Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17263A685 +
- Press Release-94-093, NRC Proposes to Amend Regulations to Add Additional Fuel Storage Cask Design to Approved List +
- ML17310B339 +
- ML17310B335 +
- ML18059B048 +
- ML18059B046 +
- ML18059B043 +
- ML20070H232 +
- ML20069K008 +
- ML20069J985 +
- ML20069H453 +
- ML20069H287 +
- ML20069H139 +
- ML20069G873 +
- ML20069G101 +
- ML20069F965 +
- ML20069F747 +
- ML20069F459 +
- ML20069F446 +
- ML20069F340 +
- ML20069F332 +
- ML20069E767 +
- ML20069E760 +
- ML20069E725 +
- ML20069E680 +
- ML20069E672 +
- ML20071G155 +
- IR 05000413/1994014 +
- TAC:M85388 +
- 3F0694-05, Forwards Rev 6-4 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) +
- 3F0694-06, Forwards Rev 7 to Training & Qualification Plan.Rev Withheld +
- RBG-40616, Forwards Required Certificate of Insurance Verifying Property Policies for Protection Against Financial Losses Due to Nuclear Accidents for River Bend Station +
- NRC-94-4158, Discusses AP600 Design Certification Review Schedule +
- 0CAN069402, Forwards Response to Violation Noted in Insp Repts 50-313/94-15 & 50-368/94-15.Corrective Actions:Policy Implemented to Address Failures & Retest Criteria in General Employee Training +
- ML20069F095 +
- 1CAN069402, Responds to 940505 Request for Verification of Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity +
- PY-CEI-NRR-1804, Responds to NRC Re Violations Noted in Insp Rept 50-440/94-04 on 940130-0309.Corrective Actions:Reviewed Incident W/Involved Shift Supervisor +
- PY-CEI-NRR-1809, Forwards Notification of Rev to Alert Level for Two Instruments in Loose Part Detection Sys,Per Reg Guide 1.33 +
- 05000334/LER-1994-004-01, :on 940504,water Found Leaking from Pipe Penetration in East Trench of Pab & on 940506,plant Shutdown Initiated Due to Status of Efforts to Determine Source of Leakage.Two Foot Section of Pipe Replaced +
- 05000461/LER-1994-005, :on 940408,while Reviewing Calculations,Concern Was Raised About Setpoints for Undervoltage Relay.Caused by Initial Design Error.Operator Has Received Training on second-level Undervoltage Scheme +
- 05000445/LER-1994-002-01, :on 940510,control Room Missile Shield Door Was Declared Inoperable.Caused by Broken Missile Shield Door Latching Mechanism.Door Was Repaired & Control Room HVAC System Was Restored to Operable Status +
- ML20069H040 +
- IR 05000280/1994013 +
- ML18151A345 +
- ML18011A484 +
- 05000397/LER-1993-001, :on 930213,determined That Both Trains of SPC of RHR System Were Inoperable Due to LOP Coincident W/Lpci Safety Function.Reviews & Safety Evaluations Has Been Enhanced +
- IR 05000397/1994002 +
- IR 05000275/1994007 +
- IR 05000269/1994030 +
- ML14181A559 +