Title | 60-Day Option Telephonic Notification of an Invalid Specified System Actuation |
Event Description | On October 13, 2020, at approximately 02:25 [MST], an automatic start of the Unit 1 'A' Train EDG and SP systems occurred following the restoration of power to the 'A' Train 4160 Volt Class Bus. The station was conducting a surveillance test during a Unit 1 refueling outage to verify the proper responses of the EDG and the Engineered Safety Features Actuation Systems to simulated design basis events. During the test, technicians installed a jumper across incorrect relay points that caused the running Unit 1 'A' Train EDG to trip, resulting in a loss of power to the 'A' Train 4160 Volt Class Bus.
Following restoration of normal offsite power to the 'A' Train 4160 Volt Class Bus, the Loss of Power Actuation signal was reset, however, EDG start relay logic was not reset at the EDG Local Panel. This resulted in the Unit 1 'A' Train EDG and SP system actuations with the EDG running unloaded. The system actuations did not occur as a result of valid plant conditions or parameters and are therefore invalid. The Unit 1 'A' Train EDG and SP system actuations were complete and the systems started and functioned successfully. The event was attributed to a human performance error and entered into the corrective action program. There was no adverse impact to public health and safety nor to plant employees. The NRC Resident Inspectors have been informed. |
Where | |
---|---|
Palo Verde ![]() Arizona (NRC Region 4) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+10.63 h0.443 days <br />0.0633 weeks <br />0.0146 months <br />) | |
Opened: | George Lester 17:38 Dec 11, 2020 |
NRC Officer: | Kerby Scales |
Last Updated: | Dec 11, 2020 |
55032 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 55032\u003C/a\u003E - \u003Ca href=\"/Palo_Verde\" title=\"Palo Verde\"\u003EPalo Verde\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60-Day Option Telephonic Notification of an Invalid Specified System Actuation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 55032 - Palo Verde\n","link":"","lat":33.386894444444444,"lon":-112.86263333333333,"icon":"/w/images/9/93/Arizona_Public_Service_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 559262022-04-12T03:45:00012 April 2022 03:45:00
[Table view]10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation ENS 550322020-12-11T07:00:00011 December 2020 07:00:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Option Telephonic Notification of an Invalid Specified System Actuation ENS 547012020-03-14T19:44:00014 March 2020 19:44:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Spray Pond Pump System - 60 Day Reports ENS 524132016-10-17T22:19:00017 October 2016 22:19:00 10 CFR 50.73(a)(1), Submit an LER Invalid Engineered Safety Features Actuation System (Esfas) Signal ENS 522282016-07-12T12:50:00012 July 2016 12:50:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Both Trains Essential Spray Pond System ENS 498072013-12-12T03:11:00012 December 2013 03:11:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report for an Invalid Main Steam Line Actuation ENS 486152012-10-26T04:08:00026 October 2012 04:08:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Actuation of the Essential Spray Pond System ENS 468982011-04-03T21:44:0003 April 2011 21:44:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Notification of Invalid Start of the 'A' Emergency Diesel Generator ENS 427342006-06-06T01:44:0006 June 2006 01:44:00 10 CFR 50.73(a)(1), Submit an LER Invalid Emergency Diesel Generator Start ENS 418042005-04-29T07:43:00029 April 2005 07:43:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation 2022-04-12T03:45:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_55032&oldid=3085759"