90-Day Response to Flooding Information Requested by NRC Letter, Request for Information Pursuant to 10CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3, of Near-Term Task Force Review of Insights from Fukushima Dai-ichi
ML12171A201
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/08/2012
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06530-DCM/MAM/TLC
Download: ML12171A201 (5)


Text

10 CFR 50.54(f) 16AL A

subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel: 623-393-5403 P.O. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax: 623-393-6077 Phoenix, Arizona 85072-2034 102-06530-DCM/MAM/TLC June 8, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(o Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012
2. NRC Letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31, 2012

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 90-Day Response to Flooding Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(t) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff issued a 10 CFR 50.54(f) letter to Arizona Public Service (APS) (Reference 1). Enclosure 4 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Flooding Walkdowns. This letter provides the APS 90 day response to Reference 1 for PVNGS.

For flooding recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that each licensee is to confirm that it will use the NRC-endorsed flooding walkdown procedure or provide a description of the process it will use.

A ND A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

102-06530-DCMIMAMITLC AJune 8, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 90 Day Response to 10 CFR 50.54(f) Letter Regarding Flooding Recommendation 2.3 Page 2 APS confirms that it will use the flooding walkdown procedure, NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features, endorsed by Reference 2, as the basis for the flooding walkdowns at PVNGS.

APS plans to comply with the response timeline in Enclosure 4 of Reference 1.

Specifically, APS will submit a report documenting the results of its flooding design basis walkdowns at PVNGS on November 27, 2012, which corresponds to 180 days after NRC endorsement of the generic guidance.

No commitments are being made to the NRC by this letter.

Should you have any questions concerning the content of this letter, please contact Mark McGhee, Operations Support Manager, Regulatory Affairs, at (623) 393-4972.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on t.1,h)41?

7

/ (Date)

Sincerely, DCM/MAM/TLC/hsc cc:

E. J. Leeds, E. E. Collins Jr.

B. K. Singal L. K. Gibson J. R. Hall M. A. Brown NRC Director, Office of Nuclear Reactor Regulation NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC NRR Senior Project Manager NRC Senior Resident Inspector for PVNGS