ML20149J636

From kanterella
Jump to navigation Jump to search
Amend 32 to License NPF-52,revising License Condition 2.C.(8)(b) to Allow Extension of Time for Resolution of SPDS Issue
ML20149J636
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/16/1988
From: Jabbour K
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20149J639 List:
References
NUDOCS 8802230153
Download: ML20149J636 (2)


Text

'.,

.a on 8

3c UNITED STATES g

NUCLEAR REGULATORY COMMISSION 1

3 o

5 E

WASHINGTON, D. C. 20666

\\....}

\\

DUKE POWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET N0. 50-414 CATAWBA NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Anendment No. 32 License No. NPF-52 1.

The Nuclear Regulatory Comission (the Comission) has found that:

j A.

The apolication for amendment to the Catawba Nuclear Station, Unit 2 i

(the facility) Facility Operating license No. NPF-52 filed by the Duke Power Company acting for itself, North Carolina Municipal Power Agency No. I and Piedmont Municipal Power Agency. (licensees) dated i

December 4,1987, comolies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's i

rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in confonnity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all apolicable requirements have been satisfied.

2.

Accordingly, Facility Operating License No. NPF-52 is hereby changed to read as follows:

A.

Change paragraph 2.C.(8)(b) to read as follows:

g2230153890216 p

ADOCK 05000414 PDR

Safety Parameter Display System (SPDS) (Section 18, SSER #S)

Prior to startup following the second refueling outage, Duke i

Power Company shall add to the existing SPDS and have operational the following SPDS parameters: (a) residual heat removal flow.

(b) containment isolation status. (c) stack radiation measurements,.

and (d) steam generator or steamline radiation.

The actual value of these and all other.SPDS variables should be displayed for operator viewing in easily and rapidly accessible display formats.

3.

This license-amendment is effective as of its date of issuance.

l FOR THE NUCLEAR REGULATORY C0iHISSION f

Kahtan N.

Jabbour

, Acting Director Project Directorate 11-3 3

Division of Reactor Projects I/II l

i Date of Issuance:

February 16, 1988 I

W hb Ppl -

PDII-3/DRPI/E i

/

B OGC-Bethesda MRdo{.1/DRPI/II 4

B/mac KJabbour WRegan (drcWome/

i 01//(]/88 01/A//88 01/#9/88 01//

PDII /URPI/II AD/DPl!

Acting PD GLg' as i

OM p /88 07// /88 t.lvlUK18 Achf 4

. _, _ _.. - - - - _ - - - -..