106 Re Administration of Exams at multi-unit Power Stations & cross-training Program Description.Waiver as Stated in ES-106,Section G Will Be Requested)
  • L-88-360, Forwards Differences Identified Between Conclusions Reached by Staff in 850611 & 860609 Safety Evaluations Re Preupgraded SPDS & Upgraded SPDS Now Installed at Plant  + (Forwards Differences Identified Between Conclusions Reached by Staff in 850611 & 860609 Safety Evaluations Re Preupgraded SPDS & Upgraded SPDS Now Installed at Plant)
  • ML20003B668  + (Forwards Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve Housing, Technical Rept Prepared in Response to Tech Spec Requirements.No Remedial Action Is Necessary.Settlement Monitoring Has Been Increased)
  • ML20003B669  + (Forwards Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve Housing, Technical Rept Prepared in Response to Tech Spec Requirements.No Remedial Action Is Necessary.Settlement Monitoring Has Been Increased)
  • ML20198F534  + (Forwards Differing Prof Opinion Consideration Document & J Hopenfeld 980925 Memo to Commission Re voltage-based Repair Criteria for Steam Generator Tubes.Placement of Documents in PDR Requested)
  • ML20011E952  + (Forwards Differing Prof Opinion Re Plant Containment Isolation Valves & Methodology Used for Calculating Offsite Doses.Consideration Requested by Independent Outside Qualified Sources)
  • ML20209F421  + (Forwards Differing Professional View Panel Rept on Handling of Liquid Effluent Releases from in Situ Leach Operations at Licensed Facilities.Panel Finds Concerns Expressed in Dpvs Reasonable & Should Be Addressed)
  • ML20206P401  + (Forwards Differing Professional View Re NRC Termination of counter-terrorism Program for Npps.Disagrees with NRC Mgt Decision to Eliminate Osre Program)
  • ML20196D829  + (Forwards Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood Per Latest Dpv Policy Guidelines)
  • ML20153D433  + (Forwards Differing Professional Views Re TS Setpoints & Allowable Values for Instrumentation,Which Should Be Forwarded to Office Director Per Latest Dpv Policy Guidelines)
  • ML20137A733  + (Forwards Differing Views Re Aspects of Proposed Generic 50.54(f) Ltr Re Adequacy & Availability of Design Bases Info)
  • ML20238D547  + (Forwards Digital Metal Impact Monitoring Sys Baseline Data Acquisition Summary for Vogtle Unit 1, Per Util . Rept Provides Documentation of Sys Sensitivity,Bases for Sys Settings & Simulated Loose Parts Impact Data)
  • ML20080H469  + (Forwards Digitization of Data Presented in Figure 4.2 of Stability Evaluation of BWR Cores, (XN-NF-691(P)),per Ga Schwenk 830908 Request.Encl Withheld (Ref 10CFR2.790))
  • ML20091R260  + (Forwards Diia E-1.0 Rev 17/V2636 Log 00013 & E-10 Rev 17/V2323 Log 00006,per G Carter Request.W/O Encl)
  • ML20084Q541  + (Forwards Diia E-5.0-15/v-1 22,Logs 00098,00099,00101, 00102,00103 & 00104,per D Cooke Request.W/O Encl)
  • ML20216D822  + (Forwards Direct Final & Parallel Proposed Rule for 10CFR50.54(a) Concerning Control of Changes to QA Programs Published in Fr (64FR9029) on 990223)
  • ML20140C473  + (Forwards Direct Final Rule & Accompanying Proposed Rule to Amend 10CFR51.60 Re Environ Repts for Matl Licensees)
  • ML20155D194  + (Forwards Direct Final Rule & Companion Proposed Rule for Publication in Fr.Direct Final Rule Has Effective Date of 981112.Companion Proposed Rule Should Be Subj to 30 Day Comment Period)
  • ML20154H259  + (Forwards Direct Final Rule Along with Companion Proposed Rule for 10CFR73.51, Physical Protection for Spent Nuclear Fule & High-Level Radioactive Waste. Correction Will Become Effective on 981112)
  • ML20140B744  + (Forwards Direct Final Rule for Revoking Requirement for Environ Rept from U Mill Licensees at License Termination 10CFR51.60)
  • ML20154H220  + (Forwards Direct Final Rule to Amend 10CFR73.51, Physical Protection for Spent Nuclear Fuel & High Level Radioactive Waste)
  • ML20199B463  + (Forwards Direct Final Rule,Proposed Rule & Regulatory Analysis for Final Rule Re Amend to Commission Rules in 10CFR50.55a.Paragraph (B) Will Be Amended to Incorporate by Ref IEEE Standard 603-1991)
  • ML20126A207  + (Forwards Direct Testimonies of G Martin & Jf Myers Re Eddleman Contention 57-C-10,per Board 850521 Order. Testimonies Will Be Offered Into Evidence at Hearings on Emergency Planning Contentions to Begin on 850624)
  • ML20202J694  + (Forwards Direct Testimonies of M Wallace on Subcontention Item 1 & JW Gieseker for Subcontention Items 4.A & 4.B. Testimony Omitted from Applicant 860411 Prefiled Testimony. Related Correspondence)
  • ML20212D436  + (Forwards Direct Testimonies of Rc Roberts,Ej Michel,R Dormer,P Mcguire,D Harris,M Mayer & Gc Minor Re 860213 Emergency Plan Exercise.Certificate of Svc Encl.Related Correspondence)
  • ML20023C058  + (Forwards Direct Testimony & Affidavits in Response to Questions Posed by ASLB During 830407 Telcon)
  • ML20155H114  + (Forwards Direct Testimony & Exhibit Which Util Will Offer at Evidentiary Hearing to Begin on 881031.Counsel & Parties Agreed to Hold Telcon on 881014 to Discuss Scheduling of Witnesses.W/Certificate of Svc.Related Correspondence)
  • ML20094L819  + (Forwards Direct Testimony & Supporting Exhibits on Adequacy & Reliability of Tdi Emergency Diesel Generators.W/O Motion for Protective Order.Certificate of Svc Encl.Related Correspondence)
  • ML20153F138  + (Forwards Direct Testimony Addressing Intervenor Emergency Planning Contentions 1(a) & 1(b) & Notifies of Intent to Introduce Into Evidence, Il Plan for Radiological Accidents, at 860311 Hearing.Related Correspondence)
  • ML20132B235  + (Forwards Direct Testimony Applicant Will Present at 850930 Hearing on Drug Use Contention,Per ASLB 850918 Order.List of Testimony & Exhibits Encl.Certificate of Svc Encl.Related Correspondence)
  • ML20132B240  + (Forwards Direct Testimony Applicant Will Present at 850930 Hearing on Drug Use Contention,Per ASLB 850918 Order.List of Testimony & Exhibits Encl.Certificate of Svc Encl.Related Correspondence)
  • ML20236U503  + (Forwards Direct Testimony Submitted on Behalf of Campaign for Ratepayer Rights for Presentation Before Decommissioning Finance Committee in Ndfc 98-1)
  • ML20091M791  + (Forwards Direct Testimony for Hearing Session Commencing on 830426 Re Qa,Remedial Soils Work & Cable Pulling Incident. Certificate of Svc Encl)
  • ML20069J054  + (Forwards Direct Testimony for Hearings Commencing on 830426)
  • ML20087K840  + (Forwards Direct Testimony of Cv Failla Re Contention 24.F.2. Related Correspondence)
  • ML20154D894  + (Forwards Direct Testimony of Dt Hartgen on Behalf of State of Ny Re Immateriality Issues.Related Correspondence)
  • ML20100F598  + (Forwards Direct Testimony of EM Buzzelli,Jd Richardson, Kw Holtzclaw,Rw Alley,B Lewis,B Karlovitz & Gm Fuls on Issue 8 Re Preliminary Evaluation of Plant Hydrogen Control Sys.Related Correspondence)
  • ML20091N983  + (Forwards Direct Testimony of Facility Proceeding & Chart Showing,In Summary Form,Each Major Issue & Position of Parties.W/Certificate of Svc.Related Correspondence)
  • ML20054F660  + (Forwards Direct Testimony of MW Hodges,Ws Hazelton,Cy Cheng, MR Hum,De Smith,Ga Walton & CS Hinson Re Suffolk County Contentions 28(a)(vi) & 25 & Shoreham Opponents Coalition Contentions 7(a)(6) & 19(a))
  • ML20069C863  + (Forwards Direct Testimony on Contention 5 & Lobbin Rept & Exhibits to Be Introduced on Redirect Examination of Primary Panel on Contention 5,per ASLB 820713 Order.Two Oversize Drawings Encl.Aperture Cards Available in PDR)
  • ML20065A977  + (Forwards Direct Testimony on Issues 1 - 9 of Aslab 821228 Memorandum & Order ALAB-708.Certificate of Svc Encl)
  • ML20039F619  + (Forwards Direct Testimony on Joint Intervenors Contentions 1,emergency planning,10,pressurizer Heaters, & 12,block & Power Operated Relief Valves)
  • ML20136C858  + (Forwards Directions to Location of 970115 Decommissioning Meeting for Reactor)
  • ML20095K219  + (Forwards Directive & Associated Procedure for Tightening Diesel Engine Reassembly Program,In Connection W/Diesel Generator Rocker Arm Incident)
  • ML20024C762  + (Forwards Directive 3.1.10(OP), Control Room Access & Control, in Response to SER Section 13.5)
  • ML20237K579  + (Forwards Directive DBVP-D-87-008,clarifying Requirements for Controlling Changes to Sequoyah Nuclear Plant Engineering Procedure SQEP-45, Control of Design Baseline Verification Program Action Items, Per NRC Insp Concerns)
  • ML20059D619  + (Forwards Directive from Stated Ofc Re Penalties for Late Payment by Federal Agencies,Per on Overdue Bill for Stated Svcs to NRC)
  • ML17306A620  + (Forwards Director Decision Denying Request That Palo Verde Plant Be Shut Down Pending Resolution of 10 Specific Allegations Contained in Ltr from Dk Colapinto & SM Kohn)
  • ML20246B884  + (Forwards Director of NRR Ack Receipt of Petition Filed by Ecology Ctr of Southern California & Stating That Petition Being Treated Under 10CFR2.206,for Info)