Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "CAS-SAS Operational Work Station Design and Procedures". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19319A310  + (CAP Final Report)
  • ML19318G264  + (CAP Final Report)
  • ML030760067  + (CAP001763, ISI Scoping of AF-117, AF-4035, Classification of AFW Recirc !Ines, Printed 09/10/2002)
  • ML030760076  + (CAP001763, ISI Scoping of AF-117, AF-4035, Classification of AFW Recirc Lines, Printed 09/25/2002)
  • ML030760078  + (CAP001804, Inadequate 50.59 Review of Procedure Changes Made to Address AFW Pump Cooling, Printed 11/04/2002)
  • ML030730741  + (CAP002353, Weld Size for the New Vertical Air Tanks, T-21 2, Are in Question, Printed 09/10/2002)
  • ML030760140  + (CAP004037, CST Inner Coating Degrading, Printed 10/31/2002)
  • ML030760146  + (CAP017075, Questions and Concerns About the Use of Operator Action to Control AFW Flow, Printed 11/05/2002)
  • ML030760584  + (CAP028472, Auxiliary Feedwater Testing Concerns, Printed 09/10/2002)
  • ML030770338  + (CAP029261, Appendix R Classification Discrepancies in AFW Common Recirc Line)
  • ML050840506  + (CAP055527 U1R28 Nozzle Dam Installation Supplied Breathing Air Problems)
  • ML050840507  + (CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation)
  • ML050840497  + (CAP055538 Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation)
  • ML050840513  + (CAP055576 SG Manway Removal/Installation RMP Could Generate Cl Opening Without Hl Vent)
  • ML050840517  + (CAP055585 Improvement to Hot Leg Vent Path Controls Required)
  • ML050870312  + (CAP056236 Control Rod Contacted Top of Fuel Assembly During Rcca Changing)
  • ML22004A231  + (CAP88 E-Plan Eval)
  • ML22004A236  + (CAP88 E-Plan Evaluation Final)
  • ML22004A246  + (CAP88 Report for MVF-th-232wprogeny.SYN)
  • 05000254/FIN-2012007-01  + (CAPR Not Completed)
  • ML030730742  + (CARB Review Addendum, Increased CDF in AFW Model)
  • ML20263S694  + (CAS - Auxiliary Boilers Sampling Control Loop Diagram)
  • ML20263S690  + (CAS - Condenser Hotwell Sampling Control Loop Diagram)
  • ML20263S698  + (CAS - Feedwater Condensate Sampling Control Loop Diagram)
  • ML20263S686  + (CAS - Main Steam & Condensate Sampling Control Loop Diagram)
  • ML19345D264  + (CAS-SAS Operational Work Station Design and Procedures)
  • ML20151H958  + (CASMO-3G Validation)
  • ML20043C581  + (CASMO-3G Validation)
  • ML17013A134  + (CASMO-5 95/95 Tolerance Limits for Measured Reactivity Decrement Biases of the Epri/Studsvik Burnup Benchmark. Part 1 of 2)
  • ML17010A255  + (CASMO-5 95/95 Tolerance Limits for Measured Reactivity Decrement Biases of the Epri/Studsvik Burnup Benchmark. Part 1 of 2)
  • ML17013A135  + (CASMO-5 95/95 Tolerance Limits for Measured Reactivity Decrement Biases of the Epri/Studsvik Burnup Benchmark. Part 2 of 2)
  • ML17010A256  + (CASMO-5 95/95 Tolerance Limits for Measured Reactivity Decrement Biases of the Epri/Studsvik Burnup Benchmark. Part 2 of 2)
  • ML20266E156  + (CAST Steel Press.Seal NON-RETURN Globe Valve.Sheet 1. Actual Drawing Number:Mcm 1205.00-0095)
  • ML21099A074  + (CAT_2021-02 Document Request for Upcoming RP Inspection)
  • ML18059B181  + (CB&I Areva MOX Services - (U) Submittal of the February 2018 Revision of the Physical Protection Plan for the Mixed Oxide Fuel Fabrication Facility)
  • ML17339A201  + (CB&I Areva MOX Services - Mixed Oxide Fuel Fabrication Facility PSSC-039 Completion Letter)
  • ML18262A302  + (CB&I Areva MOX Services - Request for Conforming Amendment to Construction Authorization No. CAMOX-001 Regarding Corporate Name Change)
  • ML18022A812  + (CB&I Areva MOX Services - Submittal of 2018 Redacted License Application)
  • ML18022A827  + (CB&I Areva MOX Services - Submittal of Summary of Facility Changes During 2017)
  • ML18228A843  + (CB&I Areva MOX Services - Supplemental Information in Support of Threshold Determination Request and May 8, 2018 Notification of Change in Ownership with No Transfer of Control)
  • PMNS20180257, CB&I Areva MOX Services Annual Performance Assessment Meeting  + (CB&I Areva MOX Services Annual Performance Assessment Meeting)
  • ML17339A183  + (CB&I Areva MOX Services Mixed Oxide Fuel Fabrication Facility PSSC-011 Completion Letter)
  • ML18008A222  + (CB&I Areva MOX Services, LLC - 2017 MOX Project Quality Assurance Plan Update)
  • ML17339A186  + (CB&I Areva MOX Services, LLC - PSSC-015 Completion Letter)
  • ML18058A943  + (CB&I Areva MOX Services, LLC - Submittal of 2018 Updated ISA Summary)
  • ML18058A927  + (CB&I Areva MOX Services, LLC - Submittal of 2018 Updated License Application)
  • ML18261A363  + (CB&I Areva MOX Services, LLC - Submittal of February 2018 Revision of Safeguards Contingency & Response Plan)
  • ML18022A814  + (CB&I Areva Mox Services, LLC - Mixed Oxide Fuel Fabrication Facility - License Application (Redacted))
  • ML18059B095  + (CB&I Arey a MOX Services - Submittal of February 2018 Revision of Classified Matter Protection Plan)
  • ML17355A100  + (CB&I Arey a MOX Services, Submittal of Amendment Number: MPQAP-2017-0001 of the MOX Project Quality Assurance Plan)
  • ML20092C700  + (CB&I Job Specific Safety Plan Recirculation & RHR Piping Replacement Unit II Drywell,Peach Bottom Atomic Power Station,Mods 1278 & 1367)