ML20108E186

From kanterella
Jump to navigation Jump to search
Submits Rev 13,Issue 2 to Station Security Plan.Encl Withheld
ML20108E186
Person / Time
Site: Pilgrim
Issue date: 05/03/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-LTR#96-047, BECO-LTR#96-47, NUDOCS 9605100051
Download: ML20108E186 (2)


Text

- - - _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - - - _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ - _ _ - - _ _

l 1

SAFEGUARDS INFORMATION 10CFR50.54(p)(2)

Boston Edison Pilgrim Nuciear Power stat,on Rocky Hdi Fioad Plymouth, Massacnusetts 02360 E. T. Boulette, PhD Senior vice President - Nuclear May 3, 1996

- BECo Ltr. #96-047 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station Security Plan. Issue 2. Revision 13 In accordance with 10CFR50.54(p)(2), Boston Edison Company is submitting Revision 13 to the Pilgrim Station Security Plan. This revision is being submitted due to:

New vehicle barrier system, Reorganization, and GL96-02," Reconsideration of Nuclear Power Plant Security Requirements Associated with an Intemal Threat".

These changes do not decrease the safeguards effectiveness of the Pilgrim Nuclear Power Station Security Plan and were approved by the Operations Review Committee. A synopsis of proposed changes is attached. The enclosed Revision 13 contains safeguards information and must be protected against unauthorized disclosure in accordance with 10CFR73.21.

N E. T. Boulette, PhD MTL/radmisc/SECPlan 1 Original and 3 copies l

Enclosure cc: See next page ENCLOSURE CONTAINS SAFEGUARDS 100023 INFORMATION. UPON SEPARATION THIS PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION f

9 SAFEGUARDS INFORMATION DCC Desk Page 2 cc:

Mr. Alan B. Wang, Project Manager (w/o Enclosure)

Project Directorate I Mail Stop: 1482 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission (Two Copies)

Region I 475 Allendale Road King of Prussia PA 19406 Senior Resident inspector (w/o Enclosure)

Pilgrim Nuclear Power Station l

l ENCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION THIS PAGE IS DECONTROLLED.

SAFEGUARDS INFORMATION