Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-93-042, NRC Staff Proposes $37,500 Civil Penalty Against Babcock & Wilcox for Alleged Violations of NRC Requirements at Lynchburg Plant +
- ML18100A298 +
- ML20045H896 +
- ML20045F072 +
- ML20044C620 +
- ML20059K275 +
- ML20147B219 +
- ML20129E104 +
- ML20206T870 +
- ML20210M653 +
- ML20059C718 +
- ML20057B730 +
- ML20045D042 +
- ML20045A299 +
- ML20045E330 +
- IR 05000238/1993001 +
- IR 05000245/1993011 +
- ML20035F086 +
- IR 05000338/1993016 +
- ET-NRC-93-3861, Requests That Encl NRC-Requested Catawba Unit 1 SG Leakage Evaluation Be Withheld.Vendor Will Comply W/Requirements of 10CFR2.790 to Provide Proprietary & Nonproprietary Versions of Subj Evaluation W/Affidavit When Matl Prepared +
- 05000499/LER-1993-007-01, :on 930310,determined That Control Room Envelope HVAC Sys Was Not in Mode of Operation Required by TS 3.7.7a & 3.3.3.7b.Caused by Implementation & Use of Computer Program.Review Will Be Performed +
- 05000278/LER-1993-003-03, :on 930310,discovered That Reactor Vessel Head Vents Closed & pressure-temp Data Not Obtained.Caused by Operator Not Fully Moving Control Switches to Auto Position. Head Vents Restored to Proper Position +
- ML20035E051 +
- 05000277/LER-1993-006, :on 930314,personnel May Have Been Unable to Respond to Site in Event of Emergency Due to Severe Snowstorm from 930312-13.Roads Impassable Until 930314. Temporary Sleeping Facilities Provided +
- 05000309/LER-1993-004, :on 930308,upper Level Spray Pump Bldg Fire Door Became Inoperable Due to Personnel Error.Heating Ventilation Unit HV-7 Returned to Svc.Precautions Will Be Placed in Ventilation Procedures +
- 05000338/LER-1993-010, :on 930323,SWP Started Unexpectedly During Performance of Reactor Protection & ESF Response Time Testing.Caused by Inadequate Procedures.Procedures Will Be Revised Prior to Next Refueling Outage +
- ML20035D440 +
- ML20035D611 +
- ML20035E374 +
- LIC-93-0056, Special Rept:On 930303,fire Protection Impairment Permits Initiated for Penetration Seal 19-E-30 & Block Wall Between Corridor 4 & Room 19.Fire Watch Established When Barriers Breached & Seal & Wall Returned to Operability on 930402 +
- LIC-93-0101, Forwards Public Version & Central Files Version of Revised Epips,Including Rev 22 to EPIP-OSC-1,Rev 12 to EPIP-OSC-15 & Rev 13 to EPIP-RR-22.Central Files Version Withheld +
- ML20035E851 +
- ML20035E756 +
- ML20035D647 +
- ML20036A413 +
- ML20035E138 +
- ML20035D101 +
- ML20035E417 +
- ML20035E469 +
- ML20035E258 +
- ML20044D135 +
- ML20035D087 +
- ML20035H761 +
- ML20035D243 +
- ML20035G654 +
- ML20035E432 +
- ML20035E422 +
- ML20036B994 +
- ML20035G586 +
- ST-HL-AE-4406, Forwards Revised Ltrs ST-HL-AE-4395 & ST-HL-AE-4396 Sent to NRC W/Isi Summary Rept for Sys Pressure Tests & ISI Summary Rept for Repairs & Replacements on 930331.Revised Ltrs Reflect Correct Docket 50-498 +