Forwards Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve Housing, Technical Rept Prepared in Response to Tech Spec Requirements.No Remedial Action Is Necessary.Settlement Monitoring Has Been Increased
ML20003B668
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/20/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003B669 List:
References
118, NUDOCS 8102250135
Download: ML20003B668 (1)


Text

.

"7 m

h m

.
7 VIRGINIA EI.ncTsuc AND Powan CourANY 2-HIcawo.vn,V1moneIA 2'a261 c.

s

~

C February 20, 1981 b-

!~.

k. '

Mr. James P. O'Reilly, Director Serial No. 118 Office of Inspection and Enforcement N0/RWC:jmj U.S. Nuclear Regulatory Commission Docket Nos. 50-338 Region II 50-339 101 Marietta St., N.W., Suite 3100 License Nos. NPF-4 Atlanta, Georgia 30303 hTF-7

Dear Mr. O'Reilly:

DIFFERENTIAL SETTLEMENT NORTH ANNA UNITS 1 & 2 Attached is a technical report prepared in response to the requirements of North Anna Units 1 and 2 Technical Specifications 3/4.7.12. Measurements of differential settlement between the Service Building and the Unit 2 Main Steam Valve Housing have exceeded 75 percent of the allowable settlement given in Table 3.7-5 of the Technical Specifications.

As demonstrated in this report, there is no i==ediate concern for remedial actica. The projection of future settlement is being evaluated based on the increased frequency of settlement monitoring to determine the most appropriate long term remedial action.

This report has been reviewed by the Station Nuclear Safety and Operating Committee.

Very truly yours, l

B.

via Manager - Nuclear erations and Maintenance Attachment cc:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing

,wI s

!I 8102250135 g