Final Deficiency & Part 21 Rept ((Rdc 125(85)) Re Possible Closure Problems of Ruskin Model IBD-23 Fire Dampers. Initially Reported on 850129.Dampers/sys Modified.Work Will Be Completed by 851213
ML20138N655
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/11/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-85, REF-PT21-86-006-000 ((RDC-125(85)), PT21-86-006-000, PT21-86-6, PY-CEI-OIE-0152, PY-CEI-OIE-152, RDC-125(85), NUDOCS 8512240100
Download: ML20138N655 (2)


Text

.

b(Y\\0 t

Tile CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P O. BOX 5000 - CLEVELANo, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG - 55 PUBLICSOUARE i

l Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT l

NUC LE AR I

December 11, 1985 i

PY-CEI/OIE 0152 L 1

Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Possible Malfunctions of Ruskin Supplied Fire Dampers

[RDC 125(85)]

Dear Mr. Keppler:

This letter serves as the final report pursuant to 10CFR50.55 (e) on the poten-tial deficiencies associated with Ruskin supplied fire damper closure under normal air flow.

Mr. J. McCormick-Barger of your office was first notified on January 29, 1985, by Mr. R. G. Solt of The Cleveland Electric Illuminating Company (CEI) that this problem was being evaluated per Deviation Analysis Report 221. Our first and second interim reports were filed Febrtiary 27, 1985, and April 30, 1985, respectively.

Description of Deficiency In mid-January 1985. CEI was advised by its contractor, Robert Irsay Co., of a 10CFR21 report filed by their supplier Ruskin concerning possible closure problems of Model #IBD-23 fire dampers supplied for use at the Perry Nuclear l

Power Plant (PNPP). The 10CFR21 Report states that Ruskin had performed tests l

{

which did not provide assurance that the dampers installed inside ductwork j

would close under air flow conditions.

i Analysis of Safety Implication The potential of certain dampers to close improperly and thus fail to provide a three (3) hour fire barrier could impact the ability of safe shutdown equipment to perform its designated function and would represent a violation of 10CFR50 Appendix R.

For this reason the problem is considered reportable.

h 2fDOCK 05000440 ~

DEC 13 086 0100 851211 S

PDR Qh' I E '17 1

Mr. James G. Kappler December 11, 1985 PY-CEI/0IE 0152 L Corrective Action Of the 482 dampers supplied by Ruskin to PNPP, 338.were installed in common facilities, and 72 each in Units 1 and 2.

Relative to the operation of Unit 1, modifications affecting 173 dampers were required for compliance with 10CFR50 Appendix R.

The dampers / systems were modified according to the criter4a recommended by Ruskin and statically tested per the PNPP Fire Protection Program. In addition, a dynamic test was performed for the worst case air velocity for each damper type / configuration to demonstrate closure under air flow.

All work involving the modification and testing of these 173 fire dampers required, for compliance with Appendix' R will be complete by December 13, 1985.

All work involving the modification and testing of dampers located in non-Appendix R barriers will also be completed by December 13, 1985. Therefore our request for deferral of non-Appendix R damper modifications identified in our October 11, 1985, letter PY-CEI/NRR-0374L is hereby withdrawn.

Unit 2 completion will be consistent with the Unit 2 construction schedule.

Sincerely, Murray R. Edelman l

Vice President l

Nuclear Group MRE:sab cc:

J. A. Grobe USNRC Site Office J. J. Stefano, Project Manager Licensing Branch No. 1 U.S. Nuclear Regulatory Commission Wachington, D.C.

20555 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 t

._,