Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 2CAN088307, Forwards Analysis of Spurious Actuation of ESF Sys. Consequences of Spurious Actuations of ESF Actuation Sys Combinations Would Be No More Severe than Scenarios Previously Analyzed + (Forwards Analysis of Spurious Actuation of ESF Sys. Consequences of Spurious Actuations of ESF Actuation Sys Combinations Would Be No More Severe than Scenarios Previously Analyzed)
- ML20070H273 + (Forwards Analysis of Structural Margin Beyond Design Base Loads on Reactor Vessel Support Ledge,In Response to 821209 Request)
- ML19345C477 + (Forwards Analysis of Subgrade Rupture Mechanism at Getr)
- ML19343C082 + (Forwards Analysis of Sys Adequacy & Reliability as Result of Continuing Outage of Facility,In Response to 810106 Request. Operation During Forthcoming Peak Load Periods Will Offer Major Adequacy & Reliability Benefits)
- ML20028D359 + (Forwards Analysis of Thermal Decay Heat Limits for Half Super Tiger Modes a & B,Per 720321 Telcon)
- ML20094D211 + (Forwards Analysis of Thermal Response of Junction Between Partially Protected Member Which Protrudes Thermo-Lag 330 Fire Barrier & Cable Tray & Summaries of Test Results for Configurations of 3M Fire Protection Envelope)
- ML13308B752 + (Forwards Analysis of Time Required to Evacuate Transient & Permanent Population from Various Areas within Plume Exposure Pathway Emergency Planning Zone)
- ML20215D967 + (Forwards Analysis of Transient Behavior of Chernobyl Rcs. Releasing Rept as Technical Rept Planned)
- ML20034A763 + (Forwards Analysis of Util 860902 Request to Delete Antitrust License Conditions from Plant.Request Denied)
- ML18089A177 + (Forwards Analysis of Valve/Operator Interface Hardware for Containment Pressure & Vacuum Relief Valves 1 & 2 VC 5, in Response to NRC 830519 Request)
- ML18089A178 + (Forwards Analysis of Valve/Operator Interface Hardware for Containment Pressure & Vacuum Relief Valves 1 & 2 VC 5, in Response to NRC 830519 Request)
- ML13330B251 + (Forwards Analysis of Various Mods to San Onofre Diesel Generators to Reduce Potential of Fatigue Cracking in Crankshaft Oil Holes Due to Startup & Coastdown Transient Stresses)
- ML20084L425 + (Forwards Analysis of Vent Header Cracking at Hatch 2. Analysis Shows That Observed Cracking Can Be Explained by Injection of Cold Nitrogen Into Containment & Any Cracking Expected to Be through-wall,detectable by Visual Insp)
- ML20039B657 + (Forwards Analysis of Vessel Matl Surveillance Capsules Withdrawn from LACBWR During 1980 Refueling. Rept Summarizes Test Results of Specimens from Irradiated Capsules)
- ML20090H438 + (Forwards Analysis of Vessel Wall Neutron Dosimeter from Browns Ferry Units 1,2 & 3 Pressure Vessel, in Response to NRC Request for Addl Info to Support Util 830922 Request to Change Tech Specs TS 191)
- ML20069H533 + (Forwards Analysis of Wall Liner at Square Penetrations for Crbr Cell Liner Design Verification Program,Per Commitment in DOE)
- ML19224C742 + (Forwards Analysis of Well Water Samples Re Ongoing Seepagee Monitoring & Control Program for 781231-790331 Relating to Cotter Corp Canon City Mill Expansion Project)
- ML19323A763 + (Forwards Analysis of short-term Stability After Completion of Phase Iia Const.Requests Approval Re Discharging W/ Appropriate Lift Upon Completion of Const)
- ML19210E888 + (Forwards Analysis to Demonstrate Adequate Core Cooling. More Detailed Description of Analyses Will Be Provided by 791228)
- ML20134B051 + (Forwards Analysis to Demonstrate Conformance of Exxon Nuclear Fuel to Westinghouse K(Z) Operating Envelope for Facility,Per 10CFR50.46 & App K,In Response to NRC 850806 Request)
- ML20134B053 + (Forwards Analysis to Demonstrate Conformance of Exxon Nuclear Fuel to Westinghouse K(Z) Operating Envelope for Facility,Per 10CFR50.46 & App K,In Response to NRC 850806 Request)
- ML19262A184 + (Forwards Analysis, Flux/Flow Trip Delay Time Increase. Describes Change in FSAR Re Delay Time of Flux/Flow Trip in Reactor Protection Sys,Based on Info from B&W)
- ML20204H149 + (Forwards Analysis,In Response to Bj Youngblood 870219 Request for Addl Info Re Element Rept EN 213.4,demonstrating How Requirements of IEEE Stds 308 Re Criteria for Class 1E Electrical Sys & 317 Re Electrical Penetrations Met)
- ML17326B190 + (Forwards Analysis/Assessment of 850329 Submittal Re Substation & Grid Sys & Need for Backup Power for Containment Hydrogen Monitors.No Addl Supplies for Hydrogen Igniter Sys Required)
- ML19322A523 + (Forwards Analytic Data on Samples of Water Taken from Containment Sump.W/O Encl)
- ML20126F450 + (Forwards Analytical Chemistry Rept)
- ML20005G548 + (Forwards Analytical Evaluation of Station Svc Water Sys for Facilities by Case Consultant J Doyle Dtd 891231.Rept Submitted to Document Events Re Removal of Plastite Liner in Station Svc Water Sys in Spring 1988)
- ML20084R209 + (Forwards Analytical Justification for Treatment of Reactor Coolant Pumps During Accident Conditions, in Response to Re NUREG-0737,Item II.K.3.5 Concerning Automatic Trip of Reactor Coolant Pump)
- ML19289G023 + (Forwards Analytical Results for Primary Coolant, Including Bettis Analysis, for 790329 & 0410)
- ML17331A791 + (Forwards Analytical Results from 801216 Confirmatory Measurements Split Sample.Comparison Results Documented in Insp Repts 50-315/80-22 & 50-316/80-18.Results of Spiked Particulate Filter Analysis Will Be Submitted Separately)
- ML19309F514 + (Forwards Analytical Results of 791015-16 Sampling Trip to Canon City to Investigate Water,Soil & Vegetation Contamination)
- ML19224C121 + (Forwards Analytical Results of Charcoal Analysis 790430-0501)
- ML20206U461 + (Forwards Analytical Results of Samples Described in Apps G, H & I of Rept 70-0824/85-08,closeout Insp & Confirmatory Survey for Phase I,Bldg C on 851009-11 & 1118-21 & Results of Spiked Samples Prepared by Contractor)
- ML16342B607 + (Forwards Anchor/Darling 5505 Structural Attachment Potential Clearance Interference in 90 Offset Applications.Ltr Appears to Have Part 21 Implications)
- ML19350C817 + (Forwards Anchorage & Support Table for safety-related Electrical Equipment.Info Re Large Cantilevered Equipment Inside Cabinets & Control Panels Will Be Assembled After Refueling Outage.Info Expected by End of Aug 1981)
- ML20128K231 + (Forwards Anco Cable Tray Test Rept,Representing Most Comprehensive Set of Test Data Outside of SEP Program.W/O Encl)
- ML20155J801 + (Forwards Anco Engineers,Inc Rev 2 to Vol 1 to A-000197, Final Summary Rept Comanche Peak Conduit Tests, Technical Rept,Per NRC 870623 Witnessing of Clamp Tests)
- ML20236D853 + (Forwards Anf Corp 890315 Application for Amend to Export License XSNM-2398,adding Anf Lingen Plant in West Germany as Intermediate & Ultimate Consignee.Assistance in Obtaining Ltr of Assurance from Euratom Requested)
- ML20035A854 + (Forwards Ani/Maelu & Neilia Certificates of Insurance Re Property Insurance/Stabilization & Decontamination Liability Insurance for Cpses,Per 10CFR50.54(W)(3))
- ML20064M529 + (Forwards Ani/Maelu & Nelia Certificates of Insurance Re Property Insurance/Stabilization & Decontamination Liability Insurance for CPSES)
- ML20070M321 + (Forwards Ani/Maelu & Nuclear Electric Insurance Ltd Certificates of Insurance Setting Out Property Insurance/ Stabilization & Decontamination Liability Insurance for Plant)
- 0CAN039304, Forwards Ani/Maelu Policies 92143 & X92143 & Neilia Policy X92-002 as Evidence of Primary & Excess Onsite Property Damage Insurance Coverage for Units 1 & 2 + (Forwards Ani/Maelu Policies 92143 & X92143 & Neilia Policy X92-002 as Evidence of Primary & Excess Onsite Property Damage Insurance Coverage for Units 1 & 2)
- ML20198B297 + (Forwards Anl Draft Handbook for Cost Estimating,Suppl, Method for Developing Quick Estimates, for Review & Comment by 851112.Subcommittee Views on Listed Questions Re Approach & Opportunities for Improvement Requested)
- ML20246L274 + (Forwards Anl Draft Rept Re Main Steam Line Breaks in Plants Ice Condenser,Per Util 880613,0907 & 1012 Ltrs & WCAP-10988 & WCAP-10986P,for Review & Comments within 60 Days.W/O Encl)
- ML20037D544 + (Forwards Anl Evaluation of Potential for & Consequences of Recriticality During Cleanup & Defueling at TMI-2. Evaluation Concurs W/Previous NRC Studies That Probability of Recriticality Is Extremely Low.W/O Encl)
- ML20054M224 + (Forwards Anl Memoranda Requested After 820630 Insp Relevant to Interrogatories.Index of Documents Encl.W/O Documents. Certificate of Svc Encl)
- ML17320A969 + (Forwards Anl Preliminary Questions Developed During Review of Exxon Repts Supporting Request for Reload Review.Meeting Scheduled for 840329)
- ML20134C651 + (Forwards Anl Proposal for FIN A-2157 for Review.Review Requested by 850524)
- ML20134C790 + (Forwards Anl Proposals for FINs A-2157 & A-2156 for Review. FY80 Funding Requirements Not Presently Covered.Shortfalls & Any Other Required Changes Requested by 791005)
- ML20072F228 + (Forwards Anl Rept, Element-By-Element Review of Lilco Transition Module of Shoreham Nuclear Power Station Offsite Radiological Emergency Response Plan, in Response to 830601 Request)
- ML19347C669 + (Forwards Anl Rept, Failure Analysis of Cracked Core Spray Piping from Quad Cities Unit 2 Bwr.)