Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13330B477 + (Forwards Clarifications to Util 870709 Comments on Preliminary SER on Operability of Unit Standby Diesel Generators,Per 890117 Meeting.Recommendations in Table a Will Continue to Be Implemented)
- ML17261B306 + (Forwards Clarifications to safety-related motor-operated Valve Program,Per Util 870610 Response to IE Bulletin 85-003.Clarifications Should Be Considered Appurtenance to 870610 Submittal)
- ML20155B557 + (Forwards Clarifications/Corrections to Transcript of 851119 & 20 Meetings in Bethesda,Md Between NRC & Case Re Ssers 7-11.Supplemental Response to Roisman Question on Page 232 Re Comanche Peak Review Team Program Plan Encl.Record Copy)
- ML18041A174 + (Forwards Clarified & Expanded Paper Addressing Quality of Parts in Control Panels,Per 880302 Telcon.Encl Intended as Replacement for to a Thadani from R Artigas)
- ML20151N903 + (Forwards Clarified Fundamental Nuclear Matl Control Plan Pages 1-10,1-11a & 1-14 Since Pages in 851111 Submittal Unclear Due to Copying Omissions.Pages Withheld (Ref 10CFR2.790(d)))
- NUREG-0094, Forwards Clarified Portion of Examiner Std That Includes Definition of Significant Re 10CFR55.31(a)(5),requiring Applicants for OLs to Perform Min of Five Significant Control Manipulations,Per NUREG-0094 + (Forwards Clarified Portion of Examiner Std That Includes Definition of Significant Re 10CFR55.31(a)(5),requiring Applicants for OLs to Perform Min of Five Significant Control Manipulations,Per NUREG-0094)
- ML17298B243 + (Forwards Clarified Response to Question 1.1 on Reactor Coolant Pump Rept,Previously Addressed in . Diffuser/Suction Pipe Assembly,Diffuser Cavitation & Impellers Addressed)
- ML20154G984 + (Forwards Clarified Response to Violation 413/88-05-01,per 880516 Telcon W/Region Ii.Procedure IP/O/3820/02A Written as Instrument Procedure Rather than Test Procedure to Provide More Flexibility for Various Plant Conditions)
- AECM-80-295, Forwards Clarified Responses to Environ Rept Questions 350.9-350.12 Re Socioeconomic Impact & Initial Response to Questions 451.1,Parts 1 & 2 Re Air Quality.Encl Responses Will Appear as Amend 5 to Final Environ Rept + (Forwards Clarified Responses to Environ Rept Questions 350.9-350.12 Re Socioeconomic Impact & Initial Response to Questions 451.1,Parts 1 & 2 Re Air Quality.Encl Responses Will Appear as Amend 5 to Final Environ Rept)
- SNRC-1184, Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals + (Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals)
- ML19309A319 + (Forwards Clarifying & Supplemental Info Re Containment Liner Plate Bulges,In Response to Rc Deyoung)
- ML19353A858 + (Forwards Clarifying Amend to Section 51.10(d) of Commission 10CFR51 Rule.Amend Will Assure Uniform Understanding of Types of Enforcement Activities Excluded from NEPA Under Section 51.10(d))
- ML19320A395 + (Forwards Clarifying Amends to Revised App D to 10CFR50.App D,Section E Requires That Facility Furnish to AEC Written Statement Showing Cause for CP Nonsuspension Pending NEPA Environ Review Completion.W/O Encl)
- ML18101A634 + (Forwards Clarifying Info Re Commitments in 941101 Response to NOV & Proposed Imposition of Civil Penalty,As Discussed W/Nrc on 950227)
- ML20235F061 + (Forwards Clarifying Info Re Deletion of Wells from Sampling Requirements,Per 870512 Request)
- ML18102B037 + (Forwards Clarifying Info Re Mods Discussed in Util 970327 Submittal in Response to GL 96-06,as Requested in 970403 Telcon W/Nrc)
- ML20028A763 + (Forwards Clarifying Info Re New Fuel Storage Physical Security Plan.Encl Withheld (Ref 10CFR73.21))
- L-84-246, Forwards Clarifying Info Re Postulated Reactor Coolant Pump Seized Rotor & Loss of All Nonemergency Ac Events,Per 840213 Request + (Forwards Clarifying Info Re Postulated Reactor Coolant Pump Seized Rotor & Loss of All Nonemergency Ac Events,Per 840213 Request)
- ML20235H432 + (Forwards Clarifying Info Re Tech Spec Change 87-02 to Licenses DPR-77 & DPR-79 Concerning Functional Operation of Radiation Monitors in Steam Generator Blowdown & Condensate in Demineralizer lines.W/15 Oversize Drawings)
- ML20214R045 + (Forwards Clarifying Info for Application of leak-before-break Methodology to Auxiliary Lines,Including Application of bi-linear stress-strain Curve in Crack Stability Analysis)
- ML20076D633 + (Forwards Clarifying Info in Support of 830311 Exemption Requests for 10CFR50.48,App R Re Fire Areas 58,59,73 & 74)
- B11955, Forwards Clarifying Info to Re Impact of Release of Superheated Steam from Postulated Main Steam Line Break on Environ Qualification of Equipment Located Outside Containment,Per 860108 Meeting + (Forwards Clarifying Info to Re Impact of Release of Superheated Steam from Postulated Main Steam Line Break on Environ Qualification of Equipment Located Outside Containment,Per 860108 Meeting)
- ML20236E765 + (Forwards Clarifying Tech Specs Re Licensee Decommissioning Plan.Related Correspondence)
- ML17313A197 + (Forwards Class 1E,125 Volt,Dc Battery Load Profiles That NRC Requested During 980106 Telcon.Battery Load Profiles Submitted as Addl Info for Ltr ,requesting Amend to TS 3/4.8.2 & Bases Section 3/4.8)
- ML19347F517 + (Forwards Class 2 Sys Weld Program)
- ML19347F518 + (Forwards Class 2 Sys Weld Program.)
- ML19338G430 + (Forwards Class 3 Amend Fee in Response to NRC 800814 & 1009 Ltrs)
- ML20002C793 + (Forwards Class 3 Amend Fee of $4,000 Per 780602 Request)
- B11723, Forwards Class 3 Fee & Section Ii,Paragraph 2.3 of Rev 2 to Preservice Insp Plan,Per 850320 Commitment + (Forwards Class 3 Fee & Section Ii,Paragraph 2.3 of Rev 2 to Preservice Insp Plan,Per 850320 Commitment)
- ML20027A149 + (Forwards Class 3 Fee for Application for Amend to License DPR-16)
- ML19290E282 + (Forwards Class 4 Amend Fee)
- NUREG-0440, Forwards Class 9 Liquid Pathway Assessment Input to Chapter 6.1 of Des + (Forwards Class 9 Liquid Pathway Assessment Input to Chapter 6.1 of Des)
- ML19206B308 + (Forwards Class Action Complaint CA 79-520,filed in Us District Court,Middle District of Pa,Brought Against Utils Associated W/Tmi)
- ML19221A674 + (Forwards Class Action Complaint Re TMI Accident Filed Against Utils & Vendors in C Robert Larson,Et Al,Vs Met Ed, Et Al)
- ML19221A374 + (Forwards Class Action Complaint Smith Vs B&W,79Civ2235,US District Court for Southern District of Ny)
- L-83-534, Forwards Class I & Class II Fees for 831012 Application to Amend Licenses DPR-67 & NPF-16.W/o Encl + (Forwards Class I & Class II Fees for 831012 Application to Amend Licenses DPR-67 & NPF-16.W/o Encl)
- L-83-539, Forwards Class I & Class II License Amend Fees Re 830505 Request for Deletion of App B ETS + (Forwards Class I & Class II License Amend Fees Re 830505 Request for Deletion of App B ETS)
- ML18086A883 + (Forwards Class I & Class III Fees for Review of 810709 Request for Relief from ASME Boiler & Pressure Vessel Code Inservice Insp Requirements.Fees Submitted Under Protest. Relief Not Under Purview of 10CFR170.22)
- ML17338A495 + (Forwards Class I & Class III License Amend Fee in Response to 790131 Request)
- L-84-102, Forwards Class I & II License Amend Fee for 840402 Application to Amend Licenses DPR-31 & DPR-41 Re Inservice Insp & Test Program + (Forwards Class I & II License Amend Fee for 840402 Application to Amend Licenses DPR-31 & DPR-41 Re Inservice Insp & Test Program)
- L-83-331, Forwards Class I & III Fees for Proposed License Amend Re Monthly Sys Walkdowns + (Forwards Class I & III Fees for Proposed License Amend Re Monthly Sys Walkdowns)
- L-82-460, Forwards Class I & III Fees for Proposed License Amend Re Radiological Effluent Tech Specs + (Forwards Class I & III Fees for Proposed License Amend Re Radiological Effluent Tech Specs)
- ML17354A223 + (Forwards Class I & III Fees for Proposed License Amend Per NUREG-0737 Tech Specs)
- L-83-413, Forwards Class I & III Fees in Payment of Proposed License Amend Re Spent Fuel Storage Facility Expansion + (Forwards Class I & III Fees in Payment of Proposed License Amend Re Spent Fuel Storage Facility Expansion)
- ML17345B330 + (Forwards Class I & III Fees in Payment of 830912 Proposed Amend to Licenses DPR-31 & DPR-41,deleting ETS Re Groundwater Monitoring)
- L-83-550, Forwards Class I & III Fees in Payment of 830912 Proposed Amend to Licenses DPR-31 & DPR-41,deleting ETS Re Groundwater Monitoring + (Forwards Class I & III Fees in Payment of 830912 Proposed Amend to Licenses DPR-31 & DPR-41,deleting ETS Re Groundwater Monitoring)
- ML20008F178 + (Forwards Class I & IV Fees for 801110 Application for OL Amends,In Response to NRC 810219 Request.Application Proposed Changes to Six Areas of Facility Tech Specs Re TMI-2 Lessons Learned Category a Items)
- ML20032C034 + (Forwards Class I Amend Fees Inadvertently Omitted from 810512 Request for Changes to App a Tech Specs Re Reactor Protection Sys Delay & Average Power Range Monitor Gain Adjustments.Review of Fee Applicability Requested)
- ML20039B248 + (Forwards Class I Duplicate Fee Required for Amend 5 to License in Response to 811116 Request)
- ML20043H565 + (Forwards Class I Structures License Renewal Industry Rept. Rept Developed by EPRI to Foster Timely Establishment of Viable License Renewal Option & Regulatory Process)
- ML18018B725 + (Forwards Class IE Equipment Environ Qualification Master List, Containing safety-related Equipment in Locations W/Total Integrated Dose Greater than Stated Rads)