Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 8.0 - Electric Power + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 8.0 - Electric Power)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 16.0 - Technical Specifications + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 16.0 - Technical Specifications)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix E - Requirements Resulting from the TMI-2 Accident + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix E - Requirements Resulting from the TMI-2 Accident)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 10.0 - Steam and Power Conversion System + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 10.0 - Steam and Power Conversion System)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix D - Computer Programs + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix D - Computer Programs)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 4.0 - Reactor + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 4.0 - Reactor)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, UFSAR Page Index + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, UFSAR Page Index)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 15.0 - Accident Analyses + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 15.0 - Accident Analyses)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 17.0 - Quality Assurance + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 17.0 - Quality Assurance)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 11.0 - Radioactive Waste Management + (Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 11.0 - Radioactive Waste Management)
- RA-14-032, Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pa + (Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pag)
- NEI 99-01, Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pa + (Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2A, and 2B, Cover Through Pag)
- RS-14-338, Braidwood, Units 1 and 2, Byron, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26. (Redacted Version) + (Braidwood, Units 1 and 2, Byron, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26. (Redacted Version))
- ML14030A264 + (Braidwood, Units 1 and 2, Response to NRC Request for Additional Information, Dated December 20, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Repor)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.1-1 Through Figure 2.4-51 + (Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.1-1 Through Figure 2.4-51)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5.53 + (Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5.53)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases + (Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual + (Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.5-1 Through Figure 2.5-319 + (Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.5-1 Through Figure 2.5-319)
- ML040610869 + (Braidwood/Byron - Issuance of Amd 136/130 One Time Change to the Completion Time for Restoration of a Unit Specific Essential Service Water Train. (Tacs. MB9547. MB9548, MB9545, MB9546))
- ML080390544 + (Braidwood/Byron Amag Investigation of Organizational Effectiveness and Decision Making)
- ML15355A083 + (Braidwood/Byron Backfit Appeal)
- ML17034A181 + (Braidwood/Byron UFSAR Excerpt)
- ML17034A355 + (Braidwood/Byron UFSAR Excerpt)
- ML082130136 + (Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators)
- ML080860670 + (Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Issuance of Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators. (Tacs MD6364)
- ML13178A244 + (Braidwood_Noi_Frn)
- PMNS20190493, Brainstorming and Scoping Workshop on the NRC Initiatives for Building a Smarter Fuel Cycle Licensing and Oversight Program + (Brainstorming and Scoping Workshop on the NRC Initiatives for Building a Smarter Fuel Cycle Licensing and Oversight Program)
- ML20196J166 + (Bran-Shon,Inc QA Program)
- ML16005A632 + (Brancato Notice of Withdrawal)
- ML102980108 + (Branch 3 Daily Status)
- ML102950566 + (Branch 3 Daily Status)
- ML102950563 + (Branch 3 Daily Status)
- ML102950561 + (Branch 3 Daily Status)
- ML102950560 + (Branch 3 Daily Status)
- ML102950541 + (Branch 3 Daily Status)
- ML102950458 + (Branch 3 Daily Status)
- ML102950457 + (Branch 3 Daily Status)
- ML102950405 + (Branch 3 Daily Status)
- ML102950398 + (Branch 3 Daily Status)
- ML102950394 + (Branch 3 Daily Status)
- ML102950264 + (Branch 3 Daily Status)
- ML102950239 + (Branch 3 Daily Status)
- ML102950214 + (Branch 3 Daily Status)
- ML102950182 + (Branch 3 Daily Status)
- ML102950452 + (Branch 3 Status)
- ML051450517 + (Branch 6, Management Directive 8.3 Check Sheet for 3/15/04 Millstone Unit 2 Turbine Trip)
- ML051450513 + (Branch 6, Management Directive 8.3 Check Sheet for 3/6/04 Millstone Unit 2 Turbine Trip)
- ML063060013 + (Branch Chief)
- ML092680157 + (Branch Chief Assignment)
- ML092680169 + (Branch Chief Assignment)
- ML071090527 + (Branch Chief Assignment - Beaver Valley Power Station, Unit Nos. 1 and 2)
- ML071090586 + (Branch Chief Assignment - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2)
- ML071090630 + (Branch Chief Assignment - James A. Fitzpatrick Nuclear Power Plant, Indian Point Nuclear Generating Unit Nos. 2 and 3, Pilgrim Nuclear Power Station, and Vermont Yankee Nuclear Power Station)
- ML071100037 + (Branch Chief Assignment - Nine Mile Point Nuclear Station, Unit Nos. 1 and 2)
- ML071090645 + (Branch Chief Assignment - R. E. Ginna Nuclear Power Plant)
- ML071100047 + (Branch Chief Assignment - Susquehanna Steam Electric Station, Units 1 and 2)
- ML063060016 + (Branch Chief Assignment Letter)
- ML092680145 + (Branch Chief Assignment Letter)
- ML092680100 + (Branch Chief Assignment Letter)
- ML092680121 + (Branch Chief Assignment Letter)
- ML092680187 + (Branch Chief Assignment Letter)
- ML082401686 + (Branch Chief Assignment Letter)