Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12227A590 + (9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni)
- ML12270A055 + (9/6/2012 Summary of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un)
- ML13269A025 + (9/6/2013, E-Mail from J. Nguyen to Mr. Janiti Draft Peach Bottom EA for Your Review)
- ML17268A364 + (9/7/2017 Letter from Wyoming Governor to NRC Chairman SECY-17-0081)
- ML22250A689 + (9/7/2022 Letter to S. Jenkins and S. French South Carolina FY2022 Integrated Materials Performance Evaluation Program (Impep) Scheduling and Questionnaire Letter)
- ML082680110 + (9/8/08 - Point Beach Nuclear Plant, Units 1 and 2, Summary of the September 8, 2008, Meeting with FPL Energy Point Beach, LLC, on Their Proposed Extended Power Uprate Application (Tac No. MD9526 and MD9527))
- PMNS20210944, 9/8/2021 Notice of Pre-Application Meeting for the Model No. TN-40-HT Package + (9/8/2021 Notice of Pre-Application Meeting for the Model No. TN-40-HT Package)
- ML22250A425 + (9/8/2022 ACRS Sc Meeting for NuScale EPZ TR)
- ML050470363 + (9/9/03 Turkey Point Condition Report 03-1330-1)
- ML052560651 + (9/9/05 - Summary of Meeting Held on July 22, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Firstenergy Nuclear Operating Company Regarding the Beaver Valley Power Station, Units 1 and 2 License Renewal Application)
- 3F0206-09, 90 Day Inservice Inspection (ISI) Summary Report + (90 Day Inservice Inspection (ISI) Summary Report)
- 3F0102-04, 90 Day Inservice Inspection (ISI) Summary Report + (90 Day Inservice Inspection (ISI) Summary Report)
- W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML12158A531 + (90 Day Response to March 12, 2012 Information Request Regarding Recommendation 9.3 of the Near Term Task Force Report)
- ML12171A017 + (90 Day Response to March 12, 2012 Information Request Regarding Recommendation 9.3 for Emergency Preparedness)
- ML12171A013 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A011 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A009 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A007 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A010 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- ML12171A008 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- ML12171A006 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- PLA-6919, 90 Day Response to NRC Bulletin 2012-01 + (90 Day Response to NRC Bulletin 2012-01)
- ET 07-0007, 90 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients + (90 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients)
- ML050750069 + (90 Day Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water)
- RBG-46429, 90-Day Advance Notification of ISFSI Operations + (90-Day Advance Notification of ISFSI Operations)
- ML021440050 + (90-Day Extension of the Third Inspection Interval (Tac No. MB2942))
- HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)
- HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)
- HNP-07-179, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)
- 3F0204-04, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)
- BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) + (90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18))
- ML16105A179 + (90-Day Notification Prior to First Storage of Spent Fuel)
- BYRON 2009-0011, 90-Day Notification Prior to First Storage of Spent Fuel + (90-Day Notification Prior to First Storage of Spent Fuel)
- TMI-21-024, 90-Day Notification Prior to First Storage of Spent Fuel + (90-Day Notification Prior to First Storage of Spent Fuel)
- ULNRC-06163, 90-Day Notification Pursuant to 10 CFR 72.212(B)(1) of Intent to Load Spent Fuel Under a General License + (90-Day Notification Pursuant to 10 CFR 72.212(B)(1) of Intent to Load Spent Fuel Under a General License)
- RC-14-0181, 90-Day Notification Pursuant to 10 CFR 72.212(b)(1) of Intent to Load Spent Fuel Under a General License + (90-Day Notification Pursuant to 10 CFR 72.212(b)(1) of Intent to Load Spent Fuel Under a General License)
- SVP-08-033, 90-Day Post Outage ISI Letter + (90-Day Post Outage ISI Letter)
- SVP-07-027, 90-Day Post Outage ISI Letter, Dated July 14, 2006 + (90-Day Post Outage ISI Letter, Dated July 14, 2006)
- U-603857, 90-Day Post-Outage Inservice Inspection (ISI) Summary Report + (90-Day Post-Outage Inservice Inspection (ISI) Summary Report)
- U-603774, 90-Day Post-Outage Inservice Inspection (SI) Summary Report + (90-Day Post-Outage Inservice Inspection (SI) Summary Report)
- BVY 12-074, 90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System + (90-Day Response to Bulletin 2012-01, Design Vulnerability in Electric Power System)
- RC-12-0082, 90-Day Response to Emergency Preparedness Information Request by NRC for Information Pursuant to 10CFR50.54(f) Recommendations 2.1, 2.3 and 9.3 of Near Term Task Force Review of Insights from Fukushima Dai-ichi Accident + (90-Day Response to Emergency Preparedness Information Request by NRC for Information Pursuant to 10CFR50.54(f) Recommendations 2.1, 2.3 and 9.3 of Near Term Task Force Review of Insights from Fukushima Dai-ichi Accident)
- ML12171A202 + (90-Day Response to Emergency Preparedness Information Requested by NRC Letter, for Information Pursuant to Title 10 of Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of Near-Term Task)
- ML12171A201 + (90-Day Response to Flooding Information Requested by NRC Letter, Request for Information Pursuant to 10CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3, of Near-Term Task Force Review of Insights from Fukushima Dai-ichi)
- NOC-AE-05001862, 90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML050770105 + (90-Day Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- SBK-L-12109, 90-Day Response to March 12, 2012 10 CFR 50.54(f) Request for Information Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (90-Day Response to March 12, 2012 10 CFR 50.54(f) Request for Information Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- SBK-L-12110, 90-Day Response to March 12, 2012 10CFR50.54(f) Request for Information the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (90-Day Response to March 12, 2012 10CFR50.54(f) Request for Information the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- JAFP-12-0065, 90-Day Response to March 12, 2012 Information Request on Action Plan for Completing Emergency Communication and Staffing Assessments + (90-Day Response to March 12, 2012 Information Request on Action Plan for Completing Emergency Communication and Staffing Assessments)
- HNP-03-118, 90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity + (90-Day Response to NRC Bulletin 2003-02 for Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity)