Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 + ((Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25)
- W3F1-2015-0056, (Waterford 3) - Submittal of Reactor Vessel Material Surveillance Program Capsule Test Results + ((Waterford 3) - Submittal of Reactor Vessel Material Surveillance Program Capsule Test Results)
- W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update + ((Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update)
- W3F1-2018-0074, (Waterford 3) - Withdrawal of License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K313 + ((Waterford 3) - Withdrawal of License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K313)
- W3F1-2015-0070, (Waterford 3) Registration of Cask Use + ((Waterford 3) Registration of Cask Use)
- 05000382/LER-2019-002, (Waterford 3), Control Room Envelope Declared Inoperable Due to Outside Air Intake Isolation Valve Exceeding Closed Stroke Time During Inservice Testing Resulting in Event or Condition + ((Waterford 3), Control Room Envelope Declared Inoperable Due to Outside Air Intake Isolation Valve Exceeding Closed Stroke Time During Inservice Testing Resulting in Event or Condition .)
- W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 + ((Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3)
- 05000382/LER-2020-002, (Waterford 3), Operation or Condition Prohibited by Technical Specifications for Technical Specification 3.4.5.1 (Reactor Coolant System Leakage Detection Instrumentation) Due to Personnel + ((Waterford 3), Operation or Condition Prohibited by Technical Specifications for Technical Specification 3.4.5.1 (Reactor Coolant System Leakage Detection Instrumentation) Due to Personnel.)
- W3F1-2013-0017, (Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + ((Waterford 3), Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- 05000382/LER-2019-007, (Waterford 3), Plant Shutdown Required by Technical Specifications Due to Charging Pump Suction Line Flaw + ((Waterford 3), Plant Shutdown Required by Technical Specifications Due to Charging Pump Suction Line Flaw)
- W3F1-2012-0062, (Waterford 3), RIS 2012-07, Preparation and Scheduling of Operator Licensing Examinations + ((Waterford 3), RIS 2012-07, Preparation and Scheduling of Operator Licensing Examinations)
- W3F1-2004-0120, (Waterford 3), Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology + ((Waterford 3), Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology)
- W3F1-2008-0028, (Waterford 3), Submittal of Annual Report of Individual Monitoring - NRC Form 5 for 2007 Per 1 OCFR20.2206 + ((Waterford 3), Submittal of Annual Report of Individual Monitoring - NRC Form 5 for 2007 Per 1 OCFR20.2206)
- 05000382/LER-2019-006, (Waterford 3), Unplanned Loss of Both Trains of Broad Range Gas Monitors Results in a Condition That Could Have Prevented Fulfillment of a Safety Function + ((Waterford 3), Unplanned Loss of Both Trains of Broad Range Gas Monitors Results in a Condition That Could Have Prevented Fulfillment of a Safety Function)
- 05000382/LER-2020-001, (Waterford 3), Violation of Technical Specification 3.3.3.7.3.a (Broad Range Gas Detection) Due to Operators and Maintenance Technicians Not Performing Procedure Step as Intended + ((Waterford 3), Violation of Technical Specification 3.3.3.7.3.a (Broad Range Gas Detection) Due to Operators and Maintenance Technicians Not Performing Procedure Step as Intended)
- ML051150293 + ((Waterford 3),Annual Radiological Environmental Operating Report - 2004)
- ML14101A467 + ((Waterford 3)- Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation)
- W3F1-2020-0026, (Waterford 3): Annual Radioactive Effluent Release Report - 2019 + ((Waterford 3): Annual Radioactive Effluent Release Report - 2019)
- ML20148M145 + ((Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps)
- ML24050A001 + ((Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP))
- ML24284A284 + ((Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP))
- ML25006A094 + ((Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP))
- ML041620386 + ((Wcgs), Status of Licensing Actions)
- WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness + ((Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness)
- ML070670323 + ((Westinghouse AP1000))
- 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C + ((XEG)-DOE/NRC Forms 741 742 and 743C)
- ZS-2013-0029, (Znps) Independent Spent Fuel Storage Installation (ISFSI) - NRC Staff Request for Design Calculations + ((Znps) Independent Spent Fuel Storage Installation (ISFSI) - NRC Staff Request for Design Calculations)
- ML19319D989 + ((re-issue) to Proposed Amend 32 to License DPR-54,adding Limiting Conditions for Operations of Air Filter Sys)
- 05000346/FIN-2013008-03 + () Failure to Provide Procedure for Cold Shutdown Repair)
- ML062150028 + ()Rais, Hatch, Units 1 & 2, Farley, Units 1 & 2 and Vogtle, Units 1 & 2, RAI, Emergency Plan Revision)
- ML20235X482 + ( * )
- ENS 40485 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 40782 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41341 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41427 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41609 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 40750 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41097 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41197 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41274 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41523 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41651 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 40840 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 40901 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41149 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ENS 41316 + ( * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * )
- ML20084G000 + ( *Cancelled* Public Outreach/Open House to Discuss NRC 2019 End-Of-Cycle Plant Performance Assessment of Clinton Power Station )
- ML13120A474 + ( *Redacted* - Environmental Report )
- ML033160331 + (,Kewaunee & Hatch Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term)
- ML20044F306 + (,Letter to G.Vinson, Illinois Final Regulations to Rats Id: 2012-3 and 10 CFR 30.33(a)(5))
- ML010220135 + (,Meeting Handouts,Key Issues with BWROG)