Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49641 + (60 Optional Report - Invalid Partial Reactor Protection System Actuation)
- ML20259C218 + (60 Watt (E) Assembly Snap 23A Fpms. Sheet 1 of 1)
- ENS 57506 + (60-DAY Notification of Invalid Actuation of Emergency Diesel Generator)
- ENS 57313 + (60-DAY Notification of Invalid Specified System Actuation)
- ENS 57324 + (60-DAY Notification of Invalid Specified System Actuation)
- ENS 57336 + (60-DAY Notification of Invalid Specified System Actuation)
- ENS 57491 + (60-DAY Notification of Invalid Specified System Actuation)
- ENS 57793 + (60-DAY Notification of Invalid Specified System Actuation)
- ENS 56202 + (60-DAY Optional Telephonic Notification of Invalid Engineered Safety Feature Actuation Signal)
- ENS 55079 + (60-DAY Optional Telephonic Notification of an Invalid Specified System Actuation)
- ENS 58068 + (60-DAY Optional Telephonic Notification of Invalid Specified System Actuation)
- ENS 56138 + (60-DAY Optional Telephonic Notification of Invalid Actuation of Containment Isolation Valves)
- ENS 57387 + (60-DAY Optional Telephonic Notification of Invalid Actuation of Containment Isolation Valves)
- ENS 56274 + (60-DAY Optional Telephonic Notification of Invalid Actuation of Containment Ventilation Isolation Valves)
- ENS 57302 + (60-DAY Optional Telephonic Notification of Invalid Residual Heat Removal Activation)
- ENS 56625 + (60-DAY Optional Telephonic Notification for an Invalid Actuation of an Emergency AC Electrical Power System)
- ENS 56345 + (60-DAY Optional Telephonic Notification of Invalid Actuation of Auxiliary Feedwater Pump)
- ENS 57850 + (60-DAY Optional Telephonic Notification for Invalid Containment Isolation)
- ENS 56347 + (60-DAY Optional Telephonic Notification of Invalid Actuation of Emergency Diesel Generator (EDG))
- ENS 57691 + (60-DAY Optional Telephonic Notification for an Invalid Containment Isolation)
- ENS 55602 + (60-DAY Optional Telephonic Notification for an Invalid Emergency Diesel Generator Actuation)
- ENS 57488 + (60-DAY Optional Telephonic Notification for an Invalid Emergency Diesel Generator Actuation)
- ENS 56779 + (60-DAY Optional Telephonic Notification for an Invalid Specified System Actuation)
- ENS 55756 + (60-DAY Optional Telephonic Notification for Invalid Actuation of Containment Isolation Valves)
- ENS 58075 + (60-DAY Report of Invalid Actuation of Containment Isolation Valves)
- ENS 56280 + (60-DAY Telephonic Notification)
- ENS 56283 + (60-DAY Telephonic Notification - Invalid Specific System Actuation)
- ENS 41214 + (60-Day Report Due to an Invalid Actuation of Eccs and Edgs During Surveillance Activities)
- ML040550543 + (60-Day After Plant Restart Letter in Response to NRC Bulleting 2003-02, Commitment No. 3 and Order EA-03-009, Item Iv.E)
- ML082250351 + (60-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E and Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U2R14)
- ML070430247 + (60-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E - U2R13)
- ML21343A354 + (60-Day FRN for 10 CFR Part 51 Information Collection Renewal)
- ML24032A094 + (60-Day FRN for Customer Satisfaction Fast Track)
- ML21074A318 + (60-Day FRN for Renewal of Requests to Agreement States and Non-Agreement States (OMB 3150-0029))
- ML20064E973 + (60-Day Federal Register Notice for NRC Form 446, Request for Approval of Official Foreign Travel by Non-Government Personnel)
- RC-04-0022, 60-Day Follow-Up Letter to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity + (60-Day Follow-Up Letter to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity)
- ML040270204 + (60-Day Follow-Up Letter to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity)
- PLA-6608, 60-Day Follow-up Report for Event Reported in Accordance with 10CFR73.71, PLA-6608 + (60-Day Follow-up Report for Event Reported in Accordance with 10CFR73.71, PLA-6608)
- ENS 48585 + (60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers)
- ML13165A342 + (60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers)
- ML12352A123 + (60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers)
- ML040280478 + (60-Day Letter in Response to NRC Bulletin 2003-02, Commitment No. 2)
- ML12152A236 + (60-Day Licensee Responses Requesting Additional Time for NTTF Recommendation 9.3)
- ENS 40806 + (60-Day Notification of Invalid Actuation of Safety Injection Signal)
- ENS 43910 + (60-Day Notification of an Invalid Actuation of Units 2 and 3 Primary Containment Isolation Systems)
- ENS 55032 + (60-Day Option Telephonic Notification of an Invalid Specified System Actuation)
- ENS 50909 + (60-Day Optional Notification - Invalid Containment Isolation Signal)
- ENS 44260 + (60-Day Optional Notification for Invalid Specified System Actuation)
- ENS 46898 + (60-Day Optional Notification of Invalid Start of the 'A' Emergency Diesel Generator)
- ENS 44278 + (60-Day Optional Notification of Invalid Specified System Actuation)