ML19246A490
| ML19246A490 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 05/04/1979 |
| From: | Gray J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Rosolie E NORTHWEST ENVIRONMENTAL ADVOCATES (FORMERLY COALITION |
| References | |
| NUDOCS 7907030207 | |
| Download: ML19246A490 (1) | |
Text
_ _.
-.~ ruuLIC DL1,1Nf Il00M f
UNITED STATES NUCLEAR REGULATORY COMMISSION h,
f ;e'g.' 'N. tj WASHINGTON, C. C. 20555 f
7 May 4, 1979 3
M @,#
'l 2
Mr. Eugene Rosolie
)
M A
Coalition for Safe Power
.g f..
215 SE 9th Avenue "1@
Portland, OR 97214 In the Matter of Portland General Electric Company, et al.
(Trojan Nuclear Plant)
Docket No. 50-344 (Control Buildino)
Dear Mr. Rosolie:
At the Prehearing Conference on March 30, 1979, you asked to be informed of any applications for amendment to the Trojan operating license that have been filed and are being reviewed which are substantial in nature and have a bearing on the issues in Phase II of the referenced proceed-ing (Tr. 3210).
In this regard, the Staff has reviewed all of the applications for amendment to the Trojan license which are currently l
pending.
Based on this review, we have determined that none of the applications has any bearing on the issues involved in Phase II. As indicated in.he enclosed note from C. Trammell to J. Gray, dated May 1, 1979, until Phase II is concluded, we will continue to review any further applications for amendment to the Trojan license with a view toward possi11e relevance of such applicaticns to this proceeding. The Licens-ing Board and parties will be informed promptly of any such applications which have a bearing on Phase II.
A response to your other question - whether any of the -' julatory guides listed in PGE-1020, 63.2.2.2 are currently under review or being recon-sidered or revised (Tr.3181) - is currently being prepared and will be forwarded to you and the Licensing Board and other parties as soon as it is available.
Sincerely, h]
!ose R. Gray Counsel for NRC Staff
Enclosure:
As stated cc w/ enclosure:
Service List 273 263 7907030 [ O 7
gN UNITED STATES 7,
Ot NC' ' CAR REGULATORY COMMISSION
'O I j WASHINu i vos, w. -.wwZ s b.Chitaf 5
%,*.'../
May 1, 1979 NOTE T0:
J. Gray, Attorney, OELD FROM:
C. Trammell, Project Manager, ORB #1 Division of Operating Reactors, flRR
SUBJECT:
REMEW 0F APPLICATIONS FOR AMEtlDMENT OF TROJAN OPERATING LICEilSE AS R0 ATED TO PHASE II 0F THE C0flTROL BUILDING PROCEEDIflG I have reviewed all the applications for amendment of the Trojan license filed by PGE that are currently pending. None have.any bearing on the issues involved in Phase II of the Control Building proceeding.
Until Phase II of this proceeding is concluded, I will discuss each new incoming amendment request with you with an eye to possible relevance to this proceeding so that the board and parties can be informed in cases where there is some connection.
Y / /
))
~
g Charles M. Tranneil cc:
V. Noonan R. Vollmer B. Grimes A. Schwencer G. Lainas 273 264
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
PORTLAND GENERAL ELECTRIC COMPANY, ET AL. )
Docket Nos. 50-344
)
(Control Building)
(Troj an Nuclear Plan'.)
)
CERTIFICATE OF SERVICE I hereby certify that copies of a letter dated May 4,1979 from J.R. Gray to E.Rosolie, with enclosure, in the above-captiored proceeding have been served on the following by deposit in the United States mail, first class, or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 4th day of May,1979:
4 Marshall E. Miller, Esq., Chairman
- Richard M. Sandvik, Esq.
j Atomic Safety and Licensing Board Frank W. Ostrander, Jr.
i U.S. Nuclear Regulatory Commission Counsel for Oregon Dept. of l
Washington, DC 20555 Energy 500 Pacific Building Dr. Kenneth A. McColles, Dean 520 S.W. Yamhill Division of Engineering, Portland, OR 97204 Architecture & Technology Oklahoma State University Maurice Axelrad, Esq.
Stillwater, OK 74074 Lowensrein, Newman, Reis, l
Axelrad & Toll Dr. Hugh C. Paxton Suite 1214 1229 41st Street 1025 Connecticut Avenue, N.W.
Los Alamos, NM 87544 Washington, DC 20036 Mr. John A. Kullberg Mr. David B. McCoy Route One 348 Hussey Lane Box 250Q Grants Pass, OR 97526 Sauvie Island, OR 97231 Ms. J. Gail Parson Columbia Environmental Council 800 S.W. Green #6 203 S. 1st Street Por tland, OR 97206 St. Helens, OR 97051 273 265
H. H Phillips, Esq.
Alan S. Rosenthal, Esq.*
Vice President, Corporate Atomic Safety and Licensing Appeal Counsel and Secretary Board Portland Gener.:1 Electric Company U.S. Nuclear Regulatory Cormission 121 S.W. Salmon Street Washington, DC 20555 Portland, OR 97204 Dr. John H. Buck
- William W. Kinsey Atomic Safety and Licensing Appeal 1002 N. E. Holladay Board Portland, OR 97232 U.S. Nuclear Regulatory Cocsission Washington, DC 20555 l
Ms. Nina Bell l
728 S. E. 26th Atomic Safety and Licensing Board Portland, OR 97214 Panel
- U.S. Nuclear Regulatory Commission dr. Stephen M. Willingham Washington, DC 20555 555 N. Tomahawk Drive Portland, Oregon 97217 Atomic Safety and Licensing Appeal Panel (5)*
i Mr. Eugene Rosolie U.S. Nuclear Reg'ulatory Commission Coalition for Safe Power Washington, DC 20555 215 SE 9th Avenue Portland, OR 97214 Docketing and Service Section_(4)*
Office of the Secretary Dr. W. Reed Johnson
- U.S. Nuclear degulatory Com=ission Atomic Safety and Licensing Washington, DC 20555 i
Appeal Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 p,&
7 Y.d c,/
{
/
oseph R. Gray
/
/
/
Coungsl for NRC Staff /
273 266
..