Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "1st Review Checklist". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing  + (1RE13 Inservice Inspection Summary Report for Steam Generator Tubing)
  • ML071140087  + (1RE13 Inservice Inspection Summary Report for Steam Generator Tubing)
  • NOC-AE-08002346, 1RE14 Inspection Summary Report for Steam Generator Tubing  + (1RE14 Inspection Summary Report for Steam Generator Tubing)
  • ML082820569  + (1RE14 Inspection Summary Report for Steam Generator Tubing)
  • NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing  + (1RE19 Inspection Summary Report for Steam Generator Tubing)
  • ML16125A248  + (1RE19 Inspection Summary Report for Steam Generator Tubing)
  • ML20006A757  + (1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1)
  • ML20199L700  + (1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1)
  • ML031910124  + (1RF012-EPRI Appendix H Eddy Current Technique Qualification)
  • ML20236T993  + (1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830)
  • ML24235A196  + (1RR06 Official RCI L-2024-LLR-0033)
  • ML20261B491  + (1ST FLOOR,2ND Floor and Enlarged Plans, as-built)
  • ML21238A021  + (1Summary of Closed Call to Discuss Revised Responses to Requests for Additional Information for the U.S. Nuclear Regulatory Commission Review of Holtec Decommissioning International Topical Report HI-2200750, Rev 0, Holtec Spent Fuel Pool)
  • ML21137A284  + (1_AN2-2021-03 Draft Outlines)
  • ML22214A599  + (1_CNS-2022-06 Draft Outlines)
  • ML20042C426  + (1_Email from Marcel Bergeron Information Request on Consistency Between Cpgwm and the Local-scale PA Model)
  • ML22354A249  + (1_RBS-2022-12 Outlines Draft)
  • ML23150A028  + (1a - Background)
  • ML23150A029  + (1b - Japanese Research)
  • ML13289A203  + (1e.iii.3.1, Sequoyah Nuclear Plant (SQN) TN5 64-002-0504-Required Actions from March 30, 2009 Division of Solid Waste Management Compliance Evaluation Inspection)
  • ML040840628  + (1pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Power Operating Co. to Discuss Licensee Performance and Planned Activities as Part of the IMC 0350 Process)
  • ML18204A185  + (1st Amended Complaint 10-11-2016 (2))
  • ML060590533  + (1st Quarter 2003 & 4th Quarter 2002 Survey Comments)
  • ML14209A935  + (1st Quarter 2014 Performance Review)
  • ML24018A242  + (1st Quarter FY2024 Email Update Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
  • ML25030A044  + (1st Quarter FY2025 Email Update Re Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
  • ML011580396  + (1st Review Checklist for Acceptance Review for Ssd 00-047)
  • ML011830019  + (1st Review Checklist for Ssd 01-033)
  • ML23018A153  + (1st Set of Request for Additional Information Regarding Framatome Topical Report, ANP-10350P, Revision 0, Framatome Methodology for Boiling Water Reactors: Evaluation and Validation of Apollo2-A/ARTEMIS-B (EPID L-2022-TOP-0038) - Letter)
  • ML21160A245  + (1st Town Hall Meeting - on Vendor Supplier Oversight - Regulatory Alternatives for Supplier Oversight During Exigent Conditions)
  • ML21160A241  + (1st Town Hall Meeting on Vendor Oversight - Design Control: Importance of Adherance to the Requirements in the Procurement Specifications)
  • PMNS20210419, 1st Town Hall Meeting on Vendor Oversight  + (1st Town Hall Meeting on Vendor Oversight)
  • ML19298C592  + (1to Updated Final Safety Analysis Report, List of Effective Pages)
  • ML18193A733  + (2)
  • ML21217A113  + (2 - 2021 Crpk MOU - Clean Version for Signatures)
  • ML25293A458  + (2 - Control of Heat Generation)
  • ML25260A530  + (2 - Enclosure 1 - 2023 License Renewal Safety Evaluation Report (Public))
  • ML24152A180  + (2 - Enclosure 1 - Special Nuclear Materials-362 License Renewal Safety Evaluation Report - Public)
  • ML26015A210  + (2 - Industry Performance Demonstration Activities)
  • ML25280A085  + (2 - Lmp Overview)
  • ML21167A127  + (2 - Lmp for Operating Reactors)
  • ML24067A007  + (2 - NRC - Workshop3 - Non-LOCA - FFRD - Final)
  • ML25016A259  + (2 - Performance Demonstration Update)
  • SBK-L-17051, 2 - Revision to Flow Accelerated Corrosion Program Operating Experience  + (2 - Revision to Flow Accelerated Corrosion Program Operating Experience)
  • ML15054A143  + (2 - Soarca Peach Bottom Unmitigated Stsbo with RCIC Blackstart Source Term)
  • ML19105A833  + (2 - Technical Evaluation Report: Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environmental Qualification Safety Evaluation Reports (F-11 and B-60))
  • ML20266H996  + (2 1/2 Ch Line Inside Reactor Cont Annulus)
  • ML20259D068  + (2 Aluminum Cone Roof Condensate Storage Tanks 30-OD & 42 Hg)
  • ML11325A003  + (2 Beaver Valley Power Station Unit 2 SER VRR4 Class 1 SRV Test Frequency)
  • ML24240A120  + (2 Certificate of Compliance 1014 A18 Final Appendix a)