Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML003723265 + (Alternate BWR Feedwater Nozzle Inspection Requirements, GE-NE-523 -A7 1 -0594-A, Revision 1, May 2000)
- ML20261C783 + (Alternate Charging Unit 2)
- 05000296/FIN-2016003-05 + (Alternate Depressurization Valve Inoperable Longer than the Allowed Outage Time)
- ML19198A252 + (Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271))
- ML19198A251 + (Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271))
- ML19198A250 + (Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271))
- ML20101F600 + (Alternate Disposition Strategy for Low Vol OTSG Eddy Current Indications)
- ML20262J994 + (Alternate Emergency Operations Facility Floor Plan (Brownville Fire Hall))
- ENS 43178 + (Alternate Eof Unavailable)
- ML18253A074 + (Alternate Method for Meeting ANSI Experience Requirements for Supplemental Radiation Protection Technicians - September 5 2018)
- 05000282/FIN-2011003-09 + (Alternate Methods Were Not Developed for Monitoring Inaccessible Susceptible Locations)
- ML20058F938 + (Alternate Modal Combination Methods in Response Spectrum Analysis)
- 05000387/LER-1983-139-01, Alternate Power Supply Breaker Removed & Bus 1A203 Did Not Have Two Independent Offsite Sources of Power.Caused by Personnel Error.Proper Interpretation of Tech Specs Provided + (Alternate Power Supply Breaker Removed & Bus 1A203 Did Not Have Two Independent Offsite Sources of Power.Caused by Personnel Error.Proper Interpretation of Tech Specs Provided)
- ML19221A572 + (Alternate Pressurizer Level Methods)
- ML20107L614 + (Alternate Procedures for the Seismic Analysis of Multiply Supported Piping Systems)
- ML20217Q421 + (Alternate Repair Criteria 90 Day Rept)
- ML050120353 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML040100006 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML030580698 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML030300258 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML022180380 + (Alternate Requalification Program for Senior Reactor Operator Detailed to the Institute of Nuclear Power Operations)
- ML020150597 + (Alternate Requalification Program for Senior Reactor Operator Detailed to the Institute of Nuclear Power Operations)
- ML020420510 + (Alternate Requalification Program for Senior Reactor Operator Detailed to Indian Point 2)
- ML20198M682 + (Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles)
- EPID:L-2021-LLR-0092 + (Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles)
- ML20215E561 + (Alternate Rod Injection Risk Evaluation)
- ML20265A978 + (Alternate Rod Insertion Control Rod Drive System)
- ML17199X956 + (Alternate Rod Insertion Scram Discharge Vol Fill Analysis)
- PMNS20230212, Alternate Rules for Non-Destructive Examination and Testing of ASME Section III Nuclear Items + (Alternate Rules for Non-Destructive Examination and Testing of ASME Section III Nuclear Items)
- ML20266C182 + (Alternate SRV N2 Supply System.Sheet 2 of 3)
- 05000443/FIN-2014007-01 + (Alternate Safe Shutdown Areas Affected by Smoke from Cable Spreading Room Fire)
- ML19275G743 + (Alternate Safe Shutdown Capability in Event of Fire in Cable Spreading Room)
- ENS 44425 + (Alternate Safe Shutdown Local Start Capability of All Four Emergency Diesel Generators May Not Be Available Under Certain Conditions)
- ML121810188 + (Alternate Seal Injection Pump Picture - NFPA 805)
- ML20196C544 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station Vol 1 Criteria & Methodologies)
- ML20196C571 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station Vol 2 Justifications of Criteria & Methodologies)
- ML20099E007 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station)
- ML19253C250 + (Alternate Shutdown Capability:Cold Shutdown Phase)
- ML20262A937 + (Alternate Shutdown Panel AI-185-Relay Schematics)
- 05000285/FIN-2012007-03 + (Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations)
- 05000341/FIN-2008006-05 + (Alternate Shutdown Procedure Failed to Identify TIME-CRITICAL Steps)
- 05000373/FIN-2016007-04 + (Alternate Shutdown Procedures Failed to Ensure RCIC MOVs Supply Breakers Were Closed)
- ML20052E941 + (Alternate Shutdown Study, Final Rept Apr 1982)
- ML20083D870 + (Alternate Shutdown Sys for Monticello Nuclear Generating Plant,Northern States Power Co)
- ML25029A245 + (Alternate Shutdown Systems - Regulating Engagement 4th Meeting)
- ML20155F154 + (Alternate Site Selection Process for Umtrap Sites)
- ML032340602 + (Alternate Source Term - State of Vermont Questions Re Entergy Nuclear Vermont Yankees Request of 07/31/2003, to Modify Design Bases)
- NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 + (Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3)
- ML14086A387 + (Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3)
- ML20202E899 + (Alternate Source Term Models for Yucca Mountain Performance Assessment Based on Natl Analog Data Secondary Mineral Solubility)
- ML15029A094 + (Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation)