Text
~p,8 RECy~~
~p Cy 4 pO C
I/I P r Op n
~O
>>>>*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 CAROLINA POWER 8
LIGHT COMPANY et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
32 License No.
NPF-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power 8 Light Company, (the licensee),
dated December 16,
- 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.
NPF-63 is hereby amended to read.as follows:
92091 OCR, 0>0000 0
60089 920'POS
3.
(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No. 32, are hereby incorporated into this license.
Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 8,
1992 Elinor G. Adensam, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO.
FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised areas are indicated by marginal lines.
Remove Pa e
3/4 2-10 Insert Pa e
3/4 2-10
b.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiallybeing outside the above limits, verify through incore flux mapping and RCS total flow rate determination that F~ and RCS total flow rate are restored to within the above limits, or reduce THERMAL POWER to less than 5% of RATED TfKRMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
c
~
Identify and correct the cause of the out-of-limit condition prior to increasing TfKRMAL POWER above the reduced THERMAL POWER limit required by ACTION a.2. and/or b., above; subsequent POWER OPERATION may proceed provided that F~ and indicated RCS total flow rate are demonstrated, through incore flux mapping and RCS total flow rate determination, to be within acceptable limits prior to exceeding the following THERMAL POWER levels:
l.
2.
3.
A nominal 50% of RATED TfKRMAL POWER, A nominal 75% of RATED THERMAL POWER, and Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of attaining greater than or equal to 95% of RATED THERMAL POWER.
4.2.3.1 The provisions of Specification 4.0.4 are not applicable.
4.2.3.2 F~ shall be determined to be within acceptable limits:
a.
Prior to operation above 75% of RATED TiKRMAL POWER after each fuel
- loading, and b.
4.2.3.3 limit:
At least once per 31 Effective Full Power Days.
The RCS total flow rate shall be verified to be within the acceptable a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by the use of main control board instru-mentation or equivalent, and b.
At least once per 31 days by the use of process computer readings or digital voltmeter measurement.
4.2.3.4 The RCS total-.flow rate indicators shall be subjected to a QSHNEL CALIBRATION at least once per 18 months.
4.2.3.5
'The RCS total flow rate shall be determined by precision heat balance measurement at least once per 18 months.
The measurement instrumentation shall be calibrated within 21 days prior to the performance of the calorimetric flow measurement.
SHEARON HARRIS - 'UNIT 1 3/4 2-10 haexx~nt No.
gg, 32