Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263B421 + (Diagrammatic Layout of Reactor Coolant System)
- ML20263B360 + (Diagrammatic Layout of Reactor Coolant System)
- ML20263B278 + (Diagrammatic Layout of Reactor Coolant System)
- ML20262J403 + (Diagrammatic Layout of Reactor Coolant System)
- ML20262J400 + (Diagrammatic Layout of Reactor Coolant System)
- ML20262J397 + (Diagrammatic Layout of Reactor Coolant System)
- ML19317D558 + (Diagrammatic Layout of Svc Water Sys,Auxiliary & Reactor Bldgs. Diagram Superceded)
- ML19317D559 + (Diagrammatic Layout of Svc Water Sys,Turbine Room. Diagram Superceded)
- ML20259E140 + (Diagrammatic Layout:Auxiliary Bldg High Activity Sump Drains Sys)
- ML20259E137 + (Diagrammatic Layout:Auxiliary Bldg Low Activity Sump Drains Sys)
- ML20259E180 + (Diagrammatic Layout:Condenser Circulating Water Sys)
- ML20259E127 + (Diagrammatic Layout:Coolant Treatment Sys (Coolant Storage Portion))
- ML20259E194 + (Diagrammatic Layout:Gaseous Waste Disposal Sys)
- ML20259E187 + (Diagrammatic Layout:Gaseous Waste Disposal Sys)
- ML20259E144 + (Diagrammatic Layout:Liquid Waste Disposal Sys (Spent Resin Storage))
- ML20259E174 + (Diagrammatic Layout:Svc Water Sys Auxiliary & Reactor Bldgs)
- ML15237A014 + (Diagrams - August 25, 2015 Meeting)
- ML19221A302 + (Diagrams Location of NRC Trailers at Facility)
- ML19224C876 + (Diagrams of Parts of TMI Electrical Sys,Including Condensate Booster Pump,Reactor Coolant & Control Switch Development)
- ML19210D918 + (Diagraph-Fault Tree Methodology for Assessment of Matl Control Sys)
- ML22124A301 + (Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022)
- PMNS20181267, Dialogue on NRC Environmental Qualification Inspections + (Dialogue on NRC Environmental Qualification Inspections)
- ML20259E132 + (Diamgrammatic Layout:Liquid Waste Disposal Sys (Miscellaneous Waste Portion))
- ML18085A560 + (Diane Curran, Representing Eureka County, Nv, Comments Regarding the February 27 - 28, 2018 Licensing Support Network Advisory Review Panel Meeting)
- ML23144A341 + (Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site)
- ML20266A118 + (Diaphragm Actuated Control Valve)
- ENS 48976 + (Diaphragms May Not Be Qualified for Specific Radiation Design Conditions)
- ML22027A823 + (Dibr Request Letter to Office of the Federal Register (Ofr) for ASME Code Case 39)
- ML22102A289 + (Dic Modernization Fee Exemption)
- ML070720290 + (Dicentra Eximia in Flora of North America)
- ML22165A022 + (Dickinson County Road Commission, Mi 60-Day Expiry Notification for Lic. No. 21-24463-01)
- ML22145A249 + (Dicksonb-w16-bio)
- ML20147C206 + (Dicusses 871208 Prehearing Conference Re Admissibility of Proposed Contention 1.NRC Remains Opposed to Admission of Proposed Contention for Reasons Set Forth in NRC 871116 & 1203 Responses,W/Exception of Aspect Re Evaluation)
- ML20149C534 + (Dicusses Attendance at INPO Accreditation Board Meeting on 871022 & 23 in Atlanta,Ga Re Accreditation of Licensee Training Programs on Maint & Technical Support Areas.Future NRC Observers Should Be Given Info Prior to Meeting)
- ML20136C285 + (Dicusses Depth of Monitor Well)
- ML19263D542 + (Dicusses Effect of Current Us Policy Towards Taiwan on General Atomic Application to Export Low Enriched U.Congress Desire for Continued Cooperation & Presidential Decision to Break Diplomatic Ties Necessitate Further Review of License)
- ML20235F545 + (Dicusses Findings Re Edlow Intl Co 870114 Application to Import 500,000 Kg U as Natural UF6.UF6 Will Be Enriched by DOE & Used in LWRs in Us,Euratom Community,Japan,Taiwan or South Korea.Importation Will Not Be Inimical for Defense)
- ML20010G070 + (Dicusses IE Insp of Licenses 34-06903-05 & 34-06903-10 on 810713-15 & Forwards Notice of Violation)
- ML20038A070 + (Dicusses Two Abnormal occurrences,AO-14-73 & AO-15-73,which Occurred on 731103 & 07 Respectively.On 731103,shutdown Margin Testing Began Before Neutron Monitoring Sys Checks Were Performed (AO-14-73).W/o AD-14-73 Rept)
- ML20202F668 + (Dicusses Vocal Alleger Who Called Re OI Investigation on Union Guy.Nrc Conducted Insp & Need to Document Results in Insp Rept.Alleger Claims That Investigation Causing Hardships for Union Guy)
- 05000317/FIN-2009002-03 + (Did Not Comply with Technical Specification Requirements While Starting Reactor Coolant Pumps)
- 05000317/FIN-2010003-03 + (Did Not Establish Preventative Maintenance Program for Switchyard Panels)
- 05000317/FIN-2009002-01 + (Did Not Follow MSIV Actuator System Procedure)
- 05000317/FIN-2009002-04 + (Did Not Follow Radiation Protection Procedures)
- 05000317/FIN-2009004-02 + (Did Not Implement Corrective Action Program Procedure Requirements)
- 05000317/FIN-2011005-01 + (Did not adequately prescribe and implement procedures associated with protected equipment)
- ML12223A445 + (Diervilla Lonicera 2010: UW-Stevens Point Freckmann Herbarium: Plant Details Page)
- ML20262D301 + (Diesel - Generator Bldg Elevations,Sections & Details)
- ML20263G481 + (Diesel - Generator Bldg Floor & Roof Plans)
- ML20262D300 + (Diesel - Generator Bldg Floor & Roof Plans)
- ML20265C548 + (Diesel Dj System Air Cooler Coolant Flow Diagram. Sheet 01 of 01)