ML20108C875
| ML20108C875 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/03/1996 |
| From: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20108C879 | List: |
| References | |
| NUDOCS 9605070199 | |
| Download: ML20108C875 (2) | |
Text
_ _
Southsrn Nucim Operating Company Post Off,ce Box 1295 Birmingham, Alabama 35201 Telephone (205) 868-5131 k
L Southem Nudear Operating Company o.ve uorey Vice President Farley Project the southem electnc system May 3, 1996 Docket No.: 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 2 Steam Generator F* Technical Specification Amendment Ladies and Gentlemen.
By letter dated April 22,1996, Southern Nuclear Operating Company requested an amendment to the Farley Unit 2 Technical Specifications concerning F* The amendment revised the definition of the F* distance to 1.54 inches plus an allowance for eddy current uncertainty. In discussions with the NRC Staff, Southern Nuclear has been requested to revise the submittal to include a location where the eddy current uncertainty will be documented.
Consequently, the amendment is being revised to state that the allowance for eddy current uncertainty will be documented in the steam generator eddy current inspection procedure.
A revised technical specification page is attached. As noted in the April 22,1996 submittal, this revised technical specification page is based on approval of the alternate repair criteria for outside diameter stress corrosion cracking at tube support plate intersections.
The existing 10 CFR 50.92 Significant IIazards Evaluation is not affected by this change and remains valid.
07004' l
9605070199 960503 PDR ADOCK 05000364
_t P
PDR fcCA i o. %d f
\\
g l
4 i
i U. S. Nuclear Regulatory Commission Page 2 i
i If you have any questions, please advise.
Respectfully submitted, 1
SOUTHERN NUCLEAR OPERATING COMPANY f
f ))]4rui Dave Morey 3
Sworn to and subscribed before me thisj dayof hdl.t, 1996
&Wnni$6
' Notary'Public 0
My Commission Erpires&xM, /99 7 1
y-a REM / cit:fsttrev. doc Attachments cc:
Mr. S. D. Ebneter, Region II Administrator Mr. B. L. Siegel, NRR Senior Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector Dr. D. E. Willliamson, State Department of Public Health Mr. T. A. Reed, NRR Materials and Chemicals Engineering Branch i
.