Based on Review of ALAB-603,some Interim Procedures & Training for Station Blackout Should Be Implemented During Task A-44 Implementation
ML17209A815
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/03/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML17209A816 List:
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR ALAB-603, TAC-43912, NUDOCS 8103160780
Download: ML17209A815 (4)


Text

~-

UNITED STATES NUCLEAR REGUL ATUAY COY<<V>lSSICIN 0 ~

y ~

March 3, 1981 MEMORANOUM FOR:

J.

H. Sniezek, Oirector Oivision of Resident and Regional Reactor Inspection, I&E

~, /5v+j~~

Q/

A CL gL

~ FROM:

SUBJECT:

O.

G. Eisenhut, Oirector-Oivision of Licensing, NRR INTERIM PROCEOURES ANO TRAINING FOR STATION BLACKOUT A decision by the Atomic Safety and Licensing Appeal Board (ALAB-603) concluded that station blackout (i.e., loss of all offsite and onsite AC power) should be considered a design basis event for St. Lucie, Unit No. 2.

Me issued a

similar requirement for St. Lucie, Unit No. l.

The Hoard further reccamended that, in view of the completion schedule for Generic Task A-44 (Station Blackout),

expeditious measures should be taken to ensure that plants with a comparable station blackout likelihood can accommodate such an event.

Based on our review of ALAB-603, we have concluded that some interim measures should be taken while Task A-44 is being conducted.

As described in the memorandum to Chairman Ahearne

-.rom H.

R.

Oenton dated November 10,

1980, encIosed as Attachment 1, we plan to issue a generic letter to all licensees (except FP&L for St. Lucie, Unit Nos 1

& 2) which requests that they implement interim emergency procedures and a training program for station blackout events.

A copy of the generic letter, in the process oi being issued, is enclosed as Attachment 2.

Me request that IE verify that the emergency procedures and training programs are imolemented for all operating plants within 6 months or an alternate date accepted by the NRR staff.

Although there are no detailed acceptance criteria for this

action, a list of the basic considerations which should be addressed in the interim procedures is contained in the sample generic letter.

Should you have any questions regarding this action, contact C. Nelson (X27563).

At.achments:

As stated Oivision of Licensing cc:

See next page

+ DESIGNATED ORIGIN

~Cert'el Bg

C v ~,

1 r,

J.

H.

Sni ezek cc:

H. Oenton V. Stello R. Tedesco T. Novak E. Jordan F

i~ilraglia R. Reid G. Edison P. (dorian P. Saranowsky C. Nelson C. Grimes J.