Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17305B689 +
- ML17305B628 +
- ML18151A259 +
- ML20086B989 +
- ML20086B968 +
- ML20086B935 +
- ML20086B893 +
- ML20082L879 +
- ML20081K010 +
- ML20081H102 +
- ML20081G156 +
- ML20081F619 +
- ML20079B874 +
- ML20079B865 +
- ML20079B003 +
- ML20077G221 +
- ML20077E793 +
- ML20077E781 +
- ML20077E624 +
- ML20077E616 +
- ML20092N196 +
- ML20114B508 +
- ML20129H310 +
- ML20129H287 +
- ML20129H168 +
- ML20217C930 +
- HL-1667, Special Rept 1-91-004:on 910502 & 06,listed battery-powered Emergency Lighting Units Inoperable for More than 72 H. Affected battery-powered Emergency Lighting Units Verified Operable by Performing Monthly Insp +
- RBG-35199, Special Rept:On 910409,initial Start Time for Voltage Exceeded Tech Spec 10 Max During Div III Diesel Generator Operability Test.Caused by Field Flash Relay Time Delay & Air Start Motors.Air Start Motors Replaced +
- B13834, Application for Amend 47 to License NPF-49,modifying Tech Spec 4.6.4.2.b.4, Electric Hydrogen Recombiners, to Provide Variable Acceptance Criteria for Flow Testing Containment Pressures +
- ML20217C935 +
- ML20217C887 +
- ML20085C433 +
- 05000353/LER-1991-013, :on 910508,trains of SGTS Declared Operable & Tech Spec Action 3.0.3 Exited.Caused by Cognitive Personnel Error.Blocking Permits Reviewed,Operations Personnel Counseled & Existing Guidance Reviewed +
- 05000333/LER-1991-006-01, :on 910507,manual Reactor Shutdown Occurred Due to Inoperability of Both Low Pressure Coolant Injection Subsystems.Caused Mechancial Failure of One Valve in Each of Two Sys.Root Cause Investigation Started +
- 05000277/LER-1991-011-01, :on 910508,discovered That ST 16.2.1, Fire Sys Weekly Check Inadvertently Deferred Beyond TS Time Limit. Caused by Misleading Test Frequency Listed on Test.Test Revised & Event Reviewed W/Personnel +
- 05000354/LER-1991-009-01, :on 910508,full Reactor Protection Sys Actuation Occurred Due to Electronic Spiking of Intermediate Range Monitor G.Caused by Equipment Malfunction.Monitor Replaced Prior to Plant Return to Power +
- 05000325/LER-1991-013, :on 910507,coincident Hpic/Rcic Discovered Inoperable.Caused by Loss of RCIC High Steam Flow Transmitter.Tightening of Leaking Fitting & Venting & Filling of Sensing Lines Performed +
- 05000354/LER-1991-008-01, :on 910507,reactor Scram on Low Water Level Occurred.Caused by Personnel Error.Counseling Controls Technician Re self-verification & Attention to Detail & Implementing Design Change +
- 05000259/LER-1991-006-02, :on 910507,unplanned ESF Actuation Occurred When Control Room Emergency Ventilation Sys Initiated. Caused by Design Which Made It Difficult to Perform Work. Util Will Evaluate Need for Design Change +
- 05000338/LER-1991-011, :on 910511,source of Leakage Identified Between B Cold Leg Loop Stop Valve & Isolation Valve for 3/4 Inch Upper Disc Pressurization Line.Caused by High Cycle Fatigue. Action Statement of Tech Spec 3.4.6.2 Entered +
- 05000254/LER-1991-012, :on 910507,HPCI Turbine Stop Valve Failed to Stroke Fully Open During Manual Initiation Test.Caused by Long Bushing in Stuffing Box of Stop Valve Sliding Down. Stuffing Boxes,Bushings & Pins Replaced +
- ML20024H801 +
- ML20024H781 +
- ML19332J899 +
- ML20024H804 +
- ML20024H803 +
- ML20024H793 +
- ML20024H774 +
- 05000272/LER-1991-020, :on 910510,control Room General Area Radiation Monitoring Sys Monitor Spiked High.Caused by Equipment Failure.Failed Channel Light Socket Replaced +
- IR 05000400/1991007 +