Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Base:Model 200 Cask". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20260D534  + (Base:Model 600 Cask)
  • ML19276E639  + (Based on 780418 Response,All Conditions That Would Disable a Diesel Generator Are Clearly Indicated in Control Room. Response Is Acceptable)
  • ML19289D798  + (Based on 790116 Telcon & Previous NRC 781208 Decision, Financial Schedules & Forecasts Submitted 780623 & 30 Do Not Meet 10CFR2.790 Requirements & Will Be Placed in NRC PDR & Lpdr.W/Relevant Communications)
  • IR 05000386/1978026  + (Based on 790209 Meeting & 790213 Telcon,Util Will Revise Reply to 781214 Notice of Violation Contained in Insp Rept 50-386/78-26,to Clarify Intent to Establish Offsite Safety Review Committee)
  • ML20147D219  + (Based on Evidence to Date,Fault 5 Is Not Capable W/In Meaning of 10CFR100.Due to Apparent Association of Fault 5 to Faults Previously Described,Staff Does Not Feel Site Visit Is Necessary)
  • ML20216B126  + (Based on Info Submitted by Application Delivered on 830421, Concludes That Model 4493-97 Scanner Flask Acceptable for Custom Licensing Purposes in Accordance W/Conditions of Encl Certificate of Registration)
  • ML19220A391  + (Based on Overwhelming Statutory Evidence & Past Practice of Aslab in ALAB-237 & ALAB-251,requests Initial Decision in Proceeding Be Remanded to ASLB for Evidentiary Review)
  • ML19220B598  + (Based on Results of IE Insp Rept 50-320/75-08 on 750717, Requests Technical Assistance Re Deviations Related to Activities Surrounding Const of Grouted post-tensioning Sys for Containment Structure)
  • ML19322A313  + (Based on Review of 790228 Info Re Decay Heat Pump impeller- to-casing Rubbing,No Effects or Results of Rubbing Could Be Noted)
  • ML17209A815  + (Based on Review of ALAB-603,some Interim Procedures & Training for Station Blackout Should Be Implemented During Task A-44 Implementation)
  • ML19246A490  + (Based on Review of All Applications for Amend to Facility License,Determined That None Have Any Bearing on Phase II Issues)
  • ML19282A883  + (Based on Review of Application Submitted by Schlumberger Well Svc on 790105,Model NLS-RF Shipping Container Meets IAEA Requirements)
  • ML19220B620  + (Based on Review of IE Insp Rept 50-320/75-08,recommends Util Incorporate Specs in Amend to FSAR Covering Const of Reactor Bldg)
  • ML19206A852  + (Based on Review,Environ Rept Is Satisfactory Except for Section Dealing W/Noise Omissions.Recommends Rept Be Sent to Tri-County Regional Planning Commission & Doa for Input)
  • ML19206A809  + (Based on Safety Review of Proposed Facility,Final Design & Safety Analysis Must Be Thoroughly Evaluated Prior to Issuance of Provisional OL)
  • ML13333A357  + (Based on Util 781120 Response Re Review of Potential Boron Dilution Incidents & Determination That FSAR Analysis Represents Most Limiting Case,No Further Action Is Needed)
  • NLS2007070, Baseline Data for the Metamic Neutron Poison Coupons  + (Baseline Data for the Metamic Neutron Poison Coupons)
  • IR 05000315/2017502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000315/2017502; 05000316/2017502)
  • IR 05000237/2017502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000237/2017502; 05000249/2017502 (Gph))
  • IR 05000440/2018503  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2018503 (DRS-G.Hansen))
  • IR 05000331/2016502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000331/2016502 (Gph))
  • IR 05000461/2017502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000461/2017502 (Gph))
  • IR 05000266/2017502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000266/2017502; 05000301/2017502 (DRS-M.Garza))
  • IR 05000456/2016502  + (Baseline Emergency Preparedness Biennial Exersice Inspection Report 05000456/2016502; 05000457/2016502 (Gph))
  • IR 05000346/2017502  + (Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000346/2017502)