Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18039A533 +
- ML20117H353 +
- ML20117F803 +
- ML20117D780 +
- ML20117D745 +
- ML20117C618 +
- ML20112B041 +
- ML20111A894 +
- ML20111A694 +
- ML20108E338 +
- ML20108E186 +
- ML20108D957 +
- NRC-96-0031, Submits Response to Violations Noted in Insp Rept 50-341/96-02.Corrective Actions:Increased Frequency Surveillance Performance Form for E1150-F603B Revised to Currently Include Cautionary Step +
- ML20108D916 +
- ML20108D902 +
- ML20108D891 +
- ML20108D794 +
- ML20108D786 +
- ML20108D476 +
- ML20108D381 +
- ML20108D169 +
- ML20108C912 +
- ML20108C921 +
- ML20108C875 +
- ML20108C630 +
- ML20108C619 +
- ML20140B642 +
- ML20134J950 +
- ML20198Q472 +
- ML20210H372 +
- NSD-NRC-96-4715, Forwards Westinghouse Response to NRC Requests for Addl Info on AP600 Design Certification Program.Encl 1 Contains Responses to 69 follow-on Questions Pertaining to Level 2 PRA Modeling & Severe Accident Issues +
- NSD-NRC-96-4716, Forwards Matl Presented to NRC Technical Staff on 960503 at Meeting to Further Discuss Thermal Hydraulic Uncertainty Issue.Matl Suppls Presentation Matl from 960229 Meeting & Written Submittal of 960412 +
- 3F0596-07, Provides Interpretation of Status of Exemption from 10CFR70.24, Criticality Accident Requirements +
- B15697, Withdraws Request for Exception Proposed for Surveillance Requirement 4.8.1.2 from 950526 & 1020 Applications for Amend to License DPR-65 +
- NSD-NRC-96-4699, Responds to NRC Re Westinghouse AP600 TS, Documenting Westinghouse Approach to Completing AP600 Ts,Per Discussion During 960419 Meeting W/Nrc +
- NRC-96-0050, Provides Response to Re Util Request to Increase Allowed out-of-service Time for 1 Onsite AC Electrical Power Division +
- GO2-96-095, Forwards Rev 31 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 +
- ML20199G875 +
- 05000266/LER-1996-001, :on 960405,inadvertent ESF Actuation in Train B Due to DC Sys Ground Occurred.Caused by Inadequate Ground Search Technique.Site Engineering Personnel Will Be Involved in Ground Detection Needed on DC Sys +
- 05000259/LER-1996-003-03, :on 960403,Unit 2 Received Unplanned ESF Actuation.Caused by Electrician Introduced Fault Into ECCS Logic While Preparing Wires for Termination in Panel 2-9-81. Problem Evaluation Rept Initiated +
- 05000271/LER-1996-009, :on 960404,determined Combustible Polystyrene Matl Present in Joints Between Turbine,Radwaste,Reactor & Control Bldgs.Caused by Personnel Error.Two H Roving Fire Watch Established in Adjoining Radwaste Bldg +
- ML20108D316 +
- PY-CEI-NRR-2050, Forwards Four Copies of Rev 22 to PNPP Security Plan.Encl Withheld +
- ML20108E048 +
- L-96-117, Responds to RAI Re Proposed Amend Concerning Thermal Power Uprate +
- GO2-96-094, Withdraws Request for Exemption from Requirement in 10CFR73.55(e)(1), Detection Aid Requirements +
- GO2-96-097, Informs That Schedule for Resolution Has Been Updated to Reflect Recent Changes in Methodology,Available Fire Barrier Matls & Levelization of Available Resources,Per GL 92-08 +
- ML16141B017 +
- ML17228B484 +
- ML15218A264 +