Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17202G591 + (Audit Plan and Setup of Online Reference Portal for License Amendment Request - Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances)
- ML25041A239 + (Audit Plan by NRR to Support the Review of LAR to Revise TS 5.6.3, Core Operating Limits Report, by Updating the Listing of NRC-Approved Analytical Methods Used to Determine the Core Operating Limits FPL St. Lucie, Unit No. 2)
- ML13029A667 + (Audit Plan for 2/11-14/13, Regulatory Audit at the CS Innovations/Westinghouse Facility in Scottsdale, Az, to Support Digital Replacement of Process Protection System License Amendment Request (TAC Nos. ME7522-ME7523))
- ML091940092 + (Audit Plan for Aging Management Program Site Audit Regarding Duane Arnold Energy Center License Renewal Application)
- ML090930256 + (Audit Plan for Aging Management Program Site Audit Regarding Cooper Nuclear Station Unit 1, License Renewal Application (Tac No. MD9737))
- ML12086A137 + (Audit Plan for Audit at Westinghouse - Thermal Conductivity Degradation in LBLOCA Analyses)
- ML16193A332 + (Audit Plan for August 3-4, 2016, Nrr/Dra/Arcb Regulatory Audit at Westinghouse Facility in Rockville, MD, to Support Review of License Amendment Request for Adoption of Alternative Source Term)
- ML25216A095 + (Audit Plan for Blue Energy Topical Report BE-BOPTR-02)
- ML13182A048 + (Audit Plan for Braidwood and Byron Licensee Action Taken to Resolve Turbine Building High Energy Line Break Non-Conformance)
- ML23121A068 + (Audit Plan for CFPP Ltrs: on Shift and Emergency Response Organization Staffing, Emergency Actions Levels)
- ML101120105 + (Audit Plan for Diablo Canyon Nuclear Power Plant, License Renewal Application)
- ML20281A210 + (Audit Plan for Errata to Framatome TR ANP-10297 Rev. 0 - Supplement 1P-A - Rev. 0)
- ML20211L744 + (Audit Plan for Errata to Framatome Topical Report BAW-10241PA, Revision 1, Bhtp DNB Correlation Applied Lynxt Topical Report Project No. 728)
- ML20281A220 + (Audit Plan for Errata to Framatome Topocal Report (TR) ANP-10297, Rev 0 Supplement 1PA, Rev 0)
- ML19031C845 + (Audit Plan for Exelon Generation Company, Llc. License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies at Braidwood Station, Units 1 and 2 - Renewed Facility Operating License Nos. NPF-72 and NPF-77)
- ML20338A146 + (Audit Plan for Framatome Topical Report ANP-10339P, Revision 0, Arita - Artemis/Relap Integrated Transient Analysis Methodology)
- ML21005A264 + (Audit Plan for Framatome Topical Report ANP-10348P Fluence Methods)
- ML18158A125 + (Audit Plan for General Electric-Hitachi Nuclear Energy NEDC-33173P Supplements 5 - Applicability of GE Methods to Expanded Operating Domains - Supplement for GNF3 Fuel)
- ML18261A205 + (Audit Plan for Global Nuclear Fuel - Americas, LLC Licensing Topical Report NEDE-33885P, Revision 0, Global Nuclear Fuel Control Rod Drop Accident Application Methodology (EPID L-2018-TOP-0006)(Non-Proprietary))
- ML22143B016 + (Audit Plan for Hermes Site Characteristics PSAR Chapter 2)
- ML18355A977 + (Audit Plan for January 30-31, 2019, Audit Supporting Review of Framatome Inc. Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel)
- ML24269A202 + (Audit Plan for Kairos Kp SAM TR Review)
- ML20111A171 + (Audit Plan for Kairos Power, LLC High Temperature Materials Qualification Topical Report)
- ML18192B091 + (Audit Plan for LAR 17-031, Effect of Rod Shadowing on Excore Power Range Detectors, Changes to Nuclear Overpower Reactor Trips, and Changes to Monitoring of Moderator Temperature Coefficient and Core Power Distribution)
- ML18256A323 + (Audit Plan for LAR 18-019, Crediting Previously Completed First Plant and First Three Plant Tests)
- ML20014D839 + (Audit Plan for LAR 19-019)
- ML20063H206 + (Audit Plan for LAR 20-001 Auxiliary Building Wall 11 Seismic Gap Requirements)
- ML24227A052 + (Audit Plan for LAR to Remove ATWS Mtc Limit)
- ML25016A345 + (Audit Plan for License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code)
- ML17319A227 + (Audit Plan for License Amendment Request to Resolve Non-Conformances Relating to Containment Dome Truss)
- ML050110445 + (Audit Plan for License Renewal Application Aging Management Programs Aging Management Review Results - Brunswick Steam Electric Plant, Units 1 and 2, Revision 6, Dated December 23, 2004)
- ML17177A446 + (Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force)
- ML21347A883 + (Audit Plan for Loss of Power Diesel Generator Start and Bus Separation)
- ML25073A190 + (Audit Plan for MRP-480 (EPRI TR 3002023895))
- ML14295A085 + (Audit Plan for Millstone Unit 2 Regarding Individual Plant Examination of External Events Supporting Information for Seismic Screening)
- ML18074A079 + (Audit Plan for NuScale Computer Codes Section 3.9.1 March - April 2018)
- ML21327A209 + (Audit Plan for NuScale EPZ Topical Report)
- ML17356A120 + (Audit Plan for Nuscale Power, LLC, Final Safety Aanalysis Report - Chapter 20, Mitigation of Beyond Design-Basis Events)
- ML18324A551 + (Audit Plan for Regulatory Audit of Nuscale Design Certification Application, Final Safety Analysis Report, Tier 2, Section 3.7 Seismic Design and Section 3.8 Design of Category I Structures)
- ML18229A114 + (Audit Plan for Regulatory Audit of Nuscale Power, LLC Design Documents for Containment Isolation Valves and Reactor Safety Valves)
- ML20128J311 + (Audit Plan for Relief Request VEGP-ISI-ALT-04-04)
- ML18180A418 + (Audit Plan for Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components Forr Nuclear Power Reactors (EPID L-2018-LLA-0008; L-2018-LLA-0034))
- ML090400542 + (Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station)
- ML14300A104 + (Audit Plan for Review of Degraded Voltage Protection Scheme)
- ML092580158 + (Audit Plan for Review of the Addendum 3-Dimensional Finite Element Analysis for the Oyster Creek Nuclear Generating Station Containment Drywell Shell)
- ML12115A205 + (Audit Plan for Reviewing the US-APWR Turbine Driven Emergency Feed Water Pump Room Transient Heat-Up Calculations)
- ML25213A121 + (Audit Plan for Revised Melco Meltac Aspm and CGD)
- ML20342A018 + (Audit Plan for Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions)
- ML18051A317 + (Audit Plan for Second Audit Concerning Systematic Risk-Informed Assessment of Debris Technical Report (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038))
- ML24295A372 + (Audit Plan for St. Lucie, Unit 2 - Criticality Analysis for Transition to 24-Month Fuel Cycle)
- ML24331A209 + (Audit Plan for St. Lucie, Unit 2 - Criticality Analysis for Transition to 24-Month Fuel Cycle)