Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25148A362 + (Final Safety Evaluation to the LRA for Perry Nuclear Power Plant Unit 1)
- ML25062A234 + (Final Safety Evaluation to the SLRA of Virgil C. Summer Nuclear Station, Unit 1, Revision 1)
- ML25021A228 + (Final Safety Evaluation to the SLRA of Virgil C. Summer Nuclear Station, Unit 1)
- ML19176A188 + (Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition)
- ML18065B095 + (Final Scenario,1996 Palisades Emergency Exercise)
- ML053480118 + (Final Scenarios)
- ML22003A075 + (Final Scope of Work and Budget for Calendar Year 2021)
- ML23047A408 + (Final Screen Shots for Foreign Travel Reporting)
- ML14273A259 + (Final Screening and Prioritization Results for Cooper Nuclear Station Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident)
- ML24155A087 + (Final Script Verbal Authorization 1RR06)
- ML041750160 + (Final Section B Operating)
- ML042190301 + (Final Section B Operating)
- ML033160298 + (Final Section B Operating)
- ML033100054 + (Final Section B Operating)
- ML041190221 + (Final Section B Operating (RO & SRO))
- ML042750525 + (Final Section B Operating (RO & SRO) (Folder 3))
- ML041730197 + (Final Section B Operating for Salem, Units 1 and 2)
- ML041750183 + (Final Section C Operating)
- ML042190312 + (Final Section C Operating)
- ML040060065 + (Final Section C Operating)
- ML033100055 + (Final Section C Operating)
- ML032880234 + (Final Section C Operating)
- ML033140118 + (Final Section C Operating)
- ML041190228 + (Final Section C Operating (RO & SRO))
- ML042750526 + (Final Section C Operating (RO & SRO) (Folder 3))
- ML041730201 + (Final Section C Operating for Salem, Units 1 and 2)
- ML040150167 + (Final Section a Administrative Operating Topics)
- ML041750153 + (Final Section a Operating)
- ML033100051 + (Final Section a Operating)
- ML042190271 + (Final Section a Operating)
- ML041400380 + (Final Section a Operating)
- ML033160296 + (Final Section a Operating)
- ML041190213 + (Final Section a Operating (RO & SRO))
- ML042750524 + (Final Section a Operating (RO & SRO) (Folder 3))
- ML041730191 + (Final Section a Operating for Salem, Units 1 and 2)
- IR 05000483/2022404 + (Final Security Baseline Inspection Report 05000483/2022404 (Letter))
- ML20002A039 + (Final Seep Monitoring Evaluation Report, Mexican Hat, Utah, Umtrca Title I Disposal Site, December 2019)
- ML17306A379 + (Final Seismic Hazard Evaluation for Palo Verde Nuclear Generating Station,Wintersburg,Az)
- ML19310A285 + (Final Seismic Response Spectra,Joseph M Farley Nuclear Units 1 & 2,AL Power Co,Containment & Internal Structure)
- ML14035A351 + (Final Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- ML13017A475 + (Final Seismic Walkdown Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- GO2-13-117, Final Seismic Walkdown Summary Report + (Final Seismic Walkdown Summary Report)
- ML22341A080 + (Final Set 2 Request for Additional Information – EPRI Report 3002018337, Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recaptutopical Report)
- ML24023A418 + (Final Sierra Club - Dwm Initial Opening Brief)
- ML100130212 + (Final Signed Waste Shipment Record)
- ML063600175 + (Final Significance Determination)
- IR 05000280/2012008 + (Final Significance Determination - NRC Inspection Report 05000280/2012008 and 05000281/20120008, Surry Power Station, Unit 2)
- ML11216A255 + (Final Significance Determination Letter for Security-Related Greater than Green Finding and Notice of Violation - Oconee Nuclear Station (Cover Letter))
- ML15089A503 + (Final Significance Determination NOV (PSB1))
- ML102800403 + (Final Significance Determination and Notice of Violation for Security Related Greater-than-Green Findings Diablo Canyon Power Plant)
- IR 05000457/2024090 + (Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090)
- IR 05000269/2006015 + (Final Significance Determination for Greater than Green Finding and Notice of Violation; IR 05000269-06-015, 05000270-06-015, and 05000287-06-015)
- ML030770178 + (Final Significance Determination for Red Finding & Notice of Violation NRC Special Inspection Report IR 05000266-01-017 & IR 05000301-01-017(DRS))
- IR 05000266/2001017 + (Final Significance Determination for Red Finding & Notice of Violation NRC Special Inspection Report IR 05000266-01-017 & IR 05000301-01-017(DRS))
- IR 05000336/2024440 + (Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only))