ML20262J397
From kanterella
Jump to navigation
Jump to search
ML20262J397 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 08/25/1982 |
From: | DUKE POWER CO. |
To: | |
Shared Package | |
ML15238A706 | List: |
References | |
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM PO-100A-1, NUDOCS 8212070357 | |
Download: ML20262J397 (1) | |
Similar Documents at Oconee | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20262J4061982-12-0101 December 1982
[Table view]Diagrammatic Layout of Low Pressure Injection & Core Flooding System. Revision Date Illegible ML20262J4121982-12-0101 December 1982 Diagrammatic Layout of Low Pressure Injection & Core Flooding System. Revision Date Illegible ML20262J4201982-12-0101 December 1982 Diagrammatic Layout of Demineralized Water System (Auxiliary & Reactor Building). Revision Date Illegible ML20262J4241982-10-20020 October 1982 Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion) ML20262J4031982-08-27027 August 1982 Diagrammatic Layout of Reactor Coolant System ML20262J3971982-08-25025 August 1982 Diagrammatic Layout of Reactor Coolant System ML20262J4221982-07-0505 July 1982 Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion) ML20262J4141982-03-15015 March 1982 Diagrammatic Layout of Demineralized Water System (Auxiliary & Reactor Building) ML20262J4001981-11-30030 November 1981 Diagrammatic Layout of Reactor Coolant System ML20263H7121981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 838 Ft & El 844 Ft Safe Load Paths ML20263H6981981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 809 Ft 3 Inches Safe Load Paths ML20263H7171981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 771 Ft Safe Load Paths ML20263H7241981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H7271981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 809 Ft 3 Inches Safe Load Paths ML20263H7281981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 809 Ft 3 Inches Safe Load Paths ML20263H7311981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 822 Ft Safe Load Paths ML20263H7341981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 822 Ft Safe Load Paths ML20263H7361981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 838 Ft Safe Load Paths ML20263H7381981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H7411981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 809 Ft 3 Inches Safe Load Paths ML20263H7431981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 838 Ft & El 844 Ft Safe Load Paths ML20263H7101981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H7081981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 838 Ft Safe Load Paths ML20263H7051981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 838 Ft Safe Load Paths ML20263H7021981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 822 Ft Safe Load Paths ML20263H7001981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 809 Ft 3 Inches Safe Load Paths ML20263H7191981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 783 Ft 9 Inches Safe Load Paths ML20263H6951981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H6911981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H6871981-08-13013 August 1981 General Arrangement:Spent Fuel Pool & Hot Machine Shop Plan and Sections Safe Load Paths ML20263H6841981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan - El 783 Ft 9 Inches Safe Load Paths ML20263H6731981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan - El 771 Ft Safe Load Paths ML20263H7211981-08-13013 August 1981 General Arrangement:Auxiliary Building Plan at El 796 Ft 6 Inches Safe Load Paths ML20263H7461981-08-13013 August 1981 General Arrangement:Spent Fuel Pool Plans & Sections Safe Load Paths ML20263H6801981-08-12012 August 1981 General Arrangement:Auxiliary Building Plan - El 783 Ft 9 Inches Safe Load Paths ML20263H6761981-08-12012 August 1981 General Arrangement:Auxiliary Building Plan - El 771 Ft Safe Load Paths ML20263H7151981-08-12012 August 1981 General Arrangement:Auxiliary Building Plan at El 758 Ft Safe Load Paths ML20263H6691981-08-12012 August 1981 General Arrangement:Auxiliary Building Plan - El 758 Ft Safe Load Paths ML20263F8361981-07-21021 July 1981 Standby Shutdown Facility - General Arrangement - Hoist and Crane Schedule ML20262K8061981-06-26026 June 1981 General Arrangement:Turbine Building Safe Load Paths Mezzanine Floor Plan - El 796+6. No Revision Date ML20262K7981981-05-0707 May 1981 Reactor Auxiliary and Turbine Buildings,General Arrangement Hoist and Crane Schedule ML20262J4171981-04-0202 April 1981 Diagrammatic Layout of Demineralized Water System (Auxiliary & Reactor Building) ML20262K8081980-09-0808 September 1980 General Arrangement:Turbine Building Safe Load Paths Operating Floor Plan - El 822+0 ML20262K8161980-09-0808 September 1980 General Arrangement:Turbine Building Safe Load Paths Operating Floor Plan - El 822+0 ML20262K8001980-03-25025 March 1980 General Arrangement:Turbine Building Safe Load Paths Operating Floor Plan - El 822+0 ML20262J4091979-09-0404 September 1979 Diagrammatic Layout of Low Pressure Injection & Core Flooding System ML20262K8191979-02-22022 February 1979 General Arrangement:Turbine Building Safe Load Paths Mezzanine Floor Plan - El 796+6 ML20262K8031975-03-24024 March 1975 General Arrangement:Turbine Building Safe Load Paths Basement Floor Plan - El 775+0 ML20262K8131969-03-0303 March 1969 General Arrangement:Turbine Building Safe Load Paths Basement Floor Plan - El 775+0 ML20262K8111969-03-0303 March 1969 General Arrangement:Turbine Building Safe Load Paths Mezzanine Floor Plan - El 796+6 1982-08-27 Category:DRAWINGS MONTHYEARML20266E0831995-02-17017 February 1995
[Table view]Conceptual Security Computer System Upgrade ML20266E0781995-02-17017 February 1995 Conceptual Security Computer Sys Upgrade ML20262D3391994-06-14014 June 1994 Arrgt Reactor Vessel Sections ML20262B8251994-02-0303 February 1994 Flow Diagram of Condenser Circulation Water System Normal Intake Discharge.Sheet 4 of 5 ML20262D4241993-05-0303 May 1993 Core Flooding Nozzle ML20262D6811992-10-0505 October 1992 Flow Diagram of High Pressure Injection System Charging System ML20262D7851992-10-0101 October 1992 Flow Diagram of Emergency Feedwater System ML20266H7111992-10-0101 October 1992 Flow Diagram of Main Steam Emergency Fdw Pump Turbine Steam Supply and Exhaust ML20266H7221992-09-29029 September 1992 Flow Diagram of High Pressure Injection System Charging Section ML20262D7241992-09-29029 September 1992 Flow Diagram of Reactor Coolant System Pressurizer ML20262D7051992-09-29029 September 1992 Flow Diagram of High Pressure Injection System Storage Section ML20262D6731992-09-29029 September 1992 Flow Diagram of LOW Pressure Injection System Borated Water Supply and LPI Pump Suction ML20266H7261992-09-29029 September 1992 Flow Diagram of High Pressure Injection System Storage Section ML20262D6951992-09-29029 September 1992 Flow Diagram of High Pressure Injection System Charging Section ML20262D8211992-09-29029 September 1992 Flow Diagram of High Pressure Injection System Charging Section ML20262D6611992-09-28028 September 1992 Flow Diagram of Reactor Building Spray System Bs ML20266H7301992-09-26026 September 1992 Flow Diagram of High Pressure Injection System Charging Section ML20262D6041992-09-23023 September 1992 Flow Diagram of Main Steam System Main Fdw Pump Turbines 3A & 3B HP & LP Steam Supply & Exhaust ML20262D7291992-09-23023 September 1992 Flow Diagram of Reactor Coolant System ML20262D6011992-09-23023 September 1992 Flow Diagram of Main Steam System Emergency Fdw Pump Turbine Steam Supply & Exhaust ML20262D6551992-09-22022 September 1992 Flow Diagram of Spent Fuel Cooling System ML20262D7721992-09-13013 September 1992 Flow Diagram of Main Steam System Main Fdw Pump Turbines 2A & 2B HP & LP Steam Supply & Exhaust ML20266H6951992-09-0101 September 1992 Flow Diagram of Condenser Circulating Water System Condensate Coolers ML20266H6851992-09-0101 September 1992 Flow Diagram of Condenser Circulating Water System Underwatering & Turbine Room Sump Pumps ML20262B8331992-09-0101 September 1992 Flow Diagram of Condenser Circulation Water System Normal Intake & Discharge.Sheet 5 of 5 ML20266H6811992-08-17017 August 1992 Flow Diagram of Lube Oil System Ssf Diesel Engines ML20262D6441992-08-13013 August 1992 Flow Diagram of Reactor Building Purge System ML20262D5341992-07-15015 July 1992 Flow Diagram of Component Cooling System Reactor Building Heat Exchangers ML20262D5431992-06-10010 June 1992 Flow Diagram of LOW Pressure Service Water System Reactor Building Cooling Units 3A 3B 3C Cooling Coils ML20262D7341992-05-13013 May 1992 Flow Diagram of Component Cooling System Reactor Building Heat Exchangers ML20262D8171992-05-11011 May 1992 Flow Diagram of High Pressure Injection System Charging Section ML20262D7611992-05-0505 May 1992 Flow Diagram of Main Steam System Emergency Fdw Pump Turbine Steam Supply & Exhaust ML20262D7531992-04-0909 April 1992 Flow Diagram of HP & LP Turbine Exhaust & Steam Seal System Chp Turbine Inlet Steam Seal Header & Feedwater Pump Turbine Steam Seals ML20262D8141992-03-24024 March 1992 Flow Diagram of LOW Pressure Injection System LPI Pump Discharge ML20262D7801992-03-12012 March 1992 Flow Diagram of Main Steam System Main Steam System 2A & 2B ML20262D8241992-03-12012 March 1992 Flow Diagram of Reactor Coolant System ML20262D7411992-03-10010 March 1992 Flow Diagram of LOW Pressure Service Water System Reactor Building Cooling Units ML20262D7761992-03-0909 March 1992 Flow Diagram of Main Steam System Turbine Bypasses ML20262D7901992-03-0303 March 1992 Flow Diagram of Feedwater System Final Feedwater ML20262B8001992-02-0606 February 1992 Flow Diagram of Main Steam System Main Steam Headers IA & Ib ML20266H7181991-11-0505 November 1991 Flow Diagram of Coolant Treatment System Concentrated Boric Acid Storage Tank ML20266H6771991-10-0808 October 1991 Flow Diagram of Breathing Air System 8A Reactor Building Air Manifolds ML20266H7071991-10-0808 October 1991 Flow Diagram of LOW Pressure Service Water System Reactor Building Cooling Units ML20262D3681991-09-30030 September 1991 Arrgt Reactor Vessel Sections ML20266H7151991-09-10010 September 1991 Purification Demineralizers ML20262D7151991-09-10010 September 1991 Flow Diagram of High Pressure Injection System Letdown Section ML20262D6301991-09-0505 September 1991 Flow Diagram of Emergency Feedwater System ML20262D5961991-05-0202 May 1991 Flow Diagram of IP & LP Turbine Exhaust & Steam Seal System HP Turbine Inlet Steam Seal Header & Feedwater Pump Turbine Steam Seals ML20262D6111991-04-0303 April 1991 Flow Diagram of Main Steam System Turbine Bypasses ML20262D5251991-03-29029 March 1991 Final Machining Pump Case Assembly Sheet 1 of 2 1995-02-17 |