Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266D415 + (Base EI100L.Sheet 1 of 2)
- ML20266D420 + (Base EI100L.Sheet 2 of 2)
- ML20266D468 + (Base Ei 100B C.Sheet 1 of 1)
- ML20266D021 + (Base Firelite CP300 1000K.Sheet 2 of 2)
- ML20266D056 + (Base Firelite CP300.Sheet 1 of 2)
- ML20266D479 + (Base First Used Ei 100L.Sheet 1 of 2)
- ML20266D668 + (Base First Used Ei 100L.Sheet 2 of 2)
- ML19331D465 + (Base Input for Loft RELAP5 Calculations)
- ML20266C671 + (Base Intelligent 200 Series.Sheet 1 of 1)
- ML20266D075 + (Base Intelligent Detector Next Gen Plug In.Sheet 1 of 1)
- ML061070121 + (Base Map of VB-7, Braidwood Station)
- ML20262D727 + (Base Plate)
- ML20265C716 + (Base Plate Assy Backscatter Head)
- ML20265C680 + (Base Plate Assy Backscatter Head)
- ML20265C706 + (Base Plate Backscatter Head)
- ML19291B061 + (Base Plate Structural Analysis Sys,Ansys Pre- & Post-Processors for Finite Element Data Generation & Load Summary, Revision B)
- ML23066A086 + (Base SPAR Model Human Failure Event Application of IDHEAS-ECA)
- ML23195A134 + (Base Standardized Plant Analysis Risk (SPAR) Model Human Failure Event Application - Slides)
- ML20265B149 + (Base Styline AC Single Pcb.Sheet 1 of 3)
- ML20265B190 + (Base Styline AC Single Pcb.Sheet 2 of 3)
- ML20265B194 + (Base Styline AC Single Pcb.Sheet 3 of 3)
- ML20262D760 + (Base Sub-Assy)
- ML20260B839 + (Base,1,000 Series Cask)
- ML20260B581 + (Base,100 Series Cask)
- ML20260B550 + (Base:702 Series Cask)
- ML19309E930 + (Base:Model 200 Cask)
- ML20260D534 + (Base:Model 600 Cask)
- ML19276E639 + (Based on 780418 Response,All Conditions That Would Disable a Diesel Generator Are Clearly Indicated in Control Room. Response Is Acceptable)
- ML19289D798 + (Based on 790116 Telcon & Previous NRC 781208 Decision, Financial Schedules & Forecasts Submitted 780623 & 30 Do Not Meet 10CFR2.790 Requirements & Will Be Placed in NRC PDR & Lpdr.W/Relevant Communications)
- IR 05000386/1978026 + (Based on 790209 Meeting & 790213 Telcon,Util Will Revise Reply to 781214 Notice of Violation Contained in Insp Rept 50-386/78-26,to Clarify Intent to Establish Offsite Safety Review Committee)
- ML20147D219 + (Based on Evidence to Date,Fault 5 Is Not Capable W/In Meaning of 10CFR100.Due to Apparent Association of Fault 5 to Faults Previously Described,Staff Does Not Feel Site Visit Is Necessary)
- ML20216B126 + (Based on Info Submitted by Application Delivered on 830421, Concludes That Model 4493-97 Scanner Flask Acceptable for Custom Licensing Purposes in Accordance W/Conditions of Encl Certificate of Registration)
- ML19220A391 + (Based on Overwhelming Statutory Evidence & Past Practice of Aslab in ALAB-237 & ALAB-251,requests Initial Decision in Proceeding Be Remanded to ASLB for Evidentiary Review)
- ML19220B598 + (Based on Results of IE Insp Rept 50-320/75-08 on 750717, Requests Technical Assistance Re Deviations Related to Activities Surrounding Const of Grouted post-tensioning Sys for Containment Structure)
- ML19322A313 + (Based on Review of 790228 Info Re Decay Heat Pump impeller- to-casing Rubbing,No Effects or Results of Rubbing Could Be Noted)
- ML17209A815 + (Based on Review of ALAB-603,some Interim Procedures & Training for Station Blackout Should Be Implemented During Task A-44 Implementation)
- ML19246A490 + (Based on Review of All Applications for Amend to Facility License,Determined That None Have Any Bearing on Phase II Issues)
- ML19282A883 + (Based on Review of Application Submitted by Schlumberger Well Svc on 790105,Model NLS-RF Shipping Container Meets IAEA Requirements)
- ML19220B620 + (Based on Review of IE Insp Rept 50-320/75-08,recommends Util Incorporate Specs in Amend to FSAR Covering Const of Reactor Bldg)
- ML19206A852 + (Based on Review,Environ Rept Is Satisfactory Except for Section Dealing W/Noise Omissions.Recommends Rept Be Sent to Tri-County Regional Planning Commission & Doa for Input)
- ML19206A809 + (Based on Safety Review of Proposed Facility,Final Design & Safety Analysis Must Be Thoroughly Evaluated Prior to Issuance of Provisional OL)
- ML13333A357 + (Based on Util 781120 Response Re Review of Potential Boron Dilution Incidents & Determination That FSAR Analysis Represents Most Limiting Case,No Further Action Is Needed)
- NLS2007070, Baseline Data for the Metamic Neutron Poison Coupons + (Baseline Data for the Metamic Neutron Poison Coupons)
- IR 05000315/2017502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000315/2017502; 05000316/2017502)
- IR 05000237/2017502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000237/2017502; 05000249/2017502 (Gph))
- IR 05000440/2018503 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2018503 (DRS-G.Hansen))
- IR 05000331/2016502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000331/2016502 (Gph))
- IR 05000461/2017502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000461/2017502 (Gph))
- IR 05000266/2017502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000266/2017502; 05000301/2017502 (DRS-M.Garza))
- IR 05000456/2016502 + (Baseline Emergency Preparedness Biennial Exersice Inspection Report 05000456/2016502; 05000457/2016502 (Gph))
- IR 05000346/2017502 + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000346/2017502)