Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000368/FIN-2016001-02 + (Failure to Follow Design Control Requirements for Pump Seal Cooler Replacements)
- 05000323/FIN-2009009-01 + (Failure to Follow Design and Configuration Control Requirements)
- 05000445/FIN-2008004-02 + (Failure to Follow Diesel Generator Test Procedure)
- 05000400/FIN-2015008-02 + (Failure to Follow EPM-410 Procedure)
- 05000397/FIN-2011005-04 + (Failure to Follow Earthquake Abnormal Procedure)
- 05000301/FIN-2016001-01 + (Failure to Follow Electrical Safety Procedures Results in Plant Transient)
- 05000324/FIN-2014005-02 + (Failure to Follow Emergency Diesel Generator No. 3 Monthly Load Test Surveillance Procedure)
- 05000327/FIN-2009004-01 + (Failure to Follow Emergency Diesel Generator Operating Procedure)
- 05000263/FIN-2011004-02 + (Failure to Follow Emergency Diesel Generator Quarterly Surveillance Procedure)
- 05000275/FIN-2009004-03 + (Failure to Follow Emergency Operating Procedures Following a Reactor Trip)
- 05000261/FIN-2015002-02 + (Failure to Follow Engineering Change Procedure for Modification of RPS)
- 05000321/FIN-2008002-02 + (Failure to Follow Equipment Clearance Procedures Results in Control Room Ventilation Inoperability)
- 05000395/FIN-2014007-02 + (Failure to Follow Failure to Follow Corrective Action Program Procedures)
- 05000456/FIN-2016001-01 + (Failure to Follow Fire Prevention for Hot Work Procedure)
- 05000266/FIN-2015004-01 + (Failure to Follow Fire Protection Program Requirements for Care, Use and Maintenance of Fire Hose)
- 05000395/FIN-2012002-07 + (Failure to Follow Fire Protection Program Requirements for Procurement and Use of Approved Fire Hose)
- 05000498/FIN-2016010-01 + (Failure to Follow Fire Protection Program Procedure Requirements)
- 05000368/FIN-2017002-01 + (Failure to Follow Fire Protection Program Procedures)
- 05000272/FIN-2014002-01 + (Failure to Follow Fire Protection Test Procedure Resulted in Fuel Oil Spill)
- 05000263/FIN-2011010-01 + (Failure to Follow Fire Water Aging Management Program Implementing Procedure)
- 05000282/FIN-2015001-02 + (Failure to Follow Foreign Material Exclusion Procedure during Reactor Coolant Pump Seal Replacement)
- 05000389/FIN-2014004-01 + (Failure to Follow Foreign Material Exclusion Requirements in Reactor Vessel Maintenance Procedures)
- 05000338/FIN-2015004-01 + (Failure to Follow Foreign Material Exclusion Procedure)
- 05000271/FIN-2011002-01 + (Failure to Follow Foreign Material Exclusion Procedure)
- 05000530/FIN-2009010-01 + (Failure to Follow Foreign Material Exclusion Requirements)
- 05000400/FIN-2012003-02 + (Failure to Follow Fuel Handling Procedure)
- 05000311/FIN-2018003-02 + (Failure to Follow Generic Letter 89-13 Program Procedure)
- 05000528/FIN-2012003-01 + (Failure to Follow Hot Work Permit Procedure)
- 05000285/FIN-2011006-07 + (Failure to Follow Housekeeping Program Requirements)
- 05000397/FIN-2009008-03 + (Failure to Follow Housekeeping Program Requirements)
- 05000498/FIN-2015002-01 + (Failure to Follow Hurricane Plan Procedure to Secure Missile Hazards During Tropical Storm Bill)
- 05000305/FIN-2009004-06 + (Failure to Follow ISFSI Loading Procedure Step)
- 05000440/FIN-2009003-02 + (Failure to Follow Industrial Safety Manual Results in Damage to Fuel Handling Building Roll-up Door)
- 05000456/FIN-2016003-02 + (Failure to Follow Inservice Testing Requirements for the 2A Essential Service Water Pump Leads to an Invalid Test)
- 05000219/FIN-2012005-01 + (Failure to Follow Inspection and Torquing of Bolted Connection Procedure)
- 05000285/FIN-2015002-09 + (Failure to Follow Instructions and Procedures Related to Snubber Activities)
- 05000445/FIN-2013005-01 + (Failure to Follow Instructions for Containment Sump Inspection Results in Debris Left in the Sump)
- 05000382/FIN-2015002-02 + (Failure to Follow Instructions in Painting Procedure while Painting on Safety-Related Equipment)
- 05000293/FIN-2014003-03 + (Failure to Follow Licensed Operator Medical Requirements)
- 05000440/FIN-2014005-03 + (Failure to Follow Licensee Procedure to Properly Screen and Evaluate Temporary Changes to Plant Facilities / Structures, Systems, or Components)
- 05000413/FIN-2016004-01 + (Failure to Follow Lockout Relay Testing Procedure)
- 05000445/FIN-2011003-07 + (Failure to Follow Maintenance Instructions Causes Inadvertent Valve Closure)
- 05000323/FIN-2016004-01 + (Failure to Follow Maintenance Procedure Resulted in Improper Configuration of Safety Related Equipment)
- 05000414/FIN-2018003-01 + (Failure to Follow Maintenance Procedure Results in Damage to the 2A EDG During Testing)
- 05000391/FIN-2016002-08 + (Failure to Follow Maintenance Procedure Results in overspeed trip of the 2C-S Turbine Driven Auxiliary Feedwater Pump)
- 05000456/FIN-2009005-05 + (Failure to Follow Maintenance Procedures and Work Instructions)
- 05000286/FIN-2008004-02 + (Failure to Follow Maintenance Procedures Results in Degraded EDG for 37 Days)
- 05000249/FIN-2018003-01 + (Failure to Follow Maintenance Procedures for Assembling Unit 3 HPCI Room Cooler Fan)
- 05000272/FIN-2017003-03 + (Failure to Follow Maintenance Procedureto Assure Proper Installation of Service Water Check Valve)
- 05000456/FIN-2011004-08 + (Failure to Follow Maintenance Rule Procedure)
- 05000397/FIN-2011004-02 + (Failure to Follow Maintenance and Lubrication Procedures)