Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Amend 33 to Advanced BWR SSAR". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17278B083  + (Amend 32 to License NPF-21,changing Tech Specs 3/4.3.7.12 & 3/4.11.2.7 to Clarify Operating Conditions Requiring Radioactive Effluent Monitoring)
  • ML20205R750  + (Amend 32 to License NPF-29,changing Tech Specs & Associated Bases for Reactor Pressure Vessel Pressure & Temp Limits to Be Consistent W/Limits Provided by GE for NSSS)
  • ML19347C167  + (Amend 32 to License NPF-3,adding Requirement to Maintain Safeguards Contingency Plan to Be Fully Implemented within 30 Days)
  • ML20149G166  + (Amend 32 to License NPF-30,revising Tech Spec Figures 6.2-1 & 6.2-2 & Section 6.5.1 to Reflect Nuclear Function Organizational Changes Associated W/Establishment of Positions of Manager,Licensing & Fuels & Work Control)
  • ML20248D785  + (Amend 32 to License NPF-39,revising Tech Spec Sections 3.8.1.1 & 3.8.1.2 & Bases Re Onsite Emergency Diesel Generators)
  • ML17303B113  + (Amend 32 to License NPF-41,incorporating Commitments Currently in Effect for Monitoring Reactor Coolant Pump Shaft Vibration as Condition to License)
  • ML20246E281  + (Amend 32 to License NPF-42,revising Tech Specs 3.1.3.4 & Figure 3.1-1 to Change Fully Withdrawn Position of Rod Cluster Control Assemblies to Range of 222 to 231 Steps, Inclusive)
  • ML20246L743  + (Amend 32 to License NPF-43,revising Tech Spec Section 3/4.6.4.1,to Change Required Action Statement When One of Two Redundant Vacuum Breaker Position Indicators Inoperable)
  • ML20076K633  + (Amend 32 to License NPF-5,changing Tech Spec Tables 3.3.2-1 & 3.3.2-2 to Permit Bypassing of Reactor Vessel Water Level - Low Trip Setpoint for Isolation of Shutdown Cooling Sys During Feedwater Sparger Bracket Repair)
  • ML20006D570  + (Amend 32 to License NPF-51,changing Tech Spec 4.1.3.12 Re Movable Control Assemblies)
  • ML20149J636  + (Amend 32 to License NPF-52,revising License Condition 2.C.(8)(b) to Allow Extension of Time for Resolution of SPDS Issue)
  • ML20246K323  + (Amend 32 to License NPF-57,increasing Hydrostatic Test Pressure for Containment Isolation Valves Provided W/Water Seal from Suppression Pool & Defining as-left Penetration Leakage for Valves)
  • ML20055G508  + (Amend 32 to License NPF-58,revising Alarm Setpoint for Control Rod Scram Accumulator)
  • ML20053E458  + (Amend 32 to License NPF-6,revising Power Distribution Limits Re DNBR Margin)
  • ML18010A762  + (Amend 32 to License NPF-63,revising TS 4.2.3.5 to Change Allowable Time Period for Calibr of Instrumentation Utilized in Performance of Reactor Coolant Sys Calorimetric Flow Measurement Flow from 7 to 21 Days)
  • ML20078P386  + (Amend 32 to License NPF-7,revising Average RCS Temp from 580.3 F to 582.8 F at Currently Licensed Thermal Power Level of 2,775 Mwt)
  • ML20024J203  + (Amend 32 to License NPF-86,revising App a Re Operability Requirements for Primary Component Cooling Water Sys & Ultimate Heat Sink)
  • ML20248L493  + (Amend 32 to License R-2,clarifying Requirements Consistent to 10CFR20 & Sar,As Well as W/Facility Physical Installation,Experimental Facility Limitations,Surveillance Requirements & Organizational Structure)
  • ML20236U196  + (Amend 32 to License R-28,reflecting Revised Physical Security Plan That Shows New Measures Used to Protect SNM of Low Strategic Significance Resulting from Conversion to Low Enriched U Reactor Fuel)
  • ML20057B943  + (Amend 32 to License SNM-1097,authorizing Administrative Changes)
  • ML20199F938  + (Amend 32 to License SNM-1168,revising License Condition SG-1.1,by Incorporating Revised Fundamental Nuclear Matl Control Plan)
  • ML20040B589  + (Amend 32 to Matls Byproduct License 24-17152-01 for Envirodyne Engineers Authorizing Use of Ni-63 Foil Source in Gas Chromatographs for Sample Analysis)
  • ML19329D583  + (Amend 32 to OL Application Revising FSAR & Suppl 1 in Response to NRC 721215,730427 & 0711 Requests for Addl Info)
  • ML19329A850  + (Amend 32 to OL Application,Consisting of Revision 16 to FSAR Re Text Changes Resulting from 750923 & 24 Meetings W/Nrc)
  • ML19345E291  + (Amend 33 to 560629 Application for CP & Ol,Updating Technical Info Re Undervoltage Protection Addition to 2,400 Volt Circuits Supplying Main Coolant Pumps)
  • ML19344A097  + (Amend 33 to Application for CP & Ol,Extending Unit 1 Completion Dates to 811001 & 821001 & Unit 2 Dates to 801001 & 811001.Statement of Good Cause Encl)
  • ML20052G664  + (Amend 33 to Application for OL Consisting of Revision 5 to FSAR)
  • ML20092L272  + (Amend 33 to Application for Ol,Consisting of Rev 11 to FSAR)
  • ML19320A285  + (Amend 33 to Application for Ol.Amends FSAR in Response to Questions in AEC)
  • ML19347F313  + (Amend 33 to Application for Ol.Contains Revision 4 to Emergency Plan)
  • ML20031G945  + (Amend 33 to Applications for CPs & Ols,Consisting of Amend 33 to FSAR)
  • ML19210B074  + (Amend 33 to DPR-50,increasing from 48-h to 72-h Inoperable Period for One of Group of Redundant Components in ECCS, Reactor Bldg Emergency Cooling Sys or Spray Sys)
  • ML17250A377  + (Amend 33 to License DPR-18,approving Secondary Water Chemistry Monitoring Program Implementation.Effective on 800630)
  • ML17251A420  + (Amend 33 to License DPR-18,revising Tech Specs to Reflect Mods for RHR Pump & Safety Injection Pump Sys,Including Revs to Boric Acid Storage Tank Specs)
  • ML20205E000  + (Amend 33 to License DPR-22,revising Tech Spec Section 3.13/4-13, Fire Suppression Water Sys, to Change Term, Screen Wash Pump to Screen Wash/Fire Pump)
  • ML19316A226  + (Amend 33 to License DPR-38 Incorporating Tech Spec Changes)
  • ML19316A228  + (Amend 33 to License DPR-47 Incorporating Tech Spec Changes)
  • ML19326B946  + (Amend 33 to License DPR-51 Changing Tech Specs to Increase Vol Requirements & Modify Concentration Requirements of Boric Addition Tank)
  • ML20003J079  + (Amend 33 to License DPR-54,changing Operating Limits for Cycle 5 Operation & Approving Insertion of Four Axial Blanket Lead Test Assemblies Into Core)
  • ML19308A894  + (Amend 33 to License DPR-55 Incorporating Tech Spec Changes)
  • ML19331E103  + (Amend 33 to License DPR-6,changing Surveillance Requirements for Verifying Operability of Power Operated Valves in Containment Spray Sys)
  • ML19305E714  + (Amend 33 to License DPR-61,revising Tech Specs to Establish Requirements Re Prevention of Low Temp Overpressurization Events)
  • ML17053A948  + (Amend 33 to License DPR-63,adding License Conditions Re Completion of Facility Mods for Fire Protection)
  • ML19332B345  + (Amend 33 to License DPR-64,requiring Safeguards Contingency Plan Be Fully Implemented within 30 Days of Commission Approval)
  • ML20062J564  + (Amend 33 to License DPR-66,revising Radiological Tech Specs Re Response Time Required for Isolation of Control Room Ventilation Sys & for Isolation of Certain Containment Penetrations)
  • ML17207A362  + (Amend 33 to License DPR-67 Authorizing Mods & Evaluations Identified in NRC 790817 Fire Protection Safety Evaluation. Administrative Controls to Be Implemented within 90 Days)
  • ML19341B731  + (Amend 33 to License DPR-70,authorizing Mod of Spent Fuel Pool to Provide Addl Capacity of Fuel Assemblies & Revising Radiological Tech Specs to Reflect Mod)
  • ML19337A971  + (Amend 33 to License DPR-72,revising Tech Spec Requirements for Insp of Steam Generator Tubes in Areas Distinguished by Unique Operating Conditions or Physical Const)
  • ML20245A651  + (Amend 33 to License DPR-73,modifying App B Tech Specs by Revising Certain Surveillance Terms & Definitions Consistent W/Meaning & Usage in App a Tech Specs)
  • ML20099M159  + (Amend 33 to License NPF-12,modifying Tech Specs to Add Addl Containment Penetration Conductor Protection Device to Table 3.8.1)