ENS 57313
ENS Event | |
|---|---|
12:40 Aug 3, 2024 | |
| Title | 60-DAY Notification of Invalid Specified System Actuation |
| Event Description | The following information was provided by the licensee via phone and email:
This 60-day telephone notification is being submitted in accordance with 10 CFR 50.73(a)(1) and 50.73(a)(2)(iv)(A). The event was an invalid actuation of the Unit 1 containment ventilation isolation (CVI) system. On August 3, 2024, at 0840 EDT, with Unit 1 at 100 percent power, train 'A' of the CVI system actuated due to an invalid signal from 1-RM-90-130, containment purge air exhaust monitor. 1-RM-90-130 was out of service for maintenance testing at the time of the invalid signal. The cause of the signal was determined to be the result of an installed multimeter timing out, creating a short in the actuation circuitry. The train 'A' CVI signal was a full actuation of that train and the system functioned as designed. Prior to and following the CVI alarm, all other radiation monitors were stable at their normal values; therefore, the CVI [actuation] was invalid. Control room operators performed appropriate checks and confirmed that all required automatic actuations occurred as designed. Subsequent completion of the maintenance instruction was successful. This event was entered into the corrective action program as CR 1948103. The NRC Resident Inspector was notified. |
| Where | |
|---|---|
| Sequoyah Tennessee (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
| Time - Person (Reporting Time:+907.8 h37.825 days <br />5.404 weeks <br />1.244 months <br />) | |
| Opened: | Travis Holcomb 08:28 Sep 10, 2024 |
| NRC Officer: | Robert A. Thompson |
| Last Updated: | Sep 10, 2024 |
| 57313 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 573132024-08-03T12:40:0003 August 2024 12:40:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-DAY Notification of Invalid Specified System Actuation ENS 551302021-01-11T16:52:00011 January 2021 16:52:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for Invalid Containment Ventilation Isolation Actuation ENS 514512015-08-07T23:19:0007 August 2015 23:19:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephone Notification for an Invalid Containment Isolation Activation ENS 511172015-04-12T17:20:00012 April 2015 17:20:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Containment Isolation Activation. ENS 470222011-06-04T19:17:0004 June 2011 19:17:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation Caused All 4 Emergency Diesel Generators to Start ENS 472492011-05-05T19:20:0005 May 2011 19:20:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 465042010-11-14T10:09:00014 November 2010 10:09:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Turbine Driven Auxiliary Feedwater Pump ENS 450852009-04-09T05:15:0009 April 2009 05:15:00 10 CFR 50.73(a)(1), Submit an LER Optional 60-Day Telephone Report of an Invalid Start of All Four Emergency Diesel Generators 2024-08-03T12:40:00 | |