Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Final Core Support Barrel Insp Rept,Post-Cycle 6". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20216B926  + (Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Quad Cities 1 & 2, Informal Rept)
  • ML13308A979  + (Final Conformance to Generic Ltr 83-28,Item 2.2.1-- Equipment Classification for All Other Safety-Related Components:San Onofre 1, Informal Rept)
  • ML20245B539  + (Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Summer, Informal Rept)
  • ML20215M006  + (Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Enrico Fermi-2, Informal Rept)
  • ML20215M390  + (Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Fort St Vrain, Informal Rept)
  • ML20215L522  + (Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Catawba Units 1 & 2, Informal Rept)
  • ML20215M212  + (Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept)
  • ML20215L765  + (Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Mcguire 1 & 2, Informal Rept)
  • ML20215L679  + (Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Rancho Seco, Informal Rept)
  • ML20024C179  + (Final Consolidated Emergency Planning Contentions. Certificate of Svc Encl)
  • ML24235A046  + (Final Consolidated NUREG 1757 V1 Appendix K Guidance 8 19 2024)
  • ML19323F819  + (Final Const Deficiency Rept 5 Re Impeller Shaft Retaining Mechanism Failure in Low Presssure Safety Injection Pumps, Discovered on 780216.Exact Cause Not Known But May Be Due to Gasket Deterioration.Locking Devices Modified)
  • ML20073F675  + (Final Const Deficiency Rept 82-07 Re Shop Welding by Unauthorized Welders.Zack Co Officially Withdrew Part 21 Rept on 820914 Based on Results of Investigation)
  • ML20128P254  + (Final Const Deficiency Rept Re Calibr Deviations in Tobac, Inc Pressure Transmitters.Initially Reported on 850411. Item Not Reportable Per 10CFR50.55(e))
  • ML20133N821  + (Final Const Deficiency Rept Re Misoperation of Bailey Controls Co 862 Sys Logic Module Logic Memories During Environ Qualification Testing.Initially Reported on 850909. Gap in Circuit Board Pads Increased & Area Cleaned)
  • ML17208A315  + (Final Const Deficiency Rept:On 790903,Chicago Bridge & Iron Guyed Derrick Collapsed During Hurricane David,Damaging Reactor Auxiliary & Concrete Shield Bldgs.Caused by Inadequate Securing.New Derrick Will Be Erected 800107)
  • ML19260A215  + (Final Contentions Amending Intervenor Environ Coalition on Nuclear Power Petition to Intervene.Plant Computer Obsolete, Emergency Response Plans for Public Evacuation Inadequate & NRC Disregards PA Statutes.Certificate of Svc Encl)
  • ML19329F763  + (Final Contentions Supplementing Petition to Intervene in OL Amend Proceeding.Alleges Inadequacy of RCS Pressure. Provisions Re Neutron Monitoring Instrumentation Are Insufficient to Protect Public.Certificate of Svc Encl)
  • ML19210C332  + (Final Contentions.Nrc short- & long-term Measures Recommended for Facility Are Not Sufficient to Guarantee Public Safety.Safety Sys Found Inadequate & Protection Procedures Insufficient.Certificate of Svc Encl)
  • ML19224B321  + (Final Contingency Plan C-18:breach of Containment)
  • ML19224B314  + (Final Contingency Plan C-20:emergency Plan for Criticality Incident)
  • ML20084L925  + (Final Control Rod Drive Anomaly Rept for 740314 Indication of Uncoupled Condition W/Control Rod Ball B-11,SN.761-C. Caused by Detachment of Inner Filter.Procedures Will Be Changed)
  • ML14077A020  + (Final Cooper Section 3 4 Fpra Record-of-Review 03-17-2014)
  • ML14077A019  + (Final Cooper Section 3 4 IE PRA Record-of-Review 03-13-2014)
  • ML20217G303  + (Final Copy of Comparison of Decommissioning Dose Modeling Codes Dandd & Resrad for Nuclear Power Plant Use)
  • ML17216A528  + (Final Core Support Barrel Insp Rept,Post-Cycle 6)
  • ML101590755  + (Final Corrective Action Plan Report for 80-Acre Wsr, Submitted to Adeq June 12, 2009)
  • ML20085F603  + (Final Cover Letter Safety Evaluation by the Office of Nuclear Reactor Regulation for the Pressurized Water Reactor Owners Group Topical Report PWROG-17031-NP, Revision 1)
  • ML18085A975  + (Final Cvoc Field Screening Report - WEC CFFF-December 2017)
  • ML19042A161  + (Final DOE Presentation for 02-12-2019 NRC Public Meeting)
  • ML20216F667  + (Final DOE/AL/62350-050510, Mod 2 to Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Green River,Ut)
  • ML23136A207  + (Final DRP Ulceration Thresholds Contractor Technical Report)
  • ML20054K955  + (Final Data Report for the Instrumented Fuel Assembly (IFA)-432)
  • ML22066A997  + (Final Data Validation and Reconciliation Methods (DVR) Schedule)
  • ML22066B001  + (Final Data Validation and Reconciliation Methods (DVR) Schedule - Updated)
  • ML19077A312  + (Final Dco RIC 2019 Presentation Clean)
  • ML040510395  + (Final Decision & Order of Remand)
  • ML20079E064  + (Final Decision on Independent Spent Fuel Storage Installation Inspection Program Enhancements - Working Group Recommendations)
  • ML20106C700  + (Final Decommissioning Rept for AGN-201 Reactor)
  • ML20127K282  + (Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project)
  • ML20046B866  + (Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project)
  • ML19320B964  + (Final Decommissioning Rept,Or State Univ AGN-201 Reactor License R-51)
  • ML20035H734  + (Final Decontamination & Decommissioning Surveys,Book 6, Septic Tank & Sewage Pump House)
  • ML20125C910  + (Final Decontamination & Decommissioning Surveys,Unit 2,Unit 3 L-Bldg Fuel Vault Pack Assembly)
  • ML20093G555  + (Final Deficienciency Rept,Item 111 Re Design Defect on RHR Reservoir Freeze Over.Initially Reported on 840104.Procedure Being Developed to Ensure Operability of safety-related Pumps During Cold Weather)
  • ML20204H148  + (Final Deficiencty Rept CDR 84-00-13 Re Portions of Control Circuits Not Considered When Evaluating Total Circuit Length for Voltage Drop Calculations.Initially Reported on 840830. Independent Review Confirms Corrective Actions Completed)
  • ML20138N655  + (Final Deficiency & Part 21 Rept ((Rdc 125(85)) Re Possible Closure Problems of Ruskin Model IBD-23 Fire Dampers. Initially Reported on 850129.Dampers/sys Modified.Work Will Be Completed by 851213)
  • ML20206B729  + (Final Deficiency & Part 21 Rept (CDR 85-00-17) Re Potential for Gould-supplied Motor Control Starters to Bind or Seize Contact Carrier Assembly.Reinsp Conducted to Ensure That Washers Installed Under Contact Carrier)
  • ML20101U082  + (Final Deficiency & Part 21 Rept (Rdc 115(84)) Re Potential Leakage Path in Electronics Housing Threads of Rosemount Model 1153 Series B Pressure Transmitters.Initially Reported on 840919.All Transmitters Will Be Returned to Vendor)
  • ML20129H713  + (Final Deficiency & Part 21 Rept (Rdc 133(85)) Re Change in Soil Parameters Affecting Diesel Generator Bldg Floor Response Spectra.Initially Reported on 850418.Item Not Reportable Under 10CFR50.55(e) or Part 21)
  • AECM-86-0376, Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,Issued  + (Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,Issued)